HomeMy WebLinkAbout20080868 Ver 3_More Info Received_20130411 O�WAr�9 Michael F.Easley,Governor
William G.Ross Jr.,Secretary
North Carolina Department of Environment and Natural Resources
CO r Coleen H.Sullins, Director
Division of Water Quality
DWQ Project No.: OB- gig V1L<, 3 County: '2>6A1A1F Q-r
Applicant: C'e s t�asP3.i��6 C�r^4A�►� -J�7,4 C. CVY(Z0 C. �ur-ACsg
Project Name: SZ0,gcA-r%e4 W1C Nw`? you
Date of Issuance of 401 Water Quality Certification: 2, a v c19
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules,and any subsequent modifications,the applicant is required to return this certificate to the
401/Wetlands Unit,North Carolina Division of Water Quality, 1650 Mail Service Center,Raleigh,NC,
27699-1650. This form may be returned to DWQ by the applicant,the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Appli is Certifica y
1, 4s �. EFF26Y hereby state that,to the best of my abilities, due care
and dili Nus used in the observation of the construction such that the construction was observed to
be built thin substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules,the a v plans specifications, and other suppo ng aterials.
Signature: /v�r^^� Date:
1
Agent's Certifi tion
1, , hereby state that,to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules,the approved plans and specifications,and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
1, , as a duly registered Professional (i.e.,
Engineer,Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized
to observe (periodically,weekly, full time)the construction of the project, for the Permitee hereby state
that,to the best of my abilities, due care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules,the approved plans and specifications, and other
supporting materials.
Signature Registration No.
Date LZ�O9aW[A
WEn ANDS ANDS A 8
RANCH
ARA
NO
North Carolina Division of Water Quality,401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650(Mailing Address)
2321 Crabtree Blvd.,Raleigh, NC 27604-2260(Location)
919-733-1786(phone),919-733-6893(fax), http://h2o.enr.state.nc.us/ncwetlands/
Higgins, Karen
From: JFurness@Pcsphosphate.com
Sent: Thursday, April 11, 2013 2:26 PM
To: Higgins, Karen; Adams, Amy
Cc: scooper@czr-inc.com;jberger@czr-inc.com
Subject: Fw: PCS creeks macroinvertebrate sampling in May 2013
Karen and Amy:
As a condition of 401 WQ Certification 3771, DWQ#2008-0868, PCS is required to notify DWQ in advance of planned
macroinvertebrate sampling in area estuarine creeks,to allow DWQ biologists the opportunity to observe, if interested
and available. CZR Incorporated biologists will be sweep sampling invertebrates from Jacks,Jacobs, Drinkwater, Project
Area 2,Tooley, Muddy, Little, Long, Porter and Duck Creeks and Huddles Cut in mid to late May. If anyone on your staff
is interested in observing, please contact Sam Cooper or Julia Berger at CZR Incorporated in Wilmington at the contact
phone number or email address in Sam Cooper's email below, which outlines CZR's planned sampling.
Sincerely,
Jeff
Jeff Furness
Senior Scientist
PCS Phosphate Co., Inc.
1530 NC Hwy 306 S
Aurora, NC 27806
Ph: (252) 322-8249
Fax: (252) 322-4444
----- Forwarded by Jeff Furness/EnvA/Aurora/Phosphate/PCS on 04/11/2013
02:17 PM -----
"Sam Cooper"
<scooper@czr-inc.
com> To
<JFurness@Pcsp osp ate.com>
04/11/2013 11:04 cc
AM "'Julia Berger"'
<ierer@czr-inc.com>
Subject
PCS creeks macoinvertebrate
sampling in May 2013
1
Jeff,
Regarding notification to DWQ of upcoming PCS macroinvertebrate sampling, we propose 14-16 May, 21-23 May and
28-30 May as the primary sampling windows. Our plan is to collect from all sites over the course of two weeks, but
actual dates and times are subject to the weather and schedule.
Where efficient, we may combine with other ongoing PCS Creek data collections. It was helpful last year to separate
some of the land/sweep collection sites and hike-in ponar sites from sites accessed via boat. We can e-mail or
coordinate with interested parties the Friday prior to each sampling week with more details.
Samuel Cooper
CZR Incorporated
4709 College Acres Drive
Suite#2
Wilmington, NC 28403
910 392-9253 - phone
910 392-9139 -fax
scooerczr-inc.com
2