Loading...
HomeMy WebLinkAbout20080868 Ver 3_More Info Received_20130411 O�WAr�9 Michael F.Easley,Governor William G.Ross Jr.,Secretary North Carolina Department of Environment and Natural Resources CO r Coleen H.Sullins, Director Division of Water Quality DWQ Project No.: OB- gig V1L<, 3 County: '2>6A1A1F Q-r Applicant: C'e s t�asP3.i��6 C�r^4A�►� -J�7,4 C. CVY(Z0 C. �ur-ACsg Project Name: SZ0,gcA-r%e4 W1C Nw`? you Date of Issuance of 401 Water Quality Certification: 2, a v c19 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and any subsequent modifications,the applicant is required to return this certificate to the 401/Wetlands Unit,North Carolina Division of Water Quality, 1650 Mail Service Center,Raleigh,NC, 27699-1650. This form may be returned to DWQ by the applicant,the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Appli is Certifica y 1, 4s �. EFF26Y hereby state that,to the best of my abilities, due care and dili Nus used in the observation of the construction such that the construction was observed to be built thin substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the a v plans specifications, and other suppo ng aterials. Signature: /v�r^^� Date: 1 Agent's Certifi tion 1, , hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer,Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,weekly, full time)the construction of the project, for the Permitee hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. Signature Registration No. Date LZ�O9aW[A WEn ANDS ANDS A 8 RANCH ARA NO North Carolina Division of Water Quality,401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650(Mailing Address) 2321 Crabtree Blvd.,Raleigh, NC 27604-2260(Location) 919-733-1786(phone),919-733-6893(fax), http://h2o.enr.state.nc.us/ncwetlands/ Higgins, Karen From: JFurness@Pcsphosphate.com Sent: Thursday, April 11, 2013 2:26 PM To: Higgins, Karen; Adams, Amy Cc: scooper@czr-inc.com;jberger@czr-inc.com Subject: Fw: PCS creeks macroinvertebrate sampling in May 2013 Karen and Amy: As a condition of 401 WQ Certification 3771, DWQ#2008-0868, PCS is required to notify DWQ in advance of planned macroinvertebrate sampling in area estuarine creeks,to allow DWQ biologists the opportunity to observe, if interested and available. CZR Incorporated biologists will be sweep sampling invertebrates from Jacks,Jacobs, Drinkwater, Project Area 2,Tooley, Muddy, Little, Long, Porter and Duck Creeks and Huddles Cut in mid to late May. If anyone on your staff is interested in observing, please contact Sam Cooper or Julia Berger at CZR Incorporated in Wilmington at the contact phone number or email address in Sam Cooper's email below, which outlines CZR's planned sampling. Sincerely, Jeff Jeff Furness Senior Scientist PCS Phosphate Co., Inc. 1530 NC Hwy 306 S Aurora, NC 27806 Ph: (252) 322-8249 Fax: (252) 322-4444 ----- Forwarded by Jeff Furness/EnvA/Aurora/Phosphate/PCS on 04/11/2013 02:17 PM ----- "Sam Cooper" <scooper@czr-inc. com> To <JFurness@Pcsp osp ate.com> 04/11/2013 11:04 cc AM "'Julia Berger"' <ierer@czr-inc.com> Subject PCS creeks macoinvertebrate sampling in May 2013 1 Jeff, Regarding notification to DWQ of upcoming PCS macroinvertebrate sampling, we propose 14-16 May, 21-23 May and 28-30 May as the primary sampling windows. Our plan is to collect from all sites over the course of two weeks, but actual dates and times are subject to the weather and schedule. Where efficient, we may combine with other ongoing PCS Creek data collections. It was helpful last year to separate some of the land/sweep collection sites and hike-in ponar sites from sites accessed via boat. We can e-mail or coordinate with interested parties the Friday prior to each sampling week with more details. Samuel Cooper CZR Incorporated 4709 College Acres Drive Suite#2 Wilmington, NC 28403 910 392-9253 - phone 910 392-9139 -fax scooerczr-inc.com 2