Loading...
HomeMy WebLinkAbout20181725 Ver 2_Pre-Filing Meeting Request_20201211ID#* 20181725 Version* 2 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 12/11/2020 Contact Name * Jon Becker Contact Email Address* jon.becker@wsp.com Project Name* Petworth Court Stream Bank Stabilization Project Owner* City of Raleigh Project County* Wake Owner Address: Street Address 127 West Hargett Street Address Line 2 8th Floor City State / Province / FL-gion Raleigh NC Fbstal / Zip Code Country 27601 us Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit F- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 18-1725 Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below.* The Petworth Court Stream Bank Stabilization project was authorized under the United States Army Corps of Engineers (USACE) Section 404 Nationwide Permit (NWP) 13 and associated North Carolina Division of Water Resources (NCDWR) Section 401 Water Quality Certification (WQC) in January 2019. The project included the installation of an imbricated rock wall along the western bank of an upper tributary of Mine Creek and regrading the eastern bank at a lower elevation and flatter slope. The stream bed was modified only as needed for construction access. After project construction was completed in March 2020, several severe rainfall events in the spring and summer resulted in additional bank erosion and channel migration adjacent to the project area. Without time for vegetation to establish a root system after construction, the channel has migrated much more quickly than anticipated. The rainfall and resultant stream flows resulted in bank erosion and general channel instability. To address these issues and prevent further damage, improvements were made that included approximately 30 feet each of rebuilt footer for imbricated rock, additional/extended imbricated rock, and constructed riffle. These changes exceeded the limits of disturbance (LOD) from the original project and includes additional buffer and stream impacts. The City of Raleigh is requesting a USACE Section 404 NWP 13 and NCDWR Section 401 WQC for the additional impacts that resulted from the project improvements. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 0%0 !erX4,t Submittal Date 12/11/2020