Loading...
HomeMy WebLinkAbout20041764 Ver 4_Emails_20101228Lucas, Annette From: Landry, Natalie Sent: Tuesday, December 28, 2010 5:17 PM To: Austin.Watts@kimley-horn.com; Kevin Martin Cc: jimspeake@gmail.com; mark.goldsmith@wal-mart.com; Todd.StJohn@kimley-horn.com; Mcmillan, Ian; Lucas, Annette Subject: Shiloh Crossing - Request For Additional Information Attachments: Shiloh Cross i ng_Req uest For Additional Info.PDF Hello Austin and Kevin, Please see attached Request for Additional Information regarding the Pre-Construction Notification application for Shiloh Crossing (DWQ#04-1764 V4). Thank you. Natalie Natalie Landry DENR - Surface Water Protection 3800 Barrett Drive Raleigh, NC 27609 (919) 791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. N DENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen Ft. Sullins Dee Freeman Governor Director Secretary December 28, 2010 CERTIFIED MAIL, #7008 1300 0000 1109 4864 RETURN RFCF.IPT REQUESTED Austin L. Watts Kimley-Horn and Associates, Inc, 4651 Charlotte Park Drive Charlotte WC 28217 Subject Property: Shiloh Crossing Ut to Stirrup Iron Creek [030402, 27-33-4-2, C. tiSWI REQUEST FOR I LORE INFO&MATION Dear Mr. Watts: DWQ Project #04-1764 Ver, 4 Wake County On November 17, 20110, the Division of Water Quality (DWQ) received your Response to Notice of Violation NOV- 2010AVQ-0012 and application, both dated November 15, 2010, to till or otherwise impact 0.479 acres`of wetland, 349 !!near feet of perennial stream (75 linear feet of temporary impact and 274 linear feet of permanent impact) and 20,495 square feet of Zane I Neuse River basin protected riparian buffers and 21,607 square feet of /.one 2 reuse River basin protected riparian buffers to construct the proposed regional shopping center at the site. The DWQ has determined that your response and application were incomplete andr'or provided inaccurate information as discussed below. The'DWQ will require additional information in order to process your application to impact protected wetlands and/or streams can the subject property. Therefore. unless we receive five copies of the additional information requested below, we will have to place this project on hold as incomplete until w-c received this additional information. If we do not receive the requested in ormatton, your project will be faunally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested: Items (4) and (9) of the NO%' Requested Response Items have not been satisfactorily addressed. The as-built plan sheets must be full-sized (and at a scale of 1" = 20' or larger) with I' topographic lines, the stormwater drainage :v,tem. building and road footprints, and all other relevant details tar the DWQ's review-. Please provide a completely filled out Level Spreader Supplement [orm with ALL required items.. (For example, no dimensions 11or the revel Spreader ;?4 by-pass were provided.) This form is available at: hup _pllftat,rucirnr ar wrh Get tt} tL bn?n tTtattual. In addition, complete documentation for the buffer authors/ation has not been provided. Please provide. 2. Itern (5) of the NOV Requested Response Items has not been satisfactorily addressed. The plan sheets must be full- slrcd (and at a scale of 1" = 20` or larger) with I' topographic lines. the stormwater drainage ystem, building and road i'Ootprints, footprints of the dittu,?e fluor devices and all other rele -,ant details for the [Ak'Q"s review. Please pi ovtde a completely typed out Level Spreader `supplement 1-ortn with ALL required items. This form is One ti?,rthCarolina ,,1 itttrr?rtlJ T" 'ht.a r: ')Ie s,on of Vvx- Q]!,fy palo'c3h Re(poral cf;cp Sa l3ce `?vate_r P-Oecticn F", 91 i ?9' 4:00 CuStufner ser lce ^c? xxti',-we r,?ab,ty ? I@18Pdai.So-,r:e>Certer Raie.q:, 44C:76991628 FA 9 783-7-11 877.611:3-8?38 An +y339t'-`JrYfk..:r`,; .. _ ro °: Rrcyi _ , _ __ 744, r-,;f ,^?5f °a;?e, Shiloh Crossing Decemher 28. 2010 P3 _r 2 ai a: gable at hi-q p??t 1 ncdenr. 11 "eb "mss- -4-brIP7manuaI. Please he sure to inc lode detal IN, when needed, fort 1 aures. 3. Item (6) of the NOV Requested Response Item; has not been satisfactorily- addressed. Hie as-built plan Sheets trust be full-sizcd (anti at a scale of I" - 20' or larger) with I' tolx)graphic line;. the storm%vater drainage system, building and road footprints. and all other relevant details for the DWQ's review. Please provide a completely filled out Storniv atcr Wetland Supplement Farm with al_l. required items (the form that was provided is incomplete and Joes not include the Required licros Checklist). This form is available at: 1?<<I, p?,rtaE n<<it?r,r ur; ti???h tict??ti, u hmp-manual. I he D%k'Q assumes that you arc extending the outlet pipe of Wetland A as shown on the plan. Please verity. Confirm that the drain valve in the riser structure of Wetland A w ill be operational as designed and provide a timeframe. 4. Item (3) of the. NOV Requested Response items has not been satisfactorily addressed. The proposal states `.that a notch be provided in the bed rock in order to lower the stream invert...'. Please demonstrate and provide a scaled profile of the stream (at Crossing 1) and shoe how water a ill tlow through the culvert during; the 10 and 25 year storm events based on full build-out conditions (completion of Phases 2l and 3). Provide headwater and tailwater conditions for these storms a well. 5. Please describe how the notch will be installed in the bed rock. The proposal states. "The current accumulation of sedunent w ithin the culvert will be removed and properly disposed ofpriorto notching the bedrock and only natural sediment bed loads will subsequently pass through." Please add that the "current accumulation of sediment and debris on the upstream end of the culvert will be removed and properly disposed of prior to notching the bedrex k." To the monitoring, add "depth and extent ofsediment deposition, if any." Please submit this information U ithin 30 calendar days of the date of this letter to; 401 Oversig hVI-xpre s Review Permitting Unit, 1630 Mail Service Center. Raleigh, N('27699-1650 (hand deliveries only to Archdale Building 9's Floor receptionist, Director's Office). It'wte do not receive this requested information within 30 calendar days of the date of this letter. your project will be withdrawn and you w ill need to reapply with a new application and a new fee. 'phis letter only addresses the application review and dues not authorize any impacts to wetlands, waters or protected buffers. Please be aware that an, impacts requested within your application are not authorized (at this time) by the D11 Q, Please call me or Danny Smith at 9 1 9-79 1 425 5 it you have any questions regarding; this letter. "ineere y, yanny Smit Regional (ftice Supervisor Surface Water Protection Section cc: Raleigh R(? - Water Quality John I lennessv. NPS Assistance and Compliance Oversight Unit tan McMillan, .401 Wetlands Permitting ["tilt, 1650 NTSC, Raleigh. NC 27614 I ?SACF Raleigh Regulatory Field Officc Wake ('Oiir,ty Water Quahty Div.. 336 1 ayct:e? ille Street, Raleigh. tiC 27602 ('ltrts Roberts, Durham County, 120 E. Parrish St., I" Fluor. Durham, NC 27701 Keith Billy, Town of %lorrisville, 260 `1'occn Hall Dr.. Suite 11,'0orrisville, NC 27560 `hold fit. Jihn. ftiin,le?-Horn, PO f3_ic 3 3l)6S. Role:??h. ?( 2,63E>-3tk, Kevin Martin, S&,F(*, 11010 Raven Ridge Road, Raleigh. NC 27614 Bradley Bo+c gin, . Priest, Craven & Assoc „. 8WIl C'ompiiter Dr., Raleigh, NC 27609