Loading...
HomeMy WebLinkAbout20201925 Ver 1_Pre-Filing Meeting Request_20201210ID#* 20201925 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 12/10/2020 Contact Name * Sara Sherman Contact Email Address* sara.j.sherman@gmail.com Project Name* Eno River Boating Access Area Renovation Project Owner* NC Wildlife Resources Commission Project County* Durham Owner Address: Street Address 1720 Mail Service Center Address Line 2 oty State / Province / Region Raleigh NC Postal / Zip Code Country 27699 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? no Please give a brief project description below. This is a renovation project of an existing NCWRC public boat ramp facility on Falls Lake/Neuse River. This project will apply for a NWP 3 from USACE and will require written approval because an 8'-w4de floating dock is requested (wider than 6'). A Neuse River Buffer Authorization will also be required. The project consists of removing the existing boat ramp and constructing a new single -lane concrete boat ramp that is 15' x 129'. The proposed floating dock is 60' x 8'. The existing asphalt parking lot will be resurfaced and a small expansion will be added to create a row of single car parking spaces. Please give a couple of dates you are available for a meeting. 12/17/2020 1 /5/2021 12/15/2020 Please attach the documentation you would like to have the meeting about. EnoRiver pcn plans.pdf 1.72MB Eno River location map.pdf 111.71KB pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 11_ I tlL �_9141 11 !._Ir Submittal Date 12/10/2020 ENO RIVER BAARenovation ProjectVicinity MapsDurham,Durham County, NC NORTH CAROLINA WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEERING & LANDS MANAGEMENTScale 1" = 40'4040800Adolphe St - Gravel RoadSR 1632FA L L S L A K E / N E U S E R I V E R : N S W , W S - I V , C A 73.8(<80' designstandard)Gentle slopedbeach area -common for paddlecraftlaunchingExisting RampLower portion of rampis planks. Some areout of alignmentExisting 6'-wide floating dockExisting Gravel Overflow ParkingGeometry isn't to standard for trailer vehiclesNormal Water LevelFull Pool @ Elev 252Neuse River Buffer Zone 1Neuse River Buffer Zone 2Project is within NCWRC'sButner-Falls Game Land NORTH CAROLINA WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEERING & LANDS MANAGEMENTScale 1" = 40'4040800Adolphe St - Gravel RoadSR 1632FA L L S L A K E / N E U S E R I V E R : N S W , W S - I V , C A Proposed: Expand Parking Lot width to meettrailer design standards and constructnew row of single vehicle spaces4270 ft² additional area / some clearing requiredProposed: Extend driveway culvertand upgrade overflow parking toaccommodate trailer vehicles NORTH CAROLINA WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEERING & LANDS MANAGEMENTScale 1" = 40'4040800Adolphe St - Gravel RoadSR 1632FA L L S L A K E / N E U S E R I V E R : N S W , W S - I V , C A Proposed: Expand Parking Lot width to meettrailer design standards and constructnew row of single vehicle spaces4270 ft² additional area / some clearing requiredProposed: Extend driveway culvertand upgrade overflow parking toaccommodate trailer vehicles NORTH CAROLINA WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEERING & LANDS MANAGEMENTScale 1" = 10'1010200129' Ramp15.060' Floating Dock8.08.0Abutment22.0Sidealk NORTH CAROLINA WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEERING & LANDS MANAGEMENT20' VerticalCurve109' @ 14%Total RampLength = 129'Begin Vert. CurveEdge of AshaltEl.=257.2'El.=257.1'El.=256.9'El.=256.5'End of CurveBegin 14% SlopeEl.=256.0'5'5'5'5'20' Vertical CurveVERTICAL CURVE DETAILNOT TO SCALENew Ramp will be in same location as existing.New Ramp will be same length as existing.Minor geometry changes include a vertical curvetransition at the top of the ramp to help driversand a slope increase to 14%.The new ramp will result in 0.194 yd³ of net excavationbelow normal full pool water level.4' depth@ low water60' Floating Dock (3 @20' each)Bollards8'x8'x2' Concrete AbutmentEl.=256.0'8.06.3LevelSidewalkNCWRC Floating dock sections arepre-fabricated at the agency's central prison facilty.They are delivered to the site and insatlled bythe in-house construction crew. PROJECT LOCATION NCWRC Eno River BAA 40 Rodolphe St Durham, NC