Loading...
HomeMy WebLinkAbout20201934 Ver 1_Pre-Filing Meeting Request_20201210 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20201934 Version* 1 Regional Office* Mooresville Regional Office-(704)663-1699 Reviewer List* Donna Hood Pre-Filing Meeting Request submitted 12/10/2020 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Larry Thompson Contact Email Address* Ihompson@ncdot.gov Project Name* Cabarrus Pipe 15 on SR 1616 over Mill Creek; 17BP.10.PE.4 Project Owner* NCDOT Highway Division 10 Project County* Cabarrus Owner Address: Street Address 716 W Main Street Address Line 2 City State/Rovince/Region Albemarle NC Fbstal/Zip Code Country 28001 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Donna Hood Please give a brief project description below.* NCDOT proposes to replace the existing functionally deficient culvert on SR 1616(Tuckaseegee Road)at Mill Creek with an improved modern culvert; STV Engineers is providing planning,design and Section 404/401 services on behalf of Division 10;an MCDC has been prepared; a delineation of waters of the U.S. has been completed-jurisdictional waters of the U.S. in the project area include Mill Creek and an unnamed tributary of Mill Creek;there are no wetlands in the project area; proposed culvert replacement will include an offsite detour;the project has a Let date of March 3,2021. Please give a couple of dates you are available for a meeting. 12/16/2020 12/17/2020 12/18/2020 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature ��.s*,err‹ r Submittal Date 12/10/2020