HomeMy WebLinkAbout20100765 Ver 1_More Info Requested_20101223Strickland, Bev
From: Steenhuis, Joanne
Sent: Thursday, December 23, 2010 10:49 AM
To: Strickland, Bev
Subject: FW: ONWASA
Attachments: 6 of 12 ONWASA PCN.pdf
DWQ # 10 0765
From: Vinay, Robert [maiIto: Robert.Vinay(aarcadis-us.coml
Sent: Thursday, December 23, 2010 10:33 AM
To: Steenhuis, Joanne
Subject: ONWASA
Joanne, PCN revised Page 6 of 12 attached. Robert
Robert N. Vinay, PE I Project Manager I robert.vinay@arcadis-us.com
ARCADIS U.S., Inc. 1 801 Corporate Center Drive, Suite 300 1 Raleigh, North Carolina 27607
T. 919.854.1282 1 M. 919.906.8509 1 F. 919.854.5448
www.arcadis-us.com
ARCADIS, Imagine the result
xintina this email.
NOTICE: This e-mail and any files transmitted with it are the property of ARCADIS U.S., Inc. and its affiliates. All rights,
including without limitation copyright, are reserved. The proprietary information contained in this e-mail message, and any
files transmitted with it, is intended for the use of the recipient(s) named above. If the reader of this e-mail is not the
intended recipient, you are hereby notified that you have received this e-mail in error and that any review, distribution or
copying of this e-mail or any files transmitted with it is strictly prohibited. If you have received this e-mail in error, please
notify the sender immediately and delete the original message and any files transmitted. The unauthorized use of this e-
mail or any files transmitted with it is prohibited and disclaimed by ARCADIS U.S., Inc. and its affiliates. Nothing herein is
intended to constitute the offering or performance of services where otherwise restricted by law.
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary (T)
Temporary -
W1 ? P ®T excavation for ? Yes ® Corps 0.03
pipeline ® No ? DWQ
installation
W2 ? P ? T ? Yes ® Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0.03
2h. Comments: Wetlands being impacted are located within an existing sewer easement and extend into a wooded area. The
proposed impacts to these wetlands are limited to the existing easement, which is dominated by herbaceous and/or vine
species.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
Temporary -
S1 ? P ®T excavation for
pipeline UT to New River ? PER
® INT ® Corps
? DWQ 10 105
installation
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 105
3i. Comments: An unnamed tributary to the New River will be crossed for the installation of two pipes. All work will occur
within a 40' easement/right of way.
Page 6 of 12
PCN Form -Version 1.3 December 10, 2008 Version