Loading...
HomeMy WebLinkAbout20100765 Ver 1_More Info Requested_20101223Strickland, Bev From: Steenhuis, Joanne Sent: Thursday, December 23, 2010 10:49 AM To: Strickland, Bev Subject: FW: ONWASA Attachments: 6 of 12 ONWASA PCN.pdf DWQ # 10 0765 From: Vinay, Robert [maiIto: Robert.Vinay(aarcadis-us.coml Sent: Thursday, December 23, 2010 10:33 AM To: Steenhuis, Joanne Subject: ONWASA Joanne, PCN revised Page 6 of 12 attached. Robert Robert N. Vinay, PE I Project Manager I robert.vinay@arcadis-us.com ARCADIS U.S., Inc. 1 801 Corporate Center Drive, Suite 300 1 Raleigh, North Carolina 27607 T. 919.854.1282 1 M. 919.906.8509 1 F. 919.854.5448 www.arcadis-us.com ARCADIS, Imagine the result xintina this email. NOTICE: This e-mail and any files transmitted with it are the property of ARCADIS U.S., Inc. and its affiliates. All rights, including without limitation copyright, are reserved. The proprietary information contained in this e-mail message, and any files transmitted with it, is intended for the use of the recipient(s) named above. If the reader of this e-mail is not the intended recipient, you are hereby notified that you have received this e-mail in error and that any review, distribution or copying of this e-mail or any files transmitted with it is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately and delete the original message and any files transmitted. The unauthorized use of this e- mail or any files transmitted with it is prohibited and disclaimed by ARCADIS U.S., Inc. and its affiliates. Nothing herein is intended to constitute the offering or performance of services where otherwise restricted by law. 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary (T) Temporary - W1 ? P ®T excavation for ? Yes ® Corps 0.03 pipeline ® No ? DWQ installation W2 ? P ? T ? Yes ® Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.03 2h. Comments: Wetlands being impacted are located within an existing sewer easement and extend into a wooded area. The proposed impacts to these wetlands are limited to the existing easement, which is dominated by herbaceous and/or vine species. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Temporary - S1 ? P ®T excavation for pipeline UT to New River ? PER ® INT ® Corps ? DWQ 10 105 installation S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 105 3i. Comments: An unnamed tributary to the New River will be crossed for the installation of two pipes. All work will occur within a 40' easement/right of way. Page 6 of 12 PCN Form -Version 1.3 December 10, 2008 Version