HomeMy WebLinkAbout20090385 Ver 2_Information Letter_20100511
A
???
NCD NR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Mr. J. J. Swain, Jr., P.E.
Division 13 Engineer
NiC. Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
Division of Water Quality
Coleen H. Sullins
Director
May 11, 2010
Subject: Inspection-NC Highway 226
DWQ. Project 09-0385
TIP No. B-4191
McDowell County
091
Dee Freeman
Secretary
Dear Mr. Swain:
I
On April 28, 2010 l inspected the construction work on the NC Highway 226 Jacktown Creek project in
McDowell County. Construction is underway on the highway detour.
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters. Also, please refer to the attached inspection report for
any specific items noted during the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
,
Attachment
cc: Brian C. Skeens, PE
Roger Bryan, Division 13, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
NC Highway 226 B-4191 Inspection Letter Apri12010
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
i 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211
Phone: 828-296-45001 FAX: 828-299-7043
Customer Service: 1-877-623-6748
Internet: www.ncwateraualitv.oro
An Equal Opportunity l A(firmatve Action Employer
NorthCarolina
;VatllCRlly
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: April 28, 2010
County: Buncombe Region: Asheville
DOT Division: Division 13
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ,Follow Up Evaluation ? Other
DWQ 401 4: 09-0385 NW Permit #: IP #:
Project Name:
Location of Project:
TIP No. B-4191
NC 226 south of I-40 in McDowell County
Project Complete: ?Yes X No
Activities (DOT):
? Bridge
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
? Bank Stabilization
? Other Fill
If no, estimated date of completion:
Steam Standards Violation
] Turbidity
Evidence of spills
Oil/Petroleum
U Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes ? no Estimated Acres
? Zone 1 Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba
Zone l: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited
i .*
Name of Waterway(s):
Basin/ Subbasin:
DW_ Q Site Visits for DOT Projects
Background Info
]acktown Creek
CTB 030830
Wetland Type: ?Isolated ?Non-Isolated (Waters of US)
Stream Class: ?Class B ?303d Listed ?WS-11 ?WS-V ?SB
X?Class C ?ORW ?Trout ?WS-I1I ?NSW
?HQW ?WS-I ?WS-N ?SA ?CA
Type of Authorized Impact
Authorized Wetland Impacts:
Authorized Stream Impacts
X?Culvert ?Bottomless Culvert
?Bridge ?Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X?Fill '
?0 - I/ i 0`h acre
0113`d to 1.0 acre
?< 150 linear feet
X?1/1 It" to 1/3`d acre
?> 1.0 acre
X?> 150 linear feet
Work is underway at the bridge construction site with the temporary detour being installed just downstream of
the bridge. Grading work for the temporary detour is almost complete and base stone has been placed on the
temporary roadway. Some sediment and erosion control structures installed but area needs seeding and
mulching.
Continue to maintain erosion control devices and continue with seeding and mulching as required.
NC 226 ZIP B-4191 Apri120 10 Inspection Report