Loading...
HomeMy WebLinkAbout20090385 Ver 2_Information Letter_20100511 A ??? NCD NR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. J. J. Swain, Jr., P.E. Division 13 Engineer NiC. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Division of Water Quality Coleen H. Sullins Director May 11, 2010 Subject: Inspection-NC Highway 226 DWQ. Project 09-0385 TIP No. B-4191 McDowell County 091 Dee Freeman Secretary Dear Mr. Swain: I On April 28, 2010 l inspected the construction work on the NC Highway 226 Jacktown Creek project in McDowell County. Construction is underway on the highway detour. Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters. Also, please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist , Attachment cc: Brian C. Skeens, PE Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office NC Highway 226 B-4191 Inspection Letter Apri12010 SURFACE WATER PROTECTION SECTION -Asheville Regional Office i 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX: 828-299-7043 Customer Service: 1-877-623-6748 Internet: www.ncwateraualitv.oro An Equal Opportunity l A(firmatve Action Employer NorthCarolina ;VatllCRlly DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: April 28, 2010 County: Buncombe Region: Asheville DOT Division: Division 13 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ,Follow Up Evaluation ? Other DWQ 401 4: 09-0385 NW Permit #: IP #: Project Name: Location of Project: TIP No. B-4191 NC 226 south of I-40 in McDowell County Project Complete: ?Yes X No Activities (DOT): ? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other Fill If no, estimated date of completion: Steam Standards Violation ] Turbidity Evidence of spills Oil/Petroleum U Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes ? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone l: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited i .* Name of Waterway(s): Basin/ Subbasin: DW_ Q Site Visits for DOT Projects Background Info ]acktown Creek CTB 030830 Wetland Type: ?Isolated ?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-11 ?WS-V ?SB X?Class C ?ORW ?Trout ?WS-I1I ?NSW ?HQW ?WS-I ?WS-N ?SA ?CA Type of Authorized Impact Authorized Wetland Impacts: Authorized Stream Impacts X?Culvert ?Bottomless Culvert ?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fill ' ?0 - I/ i 0`h acre 0113`d to 1.0 acre ?< 150 linear feet X?1/1 It" to 1/3`d acre ?> 1.0 acre X?> 150 linear feet Work is underway at the bridge construction site with the temporary detour being installed just downstream of the bridge. Grading work for the temporary detour is almost complete and base stone has been placed on the temporary roadway. Some sediment and erosion control structures installed but area needs seeding and mulching. Continue to maintain erosion control devices and continue with seeding and mulching as required. NC 226 ZIP B-4191 Apri120 10 Inspection Report