HomeMy WebLinkAboutNCC192172_Annual Fee NOD Letter_20210108ROY COOPER
cm
MICHAEL S. REGAIN
Serrilary
BRIAN WRENN
opme G1'
F-L Legacy, LLC
Attn: Jesse Baker
500 Boylston Street, Suite 2010
Boston, MA 02116
d. .
NORTH CAROLINA
EnOr inerdal Quality
Subject: Notice of Deficiency- Failure to Pay Annual Fee
Invoice No. NCC192172-2020
Dear Permittee:
You are receiving a Notice of Deficiency for failure to pay the annual permit fee per the requirements of N.C. General Statute
143-215.3D(a)(4). You are receiving this notice because the annual fee of $100.00 for coverage under NPDES General
Stormwater Permit NCGO10000 for Construction Activities has not been paid. The annual fee was billed on 11/24/2020 and was
due on 12/24/2020.
The annual permit fee applies to the following construction site:
The Legacy - Phase 3
Covered Bridge Trail, New Hope, NC
Chatham County
Certificate of Coverage No. NCC192172
If the project was closed out prior to the invoice date, you must submit a Notice of Termination on-line, and DEQ will determine if
waiving the fee is appropriate. Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice
of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. Should you
have any questions or concerns, please contact Aziza Selkane at (919) 707-3710 or me at (919) 707-3639. Thank you for your
attention to this matter.
Sincerely,
Annette Lucas
Stormwater Program Supervisor
Division of Energy, Mineral, and Land Resources
NC Reference No. NCG01-2019-2172
Nun Carolina Qeparl menergy t of EnAmnmenral Qpalliy I BIvlslnn of En, Mnera ll and Land Resources
Sit Nanh SalleburyStreet 1 1612Mall ServkeUnter I Ralelgh Nanh Carolina 27699-1612
914-707-9290