Loading...
HomeMy WebLinkAboutWQ0042158_Application (FTSE)_20201222Permit Number WQ0042158 Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer dean.hunkele Coastal SWRuIe Permitted Flow Facility Name The Reserve at Blake Farms Apartments Location Address Owner Owner Name Pluris Hampstead LLC Dates/Events Scheduled Orig Issue App Received Draft Initiated issuance 12/7/2020 © ColeJenest & Stone Shaping the Environment Realizing the Possibilities Land Planning Landscape Architecture Civil Engineering Urban Design 1311/2 South Wilmington Street, Suite 200 1 Raleigh, INC 27601 +Charlotte P+919 719 1800 f+919 7191819 url+ www.colejeneststone.com +Raleigh RECEIVED DEC 0 7 2020 Ttq i ML Date: December 4, 2020 Reference: 50516 — The Reserve at Blake Farm — Fender County Fast Track Sewer System Extension Application Attention: Dean Hunkele Company: NC Department of Environmental Quality Tel: 910-796-7380 Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 We Are Transmitting: Transmitted Via: ® Herewith ❑ Under Separate Cover Copies Dated Description 1 11/04/20 Fast Track Sewer System Extension Application 1 11/03/20 Flow Tracking for Sewer Extension Applications 1 - USGS Map — Site Map 1 12/04/20 11x17 Plan Set 1 Digital PDF CD's 12/01/20 1 Check - $480 (check # 22577) ❑ Mail ® Overnight ❑ Courier ❑ Hand Delivery ❑ Pick -Up ❑ For Approval ❑ For Your Use ❑ As Requested ® For Review Remarks: Please find the attached forms and documents for your review. If you have any questions or need additional information, please contact us at your convenience. Thank you. By: P.'SDSKPR0JW516t00 - Submttals120 -Agency=M1203 -Water and Sewer Permits to state%DNR Sewer,1204 11unkele, D _DNR Sewsr.doc State of North Carolina nWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number. W( O)O) ga-15 o (to be completed by DwR) All items must be completed or the application will be returned 1. APPLICANT INFORMATION: I. Applicant's name: Pluris Hampstead. LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ❑ Municipal 3. Signature authority's name: Randy Hoffer per 15A NCAC 02T .0106(b) Title: Regional Manager 4. Applicant's mailing address: 1095 Hwy 210 City: Sneads Ferry State: NC Zip: 28460 5. Applicant's contact information: Phone number: 910) 327-2880 Email Address: rhoffer@plurisusa.coin ❑ Privately -Owned Public Utility ❑ Other 11. PROJECT INFORMATION: AA 1. Project name: THE RESERVE AT BLAKE FARM tt. 2. Application/Project status: ® Proposed (New Permit) ❑ Existing PerntiUProject If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: PENDER COUNTY 4. Approximate Coordinates (Decimal Degrees): Latitude: 34.327074' Longitude:-77.763324' 5. Parcel ID (if applicable): 3271-32-4553-0000 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: I. Professional Engineer: Lewis E. Hardee.Ill PE License Number: 035679 Firm: Cole Jenest & Stone Mailing address: 131 1/2 S. Wilmington St. Ste 200 City: Raleigh State: NC Zip: 27601- Phone number: �) 645-5964 Email Address: Ihardee@colejeneststone.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Pluris Hampstead W WTP Permit Number: W00037287 Owner Name: Pluris Hampstead, LCC V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ0041671 Downstream (Receiving) Sewer Size: - System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): Pluris Hampstead. LLC FORM: FTA 04-16 Page I of V1. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? N Yes ❑No ❑N/A 2. If the Applicant is a Developer of Tots to be sold, has a Developer's Operational Agreement (FORM: DEVI been attached? ❑ Yes ❑No NN/A 3. If the Applicant is a Home/Property Owners' Association. has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No NN/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash N Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100%Domestic/Commercial %Commercial 0 % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T.0114(f)? ❑ Yes N No If yes, provide a cony of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(fl) Daily Design Flow '•b No. of Units Flow Muilti-Family I BDRM 240 gal/unit 100 24,000 GPD Muilti-Family 2 BDRM 240 gal/unit 124 29,760 GPD Muilti-Family 3 BDRM 360 gal/unit 16 5,760 GPD gal/ GPD gal/ GPD gal/ GPD Total 59,520 GPD a See 15A NCAC 02T .0114(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T.0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: _ GPD (per 15A NCAC 02T .0114) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Sewers): I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1841 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T.0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design now of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the putnp(s): _gal lons per minute at feet total dynamic head (fDl-I) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timefrantes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 or IX. SETBACKS & SEPARATIONS — (0213 .0200 & 15A NCAC 02T .0305(Q): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ® Yes ❑ No ➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, FIQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet l:inal earth rade vertical 36 inches ➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(t) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpase ➢ If noncompliance with 02T.0305(n or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ®Yes [-]No ❑ N/A D Sec the Division's draft separation requirements for situations where separation cannot be meet D No variance is required if alternative design criteria specified is utilized in design and construction D As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? D Information can be obtained front the 401 & Buffer Pennitthip Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer' means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six-nnorlhs and inspections documented per 15A NCAC 02T.0403(a)(5) at, the permitee's individual System -Wide Collection permit. 17ORM: PTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with ISA NCAC 02T, the Minimum Design Criteria for the Permitting of Punnp Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, Lewis E. Hardee III, PE PLS attest that this application for (Professional Engineer's name from Application Item 111.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and havejudged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143.215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Walcr Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to nie as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000 as well as civil penalties up to $25,000 per violation. Signature: Dale: ///Z/ a07 p FORM: FTA 04-16 Page 5 of 5 State of North Carolina Department of Environmental Quality 1 " Division of Water Resources Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Pluris Hampstead LLC Project Name for which flow is being requested: The Reserve At Blake Farm More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for ail pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Pluris, Hampstead b. WWTP Facility Permit #: WQ0037287 All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used ,IM1; 0.045 0.100 0.059520 0.204520 81% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** BF 0.78480 0.313920 0 0.070 0.070 0.243920 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is <0. Downstream Facility Name (Sewer): Pluris Hampstead LLC Downstream Permit Number: W@0 Page 1 of 6 FTSE 10-18 111. Certification Statement: I Randy Hoffer, Regional Manager certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the (low from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pomp station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing 1113 Page 2 of 6 PTSG 10-18 ZUSGSVS.DFfRTMEH00FTXEIWERpR SCOTS HILL WADMNGLE .,.�.....,.�, L :i USTopo 17 t>_ APPROXIMATE PROJECT LOCATION �H,\\f� '.L��i9�sD, ennuwron � �' F MI ... :.w e�� ........m .emam..:.,..�... K W W� if, 12/9/2020 34°19'37.5"N 77°45'48.0"W - Google Maps Go-,gle MapS 34°19'37.5"N 77°45'48.0"W �Y Figure Eight V'ropenies ry Wesleyan Chapel United Methodist Church 10 i The Cottage Markel pups may & Stay Boarding, Daycare it, PoGao„rogle Hcme gocGe store rsH/ r �Hy 5' �r r"'arrr. �H •'a�F!lllog FN Map data @2020 200 ft https://www.google.com/maps/place/34"19'37.5"N+77°45'48.0"W/@34.324586,-77.7642258,17z/data=!4m5!3m4! 1 sOxO:Ox0!8m2!3d34.32707414d-77.763324?hl=en 112