HomeMy WebLinkAbout520065_Plan of Action_20201222PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 52
65
County: Jones
Facility Name: Sherrall Houston Farm
Certified Operator Name: Sherall B. Houston
Operator Number: 20094
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): primary
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
no
18
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30-day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 12/23/2020
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Sherall B. Houston
acility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone: 252-298-2132
Date: 12/22/2020
PoA Cover Page 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
primary
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
2400
certified herd #
18.0
19.5
inches
inches
1.5 inches
71442
ft2
66798 gallons
180
81760.4
2448
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
days
ft3
80157 ft3
0
43575
ft3
ft3
154253 gallons
I. current waste analysis dated 8/3/2020 0.82 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
181.3 Ibs. PAN
PoA (30 Day) 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
primary
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
line m = 181.3 Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
181.3 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-t.
2 PAN balance
(Ib/acre)
TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
u. application window'
T58
1
WINTER OVERSEED
6.37
58.00
369.5
Oct. 1 Mar. 31
T58
2
WINTER OVERSEED
5.90
60.00
354.0
Oct. 1 Mar. 31
T58
3
WINTER OVERSEED
3.73
68.20
254.4
Oct. 1 Mar. 31
T58
1
COASTAL BERMUDA
6.37
Mar. 1 - Sept. 30
T58
2
COASTAL BERMUDA
5.90
Mar. 1 - Sept. 30
T58
3
COASTAL BERMUDA
3.73
Mar. 1 - Sept. 30
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
PoA (30 Day) 2/21/00
v. Total PAN available for all fields (sum of column t) = 977.8 Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crop's remaining PAN balance (line v from section III) =
y. Overall PAN balance (w - x) =
181.3 lb. PAN
977.8 Ib. PAN
-797 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
This 30 day Plan of Action is based on the lagoon level, current waste analysis, and irrigation information
provided by Ann Houston. Continued rainfall has caused lagoon level to rise above the start pump mark. If
weather condition permit the operation is planning to irrigate by 12/23/2020 to lower lagoon level. The waste
analysis used to prepare this POA is dated 8/3/2020. Operation will continue Irrigation as weather and field
conditions permit. On pull one, 14 lbs/ac have been irrigated in December. On pull two, 8 Ibs/ac have been
irrigated in December. On pull 3, 0 Ibs/ac have been irrigated to the date of this POA. Amanda Hatcher with
Duplin SWCD created an amendment to allow winter overseed to be converted from 50 Ibs/ac PAN rate to 100
Ibs/ac rate. PAN applied during December and January is limited to 25 Ibs of N/ac.
The operation has an adequate PAN deficit at this time to lower the lagoon to the temporary storage elevations.
This 30 day Plan of Action prepared by Kyle Smith, with the Jones Co. SWCD, on 12/22/2020.
PoA (30 Day) 2/21/00