HomeMy WebLinkAbout20101043 Ver 1_More Info Letter_20101220r
ICDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
December 20, 2010
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Todd Whittington, President
Lincolnton Hospitality, LLC
105 Rutledge Road
Greenwood, South Carolina 29649
Subject Property: Hampton Inn Hotel
DWQ #: 10-1043
Lincoln County
Request for Information: POST-CONSTRUCTIONSTORMWATER MANAGEMENT PLAN
Dear Mr. Whittington:
On December 13, 2010, the Division of Water Quality (DWQ) received a set of approved
Erosion and Sediment Control (E&SC) Plans and design calculations from Mr. Mitchell Baker,
Sr. of MLB Engineering for review and approval as a post-construction Stormwater Management
Plan (SMP) for your project. Please note that E&SC plan is different from post-construction
SMP, and that the approved E&SC does not authorize you to place any fill in or otherwise
impact a stream or wetland. Even though your impacts are under the threshold for a 401 Water
Quality Certification, a SMP permit or approval is required before any impact could occur.
Please be advised that, as of today, Lincoln County is not delegated by DWQ to review
and approve SMPs. As a result, submit a complete SMP to DWQ for review within 15 days of
the date of this letter since this would be permitted after-the-fact. Failure to comply with this
SMP requirement will result in a recommendation to the Director of DWQ for notice of violation
and subsequent enforcement action.
You have the option of using the Express Review Program to expedite your permit
application. All information about what you need to include in the submittal package and the
Express Review process and fees can be found at httv://vortal.ncdenr.org/web/wq/swp/ws/401.
Your selected stormwater best management practices (BMPs) shall treat the entire site
and, at a minimum, achieve 85% TSS removal efficiency. The SMP shall include design
calculations, full size plans and all supporting documents and items listed in the Required Items
Checklist including the applicable BMP Supplement Form(s) and Operation and Maintenance
Agreements available at httv://I)ortal.ncdenr.orgLweb/wq/ws/su/bmp-manual.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 512 N. Salisbury St., Raleigh, North Carolina 27604 (91h Floor)
Phone: 919-807-63011 FAX: 919-807-6494
Internet: http:l/portal.ncdenr.org/web/wq/swp/ws1401
No"rthCarolina
Naturally
An Equal Opportunity 1 Affirmative Action Employer
Hampton Inn Hotel-SMP
Lincoln
Page 2 of 2
December 20, 2010
If you have any questions regarding this matter, please contact me or Joseph Gyamfi at
919-807-6301.
Sinc ly,
Ian McMillan, Acting Supervisor
401 Oversight/Express Review Program
UM/j9
cc: File copy
Alan Johnson, MRO
Mitchell L. Baker, Sr., 408 South Almond Drive, Simpsonville, SC 29681