HomeMy WebLinkAboutNCC200305_NOT Closeout Documents_20210106North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Wayne Project: Lane II Solar, LLC
Person financially responsible: Home Brothers Construction, Jackson Horne
Address: 1682 Middle River Loop, Fayetteville, NC 28312
1. Project Location: 785 Old Smithfield Road, Goldsboro
Pictures: No
2. Weather and soil conditions: sunny, warm, dry
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? No
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
River basin: Neuse
Project #: WAYNE-2019-019
Initial inspection: No
If no, check violations below:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one Title:
Inspection report: Sent Report Date given/sent: June 10, 2020
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self-
10. Comments: monitoring or self -inspection are required. Project is released and coverage under NPDES
General Stormwater Permit for Construction Activities is terminated.
Reported by: Bradley West Others present:
Date of inspection: June 09, 2020 Time arriving on site: 11:45 AM Time leaving site: 12:15 PM
cc: