Loading...
HomeMy WebLinkAboutNCC200038_NOT Closeout Documents_20210106North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Forsyth Project: MACHINE STREET PUMP STATION River basin: Yadkin-PeeDee Person financially responsible: City of Winston-Salem -Alan Temple Project #: FORSY-2017-012 Address: PO Box 2511, Winston-Salem, NC 27102 1. Project Location: Machine Street, Winston-Salem Pictures: Yes - Digital 2. Weather and soil conditions: Cloudy, Wet Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Ryan C. Newcomb Inspection report: Sent Report 9. Corrective action needed: Title: Engineering Field Manager Date given/sent: January 06, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. Reported by: Tyler Pearson Others present: Date of inspection: January 05, 2021 Time arriving on site: 9:15 AM Time leaving site: 9:45 AM cc: