HomeMy WebLinkAbout040030_30 Day POA_20210104PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 4-30 County: Anson
Facility Name: Fox Ridge
AWA
Certified Operator Name: Eric Ferrell Operator Number: 17634
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/113: FIR NIFin FIR Sow
Spillway(Y or N): N Y
Level(inches): 14 19
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section 111 tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
"if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 3/8/2010
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the hest of my knowledge and ability, the information is
accurate and correct,
Murphy Brown, LLC
Facility Owner/Manager (print)
Facility OwnerlManager (signature)
Phone: 910-293--3434
Date: 1/412021
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 Y
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Fox Ridge Nur/Fin
line m =
2.
Structure ID: Fox Ridge Sow
line m = 1203.9
3.
Structure ID:
line m =
4.
Structure ID:
line m =
5.
Structure ID:
line m =
6.
Structure ID:
line m =
n.lines 1+2+3+4+5+6= 1203.9
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAM
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
FR Tract
H01
Fescue Hay
4.82
162.59
783.7
FR Tract
H02
Fescue Hay
3.58
163.40
585.0
FR Tract
H05
Fescue Hay
6.19
162.77
1007.5
'State current crop ending application date or next crop application beginning date for availablf
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2376.2
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line In from section Il) = 1203.9
PoA (30 Day) 2121/00
x. Crop's remaining PAN balance (line v from section III) = 2376.2
y. Overall PAN balance (w - x) _ -1172
Line y must show as a deficit. If line y does not show as a deficit, list course of action here incl
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalcul�
on new information. If new fields are to be included as an option for lowering lagoon level, add
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
facility, provide information regarding the herd population and lagoon freeboard levels at the re
PoA (30 Day) 2121100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I Fox Ridge Sow
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 19.0
b. designed 25 yr./24 hr. storm & structural freeboard 19.8
c. line b - line a (inches in red zone) = 0.8
d. top of dike surface area according to design
(area at below structural freeboard elevation) 246445
e. line c/12 x line d x 7.48 gallons/W 122894
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 1 180
g. volume of waste produced according to structural design 1 380670
h. current herd # 3600 certified herd #1 3600
actual waste produced = current herd # x line g = 380670
certified herd #
i. volume of wash water according to structural design 0
j. excess rainfall over evaporation according to design 143760
k. (lines h + i + j) x 7.48 x 30 days/line f= 653789
4. Total PAN to be land applied during draw down period
1. current waste analysis dated 1 12/16/2 1 1.55
m. ((lines e + k)/1000) x line I = 1203.9
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121/00