HomeMy WebLinkAbout430007_30 Day POA_20210104PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 43-7 County Harnett Facility Name: S6 - Buffalo Ridge Certified Operator Name: Brian McGugan Operator Number 986752 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways, Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 S-6 BR N N 19 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation "if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy Brown, LLC Phone: Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) 910-293-3434 1/4/2021 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: S-6 Lagoon line m = 432.9 lb PAN 2. Structure ID: BR line m = 1242.4 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 1675.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres S. remaining IRR- 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' Zone A Small Grain 2.06 49.31 101.6 Sept -April Zone J Small Grain 1.60 49.08 78.5 Sept -April Zone K Small Grain 2.00 45.73 91.5 Sept -April Zone C Small Grain 3.66 46.41 169.9 Sept -April Zone B Small Grain 2.94 45.57 134.0 Sept -April P7 Small Grain 4.77 47.83 228.1 Sept -April P8 Small Grain 5.23 47.93 250.7 Sept -April P9 Small Grain 4.64 42.46 197.0 Sept -April P10 Small Grain 4.62 47.73 220.5 Sept -April P11 Small Grain 4.73 47.56 225.0 Sept -April 'state current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1696.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1675.3 Ib. PAN PoA (30 Day) 2/21100 x. Crop's remaining PAN balance (line v from section ill) = 1696.7 lb. PAN y. Overall PAN balance (w - x) _ -21 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add those fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2121l00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): S-6 Lagoon 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallonslft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 19.0 inches 19.9 inches 0.9 inches 189000 ft2 108385 gallons 180 days g. volume of waste produced according to structural design 1 253780 ft3 h. current herd # 2400 certified herd # 2400 actual waste produced = current herd # x line g = 253780 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 12/16/2020 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown bellow) PoA (30 Day) 2/21100 fts 11025 ft3 453824 gallons 0.77 lbs11000 gal. 432.9 lbs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID). JBR 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallonslft3 3. Projected volume of waste liquid produced during draw down period 18.0 inches 19.9 inches 1.9 inches 185600 ff 222126 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1 261106 ft3 h. current herd # 7920 certified herd # 7920 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period f. current waste analysis dated 1 12/16/2020 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 261106 ft3 ®ft3 108267 ft3 460485 gallons 1.82 Ibs11000 gal_ 1242.4 lbs. PAN PoA (30 Day) 2/21 /00