HomeMy WebLinkAbout090181_30 Day POA_20210105PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 9-181
Facility Name: Farm 3092
County: Bladen
Certified Operator Name: Johnny Cain Jr Operator Number: 987304
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways,
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
30923
N
18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges_
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWO prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy Brown, LLC Phone:
Facility Owner/Manager (print)
Date:
Facility Owner/Manager (signature)
910-293-3434
1 {5I2021
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 3092
line m =
1481.8 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1481.8lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o_ tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lblacre)
t, TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
30923
3
Small Grain
2.87
7.18
20.6
Sept -April
30923
4
Small Grain
2.73
2.47
6.7
Sept -April
30923
5
Small Grain
1,99
7.79
15.5
Sept -April
30923
6
Small Grain
1,45
1.91
2.8
Sept -April
30923
7
Small Grain
5.31
4.44
23.6
Sept -April
30923
8
Small Grain
5.27
7.80
41.1
Sept -April
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 110.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1481.8 Ib. PAN
PoA (30 Day) 2121 /00
x. Crop's remaining PAN balance (line v from section Ill) = 110.3 lb. PAN
y. Overall PAN balance (w - x) = 1371.5 lb. PAN
Line y must show as a deficit. if line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information_ If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. if animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility_
Irrigation onto existing spray fields will continue as weather and field conditions permit. Will haul water to Cain
Sow Farm
PoA (30 Day) 2121i00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 3092
2. Current liquid volume in 25 yr_/24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.7 inches
c. line b - line a (inches in red zone) = 1.7 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 228103 ft�
e. line c/12 x line d x 7.48 gallonse 238869 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 263743 ft3
h. current herd # 8000 certified herd #1 8000
actual waste produced = current herd # x line g
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I_ current waste analysis dated 1 12/16/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
263743 ft'
I ft3
1-330600 ] ft3
494681 gallons
2.02 lbs/1000 gal.
1481.8 Ibs_ PAN
PoA (30 Day) 2/21 /00