HomeMy WebLinkAbout820466_30 Day POA_20210104PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
Facility Name
AWS820466
Farm 2037 & 2038
County: Sampson
Certified Operator Name: Stephen Wadsworth Operator Number: 989945
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spiliway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
20373 20383A 20383E
N N N
20 20
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: As conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my Knowledge and ability, the information is
accurate and correct.
Murphy -Brown, LLC 1 Michael Norris Phone;
Facility Owner/Manager (print)
910-293-3434
�\ \ � 'O r-r • -- Date: 1 /5/2021
Facility Owner/Manager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 20373
line m =
1295.5 lb PAN
2.
Structure ID: 20383A
line m =
577.1 lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
ib PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1872.5 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lblacre)
t, TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u, application window'
T7258
6A
Small Grain
3.59
28.86
103.6
Sept -April
T7258
613
Small Grain
3.73
28.86
107.6
Sept -April
T7258
6C
Small Grain
4.59
28.W
132.5
Sept -April
6D
Small Grain
5.93
28.86
171.1
Sept -April
6E
Small Grain
5.26
16,78
88.3
Sept -April
6F
Small Grain
5.53
16.78
92.8
Sept -April
7A
Small Grain
4.65
23.98
111.5
Sept April
7E3
Small Grain
4.03
23.98
96.6
Sept -April
7C
Small Grain
3.43
23.98
82.3
Sept -April
8A
Small Grain
4.85
30.64
148.6
Sept -April
9A
Small Grain
3.98
30.64
121.9
Sept -April
10A
Small Grain
1.48
50.00
74.0
Sept -April
11D
Small Grain
3,58
45.47
162.8
Sept -April
11 E
Small Grain
3.77
45.47
171.4
Sept -April
12B
Small Grain
4.17
44.24
184.5
Sept -April
14A
Small Grain
4.18
39.77
166.2
Sept -April
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2015.8 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section ll) = 1872.5 lb. PAN
PoA (30 Day) 2/21100
x. Crop's remaining PAN balance (line v from section 111) = 2015.8 lb. PAN
y. Overall PAN balance (w - x) = -143 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance_ If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2/21100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 120373
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 20.0 inches
b. designed 25 yr./24 hr_ storm & structural freeboard 20.0 inches
c. line b - line a (inches in red zone) = 0.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 1 202288 Jft2
e. line c/12 x line d x 7.48 gallons/W 5044 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 346031 ft3
h. current herd # 10496 certified herd # 10496
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
1. current waste analysis dated J 12/3/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
346031 ft'
® ft3
1180011 ft3
578493 gallons
2.22 ibs/1000 gal.
1295.5 lbs. PAN
PoA (30 Day) 2121 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/ldentifier (ID): 20383A
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr.124 hr. storm & structural freeboard
c. line b - line a (nches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line cf12 x line d x 7.48 gallons/W
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
20.0 inches
20.4 inches
0.4 inches
1978241 ft2
49324 gallons
180 days
g. volume of waste produced according to structural design fts
h. current herd # 10496 certified herd # 10496
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
1. current waste analysis dated 1 1213f2020
m. ((lines e + k)I1000) x line 1 =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
W
�W
197824 ft3
246621 gallons
1.95 Ibs11000 gal.
577.1 lbs. PAN
PoA (30 Day) 2/21100