HomeMy WebLinkAbout090088_30 Day POA_20210104PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 9-88
County:
Bladen
Facility Name: Farm #15, 16, and 23
Certified Operator Name: Johnny Cain Jr. Operator Number:
987304
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches):
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Farm 15 Farm 16 Farm 23
N
29 19 19
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Flans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP_
Operation will be partially or fully depopulated.
Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy Brown LLC Phone: 910-293-3434
Facility Owner/Manager (print)
C I -I L C Date:
Facility Owner/Manager (signature)
1 /412021
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Farm 15
line m =
lb PAN
2.
Structure ID: Farm 16
line m =
417.7 lb PAN
3.
Structure ID: Farm 23
line m =
460.3 lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6,
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 878.1lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
20
Overseed
31.41
39.37
1236.6
Sept -April
21
Overseed
8.26
41.24
340.6
Sept -April
22
Overseed
8.49
41.24
350.1
Sept -April
23
Overseed
10.98
39.36
432.2
Sept -April
24
Overseed
11.30
39.36
444.8
Sept -April
25
Overseed
11.26
39.36
443.2
Sept -April
26
Overseed
11.26
39.36
443.2
Sept -April
27
Overseed
11.13
39.36
438.1
Sept -April
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
x. Crop's remaining PAN balance (line v from section III) = 4128.8 lb. PAN
y. Overall PAN balance (w - x) _ -3251 lb. PAN
Line y must show as a deficit. 1f line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based
on new information_ If new fields are to be included as an option for lowering lagoon level, add these fields to the
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is ava
for pumping if needed.
PoA (30 Day) 2/21100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): I Farm 16
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr.124 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d, top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c112 x line d x 7.48 gallonslft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd # 5600 certified herd # 5600
actual waste produced = current herd ## x line g =
ertified herd #
volume of wash water according to structural design
excess rainfall over evaporatio . according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 12/17/2020
m_ ((lines e + k)11000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
19.0 inches
192 inches
02 inches
34935 Ift2
5226 gallons
180 days
168000 ft3
168000 fta
® ft3
20379 ft3
234846 gallons
1.74 Ibs11000 gal.
417.7 lbs. PAN
PoA (50159402"0
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): F Farm 23
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 19.0 inches
b. designed 25 yr.124 hr. storm & structural freeboard 19.$ inches
c. line b - line a (inches in red zone) = 0.8 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 168100 ft2
e. line c112 x line d x 7.48 gallonslft3 83826 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design I 180 days
g. volume of waste produced according to structural design I 211483 ft3
h. current herd # 2000 certified herd #1 2000
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 12/17/2020
m. ((lines e + k)11000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
211483 ft3
Offs
98058 ft3
385894 gallons
0.98 Ibs11000 gal_
460.3 lbs. PAN
PoA (30 Day) 2/21/00