HomeMy WebLinkAbout090208_30 Day POA_20201229PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIf
Facility Number: 9-208
Facility Name: 2601-2
Certified Operator Name: Danny Tyner
County: Bladen
Operator Number: 28715
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
2601
2. Check all applicable items
i
19
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy Brown, LLC Phone: 910-293-3434
Facility Owner/Manager (print)
Date: 12/29/2020
Facility Owner/Manager (signature)
~ Y,
S
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 2601
line m =
1407.1 lb PAN
2. Structure ID:
line m -
lb PAN
3. Structure ID-
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 1407.1 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRIOn_ DO NOT LIST FIF_I_CS TO WHICH PAN CANNOT BE APPLIED DURING THIS an DAY PERIOD_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(Iblacre)
t TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
c, application window'
T2108
Sub 1A
Small Grain
1.48
50.00
74.0
March -Sept
T2108
Sub 1B-1F
Small Grain
2.95
50.00
147.5
March -Sept
T2108
Sub 2
Small Grain
0.871
50.00
43.5
March -Sept
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period_
v. Total PAN available for all fields (sum of column t) = 265.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 1407.1 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 265.0 lb_ PAN
y. Overall PAN balance (w - x) = 1142A lb_ PAN
ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN base
n new information. If new fields are to be included as an option for lowering lagoon level, add these fields to thl
'AN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitter
icility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is avaik
for pumping if needed. There is not enough PAN to balance POA. This farm will be hauling water to the Edge
Farm facility 9-31 _
PoA (30 Day) 2/21100
PoA (30 Day) 2121100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): 12601
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 19.0
b. designed 25 yr.124 hr. storm & structural freeboard 19.6
c. line b - line a (inches in red zone) = 0.6
d. top of dike surface area according to design
(area at below structural freeboard elevation) 75000
e. line c112 x line d x 7.48 gallons/ft" 26180
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180
g. volume of waste produced according to structural design 520045.3
h. current herd # 1 71041 certified herd # 7104
actual waste produced = current herd # x line g = 520045
certified herd #
i. volume of wash water according to structural design 01
j. excess rainfall over evaporation according to design 43750
k. (lines h + i + j) x 7.48 x 30 days/line f= 702865
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 12/16/20 1 1.93
m. ((lines e + k)11000) x line I = 1407.1
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121100