Loading...
HomeMy WebLinkAbout090208_30 Day POA_20201229PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIf Facility Number: 9-208 Facility Name: 2601-2 Certified Operator Name: Danny Tyner County: Bladen Operator Number: 28715 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 2601 2. Check all applicable items i 19 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy Brown, LLC Phone: 910-293-3434 Facility Owner/Manager (print) Date: 12/29/2020 Facility Owner/Manager (signature) ~ Y, S II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2601 line m = 1407.1 lb PAN 2. Structure ID: line m - lb PAN 3. Structure ID- line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 1407.1 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIOn_ DO NOT LIST FIF_I_CS TO WHICH PAN CANNOT BE APPLIED DURING THIS an DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Iblacre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s c, application window' T2108 Sub 1A Small Grain 1.48 50.00 74.0 March -Sept T2108 Sub 1B-1F Small Grain 2.95 50.00 147.5 March -Sept T2108 Sub 2 Small Grain 0.871 50.00 43.5 March -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period_ v. Total PAN available for all fields (sum of column t) = 265.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 1407.1 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 265.0 lb_ PAN y. Overall PAN balance (w - x) = 1142A lb_ PAN ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN base n new information. If new fields are to be included as an option for lowering lagoon level, add these fields to thl 'AN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitter icility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is avaik for pumping if needed. There is not enough PAN to balance POA. This farm will be hauling water to the Edge Farm facility 9-31 _ PoA (30 Day) 2/21100 PoA (30 Day) 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 12601 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 19.0 b. designed 25 yr.124 hr. storm & structural freeboard 19.6 c. line b - line a (inches in red zone) = 0.6 d. top of dike surface area according to design (area at below structural freeboard elevation) 75000 e. line c112 x line d x 7.48 gallons/ft" 26180 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 g. volume of waste produced according to structural design 520045.3 h. current herd # 1 71041 certified herd # 7104 actual waste produced = current herd # x line g = 520045 certified herd # i. volume of wash water according to structural design 01 j. excess rainfall over evaporation according to design 43750 k. (lines h + i + j) x 7.48 x 30 days/line f= 702865 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 12/16/20 1 1.93 m. ((lines e + k)11000) x line I = 1407.1 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121100