Loading...
HomeMy WebLinkAbout20201790 Ver 1_Shoreline Stabilization_20201231o� C-A State of North Carolina Department of Environment and Natural Resources Division of Water Resources N_ � Water Resources P. NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL. GUALITy FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Karen Higgins DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Karen Higgins DWR-401 & Buffer Permitting Branch 512 N. Salisbury Street RECEIVED Raleigh, NC 27604 DEC 31 2020 A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information NCDEQ/DWR/NPDES Name: DON CLAYTON Mailing Address: 623 UPPER SONDLEY DR ASHEVILLE NC 28805 Telephone Number: 828-777-7841 Fax Number: E-mail Address: 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: httq //www saw usace army mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: CARISSA PARKER Company Affiliation: BENNICK ENTERPRISES LLC. Mailing Address: 7836 HWY 70 EAST NEBO NC 28761 Telephone Number: 828-659-1000 Fax Number: 828-659-1001 E-mail Address: CARISSA BENNICKGRADING COM B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 "'D OV-\ CA 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: MCDOWELL Nearest Town: MARION Lake/ river/ ocean adjacent to property: JAMES Property size (acres): 1.8 Subdivision name or site address (include phase/lot number): BEAR POINTE 1 810 MARINA DR Directions to site - please include road names and numbers, landmarks, etc.: FROM MORGANTON TAKE HWY 126 / TO S MTN INSTITUTE RD / TO LAKE JAMES RD / TL ONTO MARINA DR TO PROPERTY AT THE END Latitude (in decimal degrees) 35.74760 Longitude (decimal degrees) 81.95889 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): VACANT WOODED LOT 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 70' SHORELINE STABILIZATION BY BARGE, HEIGHT WILL BE 5' 7. Will work be conducted from land? ❑ From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 2' X 70' = 140 SQ FT Temporary impacts in square feet: NO TEMP IMPACT 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 3'X 70'= 210SQFT Temporary impacts (temporary clearing, construction corridor) in square feet: NO TEMP IMPACT 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 5 TREES LESS THAN 6" AND 3 TREES GREATER THAN 6" WILL BE REMOVED TO COMPLETE THIS PROJECT. THEY WILL BE REPLACED INCH FOR INCH WITH TREES TOTALING THE SAME DIAMETER. ANY REMAINING DISTURBED AREA WILL HAVE MULCH APPLIED TO IT FORM: SSGP 02-2017 Page 2 of 3 V 11. Sig u 0 gent's Sig ure' [15A CAC 0 H .0502 f ate `Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Plan View I FORM: SSGP 02-2017 Page 3 of 3 DON CLAYTON LAKE JAM ES 810 MARINA DR TO: NORTH CAROLINA DIVISION OF WATER RESOURCES I GIVE CARISSA PARKER, OF BENNICK ENTERPRISES, LLC., PERMISSION TO SIGN AS MY AGENT ON MY APPLICATION FOR SHORELINE STABILIZATION. DATE 2-0 Ar" U. hints and Db INNUPS aft..b. WNW. dr. r eon. arr.s...pr em.yaaa d tr ....m.$ by m rtmrd ....m a . ,ms,s adsofDFt—MINIM ootarr nee r..yw.a® m w dy r so—.t ' ew k . me atirl.d d a- .m.. r no satbw r n..* at r.00..0 Co.*. sale o..mr m tbw dy at m_ ra Boot r .e Pn . Lake Jame/ Dab ib.rp ewpa.tan Notes: a~ or a..d. ,. for b a onbdlrLtra more' of a poNa of aid eeme m cemalld bd !ml Aropypr{�yaY9i at PW M dar aawpr to Beet 6ra•- - Ero. & D�rarl�r dh to-fiar m pAI �f'9 at VW !& pdbtaae an hadao�o�o���tttaanttlMMoNaaaafjjjrtlddarma�- ®d Uw aeon La Fain mhubbd aSure i wmb Rhmardaut om led of ab prepe;I. & o dtaela an yyY�1trbW Wr eabar K sad Item ottnnM Hoed / d• dmrtua a aNmlabd pa at ,,.— • — a4mt lib Dmd. ,&- — - W taied. ,a . X . .I aa.etfesur and ddb.are are ,.oadd is Conmsdrbd Had FAVer ► M at wl� I A Db eau .aunt har bam pufasnt IZ Contour datum An 4 fiat and bar bent waled and loaned ham the .WNr n1 11 MWO tan rot bum b abd at Of tame j ,& Dnlmd=March B Mo to dhow au'. A. totthe �rlr- ou bar is, Area. ,a ReMo to are► dow tohi /} MR )to � s r6�bam� Mousbtma< Load s�a�l �per_ d M B. DnLed Notaber,a sple Co dhow Lard .blues m t.b want Labe James Date lump Napaaam i sled. L ndV. att 89 tW Madam s.m.. dk "M Hoek a..k "�La• aurae at ANVOW of Doowdlyd ,amw sabardra. t � 1 rmy e.at<er tr mY.Wa deem a..r r �� / / lB. ...- wba a b . edr► r d.ur. at r MR= a,..aV r a..m.. at a. am4 Wbr. 201t004818 I M LLCO WIFEE$Hao 10-17101801:2222 PM � q mn�..aanda j and W-a ... SK: PL 31 � Po• i i ro ad rat e.' 1v m son R. add �Re� Who a1m Aft. IQ � lak. rm. 44 �- - ��, ►, _ , 1 Total Area - @.= Acres p Subdivision Survey v ri• f � >>M � A� for . r tt Donald K. Clayton, Trustee �ed Recorded in Consolidated Re Property 752 at page 782 and r(r Plat Book 9 at page 14 (Owner —Black Bear Development Inc.) Nebo Township l,I rI McDowell County —North Carolina August 12, 2014 Revised March 9, 2015 ' Revised October 15, 2018 Revised October 16, 2018 This Plat Supersedes that Plat Recorded in Plat Book 30 at page 96 Low ramw q \ � � 8bb at lYadr OarOlmr Of Maear.n Iffi�Nw WN j;C pt.t a a MAN8m l.O1tl"a., m..t r rt.ay naoWm..a Aa no.dlq. _ 1`pp,w a&&v Z�tLt� .• wa Mountaineer Land Surveying, P.A. p'a r'"" 29 Summit Avenue—Spmoe Pine Horth Carolina 26777 (NO) M—W46 P t¢' 11ot-to-60e Scale Is 1 a=50' (1:M) a sN' ea' M. for ew Job No. 14-152RKV 2 Don Clayton 810 Marina Dr +CaooglB Maps DON CLAYTON - 810 MARINA DRIVE N Map data ©2020 500 ft N •�' State of North Carolina Department of Environment and Natural Resources Division of Water Resources I V. Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIROWIENT L. C.UAL Tv FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEX, etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: DON CLAYTON Mailing Address: 623 UPPER SONDLEY DR ASHEVILLE NC 28805 Telephone Number: 828-777-7841 Fax Number: E-mail Address: 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: htta://www.saw.usace.armv.mil/Portals/59/dots/regulatoryLregdocs/Permits/SAMPLE AGENT AUTHOR€Z ATION FORM.pdf) Name: CARISSA PARKER Company Affiliation: BENNICK ENTERPRISES LLC. Mailing Address: 7836 HWY 70 EAST NEBO NC 28761 Telephone Number: 828-659-1000 Fax Number: 828-659-1001 E-mail Address: CARISSA@BEN NICKGRADING.COM B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 'Dw\ Go-.aAbl�� 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: MCDOWELL Nearest Town: MARION Lake/ river/ ocean adjacent to property: JAMES Property size (acres): 1.8 Subdivision name or site address (include phase/lot number): BEAR POINTE 1 810 MARINA DR Directions to site - please include road names and numbers, landmarks, etc.: FROM MORGANTON TAKE HWY 126 / TO S MTN INSTITUTE RD / TO LAKE JAMES RD / TL ONTO MARINA DR TO PROPERTY AT THE END Latitude (in decimal degrees) 35.74760 Longitude (decimal degrees) 81.95889 S. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): VACANT WOODED LOT 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 70' SHORELINE STABILIZATION BY BARGE, HEIGHT WILL BE 5' 7. Will work be conducted from land? ❑ From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 2' X 70' = 140 SQ FT Temporary impacts in square feet: NO TEMP IMPACT 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 3'X 70'= 210SQFT Temporary impacts (temporary clearing, construction corridor) in square feet: NO TEMP IMPACT 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 5 TREES LESS THAN 6" AND 3 TREES GREATER THAN 6" WILL BE REMOVED TO COMPLETE THIS PROJECT. THEY WILL BE REPLACED INCH FOR INCH. WITH TREES TOTALING THE SAME DIAMETER. ANY REMAINING DISTURBED AREA WILL HAVE MULCH APPLIED TO IT FORM: SSGP 02-2017 Page 2 of 3 —D or\ Q-A D- U 11. Sig a Sgure` Date gent's }Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ Normal Water Level - `j" Derr �, �,�. Shoreline - 3'X ��' Plan View FORM: SSGP 02-2017 Page 3 of 3 DON CLAYTON LAKE JAMES 810 MARINA DR TO: NORTH CAROLINA DIVISION OF WATER RESOURCES I GIVE CARISSA PARKER, OF BENNICK ENTERPRISES, LLC., PERMISSION TO SIGN AS MY AGENT ON MY APPLICATION FOR SHORELINE STABILIZATION. �l DATE Laler'-q'), .Za Amide 11. Pfh•te and A mdunro rnr W .er.a.. deb a ebb adfiuS^ b .rrrrd by or dlow m . rheb 1, a MIN GROILG--AkWU L OOUM RAW fr nmlr.Oem m t" dy of Jo_ .t et - #'ab, d +4~W An no .®r. of W Avid. r left a bfaoo.a O.W. gas ft aft m W dYof to_ r !bolt of a! PW Notes: LSk in i a atdebgOi 4. tai:dde Itdma a— !ti— --� 1f.— • — u--- IA— • — It allIf" !A No tlW tit a Fe !r. 0mam - -- - _ .l,Mr of D.rdr •. `� "-Lit' Lake James Dub Mbnw Qorymmtbm i corded n fkwaedated l.al r sees. i y.nyw{r. d aat6aabr we sanded to Clio alldetrl Awl P► SWIF 70 at j i W been patma" �te d foot end hw bea wa1sA and lwabd ham the IMNh• hour not two !#Dated at as lists R AOt9 to aRmr Moral to lot 9 r U. =8 to allo►.8s•le to laeamwt aa& i hw taws Patbimed by Drat 'in s •0 tao. ^ Duet Dear , Late James Dab mr1D G•P••afka A b tbrrtr t arlu away Wt ob •... tar W' \�� \ hall D► rw el. . .._ r Wl� P.ba, was NZ { � � � ttetteoat. a eyy.•E.i a I{eaadlvd lmar 9ebdntdbo. 1 t.eW�y yak a..reu.�iai°0�a,,.o,m: \ // �� ld �� �, 1tMi l6rtrt Mw9 hells l LE Iw. r . ��....�_..-_"".-��_...,�, ab Ar rd�rtbbtlrbfia•��r O7 2018004818 LL�NbfEE pIDO �/ , � 10-17.201801:22:22PM PG* 14 w Total Area = 6.520 Aores Subdivision Survey I it t '/ i + `� for Donald K. Clayton, Trustee �,k ed Recorded -in Consolidated t Re, Property 752 at page 782 and Plat Book 9 at �a 14 (Owner —Black Development, Inc. Nebo Township McDowell County —North Carolina l jW. August 12, 2014 �� Revised ![arch 9, 2015 V/ f Revised October 15, 2018 Revised October 16, 2018 / It This Plat Supersedes that Plat I/ '/ ' ! Recorded in Plat Book 30 at page 96 Lake James Dab xmv Ckef- am 10 MOD / r �. tt7�!"i•�t,.tt/tPdt7tl it�..� �� �, f Xafh tllroAaa halt `, Of 1k8esau M-b-aisle �� \��•'% ertlq t Xbpliyptb stlaWn�oM and al bq rt.rem.ob hr SeNdw. 4tar, atte1�tL•�,6_._ J.�i�U Mountaineer Land Surveying, Pt 29 Summit Avenue -Spruce Pine -North Carolina-28777 (828) 785-5W Soale is 1'=80, (1:720) 0 80' eo' in, 18t' so Job No. 14-152RKV Don Clayton 810 Marina Dr Go gl2 Maps DON CLAYTON - 810 MARINA DRIVE o glee Map data ©2020 500 ft m s s, or) C� �'� ;;:a= State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: DON CLAYTON Mailing Address: 623 UPPER SONDLEY DR ASHEVILLE NC 28805 Telephone Number: 828-777-7841 Fax Number: E-mail Address: 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http•//www saw usace army mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: CARISSA PARKER Company Affiliation: BENNICK ENTERPRISES, LLC. Mailing Address: 7836 HWY 70 EAST NEBO NC 28761 Telephone Number: 828-659-1000 Fax Number: 828-659-1001 E-mail Address: CARISSA@BENNICKGRADING.COM B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 'D ov-\ CA aA�Atl-� 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: MCDOWELL Nearest Town: MARION Lake/ river/ ocean adjacent to property: JAMES Property size (acres): 1.8 Subdivision name or site address (include phase/lot number): BEAR POINTE 1 810 MARINA DR Directions to site - please include road names and numbers, landmarks, etc.: FROM MORGANTON TAKE HWY 126 / TO S MTN INSTITUTE RD / TO LAKE JAMES RD / TL ONTO MARINA DR TO PROPERTY AT THE END Latitude (in decimal degrees) 35.74760 Longitude (decimal degrees) 81.95889 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): VACANT WOODED LOT 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 70' SHORELINE STABILIZATION BY BARGE, HEIGHT WILL BE 5' 7. Will work be conducted from land? ❑ From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 2' X 70' = 140 SQ FT Temporary impacts in square feet: NO TEMP IMPACT 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 3'X 70'= 210SQFT Temporary impacts (temporary clearing, construction corridor) in square feet: NO TEMP IMPACT 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 5 TREES LESS THAN 6" AND 3 TREES GREATER THAN 6" WILL BE REMOVED TO COMPLETE THIS PROJECT. THEY WILL BE REPLACED INCH FOR INCH, WITH TREES TOTALING THE SAME DIAMETER. ANY REMAINING DISTURBED AREA WILL HAVE MULCH APPLIED TO IT FORM: SSGP 02-2017 Page 2 of 3 Do;\ (�LA�� 11. Sig atu ; O gent's Sig ure [15A CAC 0 H .0502(f)j ate 'Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation La ke ,At Full Pond/ Normal Water Level) Full Pond/ Normal Water AM II&M Awl Shoreline T-',CCV (P+ I Plan View FORM: SSGP 02-2017 Page 3 of 3 DON CLAYTON LAKE JAM ES 810 MARINA DR TO: NORTH CAROLINA DIVISION OF WATER RESOURCES I GIVE CARISSA PARKER, OF BENNICK ENTERPRISES, LLC., PERMISSION TO SIGN AS MY AGENT ON MY APPLICATION FOR SHORELINE STABILIZATION. DATE zvm� .2-a rue n. Atr.b and pbdwm \ dn.r w aYWw Mb r W. a�r.w W .a•'f'4.� d b ..r..re b x daWe a . pen.t. r..d .D.D mebdr wYe. w .rOr a w pmwr w t.o.rbd dlrriaw.. • 4 mrbrWM rW e.n. role )tveY d L.6 4. plwb ►a.4 set P.YY r..4 w Ike .dda...r d Yb rerM i APr tM e.n 46 Dial W!� s P� �� k aoo4 srmN �D.es sob ras a.ba...e. M ..w r..d w W a pinb rrdr yy w 1eC Dyufrd d n..yrauo. awba .v .d4b* .a.d w rrgr d r.r� d arlMl rrdrw. 6 .daDq w dY.t..r..dlr d.D d.dbd. w rwr d .rr b . pr►De r..d Na nw CJRol1 - 1te XMU COMIrr and r.r n�rY4.n. a w W d ams. r of Rod. d D.b r N.D..W ,.ay R.r16 arrn. a u. dw r m— Lake .lames IN Door d puke seep Corp«r Nan .e Pry Notes: 1. 1kb IN . WkAddlm MMW d e P•Vw of Yet Pr�e� reseeded m Cr.eeadebd awt hipmefy FM a �d c imdei� it A bw i fJr t4 a .. edml. eD. py. eM of hWANE t .d w a.. bw 6/O ..led w D,at MdboL P ftmmb d yyr.wl .r ab.r abbebtrwn. 1 ..* Orb wr .r aMddw .e.a h . h. ,Waof mr Ar ,r+ - b e..m. d nr a.4 a w. a��r ice'; 1\ xoWaoaata iar-sotaoln:zzt�ld .17.2DI80 ' 7 m M PL 31 {. fkr were{► r A" rd.ae m .sees homwdo r arm mp�•�•��y a U. am ra r.w.a.w mr.moea. �;P00 hd d tbb PdPetil ale m, a o dwetw of ddeft tuber .r d.e ®bm et0esk. ,eras e . dreWw a e MW Pemt / Ile—•— n..- — — Uw 8 PePWO, &W J sea ; lA— e — IYew sea A No Wh w. Dsa Ddbeake m aw I.ded hiwl Atea n C®wadDba a.PeR► � ta& � ? epe t tlamok ,. here, A o Poemed. A w Pew / Jr.laeor ddm r eo d rad d ter her daN.d and mwrad ham eM i' / r MW e.bra, U=w bww not bm mo.cea at W UM A Arm liwbb a ama to .m. ahoy.. to toe a '. 1 /ZArm A Rr�iter�d od bw ". ana b dn. ebege to lot 1 and tb. wamwt awe ti '/ : /r /• j as >w eYw ..eek bw own Pwhemed M EL aWwdAweia° .kD. \v awk Lake lameff Dnloe Orep atPweYanTWO L id. L !Wm wl� IwW�tllr a� s 1m Wr ,`�ti\.`` "��•""r '� .! �„��' WTI Ya~d imrrrYW1YW •.`�_ •-`..:/`J.: .'�.J� b rr a.r Yr IN urt w bW.M..e eery./ .r d.qr •OYr m Iwf w.r` fd 6, tlr ++rl w Total Area = 0.328 Acres 6 Subdivision Survey v for Donald K Clayton, Trustee * ed Recorded in Consolidated r 1, Rearl Property 752 at page 782 and j•.•.••• 11 i ! rr/; ; Plat Book 9 at page 14 (Owner —Black Bear Development, Inc.) , / ,;''r' ', Nebo Township f `, . r '/,i t McDoweil County —North Carolina August 12, 2014 Revised March 9, 2015 Revised October 15, 2018 Revised October 16, 2018 if ; �' / •'-` lr This Plat Supersedes that Plat Recorded in Plat Book 80 at page 98 Labe James I%/' , J t ' /P/ pad seep aePaeeten pf t01 j`r�/WA /era AdIAQa' j � r— `\`•. � !seas' ,ate'all aseva7� s \� mwNisY�L \_ blaib CrrnYa pet-be-ae+w d l%iAe..9 rd.r amsr d NO-0 Domy. d Vb" aft *r adDtatl. r .�.d tQ-tT-t� t bWWdow wee. P� NUD Mountaineer Land Survayla8, P.A. I/r.. m o em 29 summit Avenue-spruoe Pine North Cerollna-2877'J (M) M-5818 am_ Soale is 11=80' (1:720) 0 ar ar lar Or aer Job No. 14-1521W Don Clayton IA y AA � Y fok w 1 i / y h � q`.`.' x.. i "^'w,a����..✓a. ,n ,, ,. R �:;. ,.., h 'k. � „�6, _✓L£s Hi.Fa �� .wr,,, �,..:.. v� .., 810 Marina Dr 1) oYA c1 )Pv- ME Map data ©2020 500 ft N ID#* 20201790 Version* 1 Regional Office* Asheville Regional Office - (828) 296-4500 Reviewer List* An Annino Pre -Filing Meeting Request submitted 11/19/2020 Contact Name * Stefan Wilson Contact Email Address* carissa@bennickgrading.com Project Name * Bear Point 1 - 810 Marina Dr Project Owner* Don Clayton Project County* McDowell Owner Address: Street Address 623 Upper Sondley Dr Address Line 2 RECEIVED DEC 31 2020 NCDEQ/DWR/NPDES City State / Province / Fegion Asheville NC Fbstal / Zip Code Country 28805 USA Is this a transportation project? * f" Yes r NO Type(s) of approval sought from the DWR: r 401 Water Quality Certification - W 401 Water Quality Certification - Regular Express r Individual Permit r Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Amy Annino Please give a brief project description below.* 70' Shoreline stabilization by barge Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. Of ONY By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: a This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your projects thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/19/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No