HomeMy WebLinkAbout090041_Plan of Action (POA)_20201130 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: - Lt , _ County: 16et)
Facility Name: Po re Pa r &rs
Certified Operator Name: DDY] bu Il eY Operator#
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest
point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon
to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier(ID): ! 2.
Spillway (Yes or No):
Level (inches): I F3 13
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five and
30.day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges.
V Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of
Action is attached, Agronomic balance is within acceptable range.
. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped
and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with
related facility number(s), number acres and receiving crop information. Contact and secure
approval from the Division of Water Resources prior to transfer of waste to a site not covered in
the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
attach a complete schedule with corresponding animal units and dates for depopulation
-If animals are to be moved to another permitted facility, provide facility number, lagoon freeboard
levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: '? i t J BO I a ab
I hereby certify that 8 have reviewed the information listed above and included within the attached Plan of
Action,DD
and to the best of my knowledge and ability,the information is accurate and correct.
n 13u I"l'e Phone: 910 SqO -63 9
Facility Owner/Manager(print)
( 11 Date: / 3o/ dc o
—..._......, L
Facility Owner/Manager(signature)
PoA Cover Page 2/21/00
IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: ' Pork Partners 1 line m= 86.0 lb PAN
2. Structure ID: Pork Partner 2 line m= 68.2 lb PAN
3. Structure ID: line m= lb PAN
4. Structure ID: line m= lb PAN
5. Structure ID: line m= lb PAN
6. Structure ID: line m= lb PAN
n. Iines1 +2+3+4+5+6= 154.3IbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o.tract# p.field# q.crop r.acres s.remaining IRR-t.TOTAL PAN u.application window
2 PAN balance BALANCE FOR
(lb/acre) FIELD(lbs.)
column r x s
T877 1A overseed 1.00 40.00 40.0 Sept-April
T877 1 B overseed 1.80 40.00 72.0 Sept-April
T877 2A overseed 3.00 40.00 120.0 Sept-April
T877 2B overseed 3.40 40.00 136.0 Sept-April
T877 3A overseed 3.80 40.00 152.0 Sept-April
T877 3B overseed 3.50 40.00 140.0 Sept-April
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v.Total PAN available for all fields(sum of column t)= 660.0 lb.PAN
IV.FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied(line n from section II)= 154.3 lb.PAN
x. Crop's remaining PAN balance(line v from section III)= 660.0 lb.PAN
y. Overall PAN balance(w-x)= -506 lb.PAN
Line y must show as a deficit. If line y does not show as a deficit,list course of action here including pump and
haul,depopulation,herd reduction,etc. For pump&haul and herd reduction options,recalculate new PAN based
on new information. If new fields are to be included as an option for lowering lagoon level,add these fields to the
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
Will pump as soon as conditions allow.
PoA(30 Day)2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): Pork Partners 1
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm&structural freeboard 19.0 inches
c. line b-line a(inches in red zone)= 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 25625,ft
2
e. line c/12 x line d x 7.48 gallons/ft3 15973 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 26023 ft3
h. current herd# 3552 certified herd# 3552
actual waste produced = current herd# x line g = 26023 ft3
certified herd#
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 15925 ft3
k. (lines h +i+j)x 7.48 x 30 days/line f= 52295 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 9/4/2020. 1.26 Ibs/1000 gal.
m. ((lines e+k)/1000)x line I = 86.0 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA(30 Day)2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): Pork Partner 2
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yrJ24 hr. storm &structural freeboard 19.0 inches
c. line b-line a (inches in red zone)= 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 34121 ft2
e. line c/12 x line d x 7.48 gallons/ft3 21269 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 26086 ft3
h. current herd# 3552 certified herd# 3552
actual waste produced = current herd# x line g = 26086 ft3
certified herd#
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 21247.9 ft3
k. (lines h + i+j)x 7.48 x 30 days/line f= 59010 gallons
PoA(30 Day)2/21/00
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 9/4/2020 0.85 Ibs/1000 gal.
m. ((lines e+ k)/1000)x line I= 68.2 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.