Loading...
HomeMy WebLinkAbout090041_Plan of Action (POA)_20201218 �,-�N OF ACTION (PoA) FOR HIGH FREE OARD AT'ANIMAL FACILITIES Facility Number: 91 - Lt / 0 County: Eh den .. Facility Name: Po fk' .�Q Y mYS • Certified Operator Name: DOYI bit tier Operator# 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 . Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier(ID): . 1 2. Spillway(Yes or No): Level (inches): /7 -l 7 2. Check all applicable items 7- atim 4 0n'1 ////5/2DZ0 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30.day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. e/ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. -attach a complete schedule with corresponding animal units and dates for depopulation -if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I �- . 1l (fib b I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Dciri b(A.+14-ir Phone: 910 Jei0 -6goo Facility owner/manager(print) . .._ L( 'J Date: 12 / r8 /Dal) Facility Owner/Manager(signature) • PoA Cover Page 2/29100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.I24 c HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Pork Partners 1 line m= 106.1 lb PAN 2. Structure ID: Pork Partner 2 ' tine m= 86.3 lb PAN 3. Structure ID: line m= lb PAN • 4. Structure ID: line m= lb PAN 5. Structure ID: line m= lb PAN 6. Structure ID: line m= lb PAN n. lines 1 +2+3+4+5+6= 192.5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o.tract# p.field# q.crop r.acres s.remaining IRR-t TOTAL PAN u.application window 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) • column r x s T877 1A overseed 1.00 30.00 30.0 Sept-April • T877 1 B overseed 1.80 30.00 54.0 Sept-April T877 2A overseed 3.00 30.00 90.0 Sept-April T877 2B overseed 3.40 30.00 102.0 Sept-April T877 3A overseed 3.80 30.00 114.0 Sept-April T877 3B overseed 3.50 30.00 105.0 Sept-April guesimates on PAN balance • • 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields(sum of column t)= 495.0 lb.PAN IV.FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied(line n from section II)= 192.5 lb.PAN x. Crop's remaining PAN balance(line v from section III)= 495.0 lb.PAN y. Overall PAN balance(w-x)= -303 lb.PAN Line y must show as a deficit. If line y does not show as a deficit,list course of action here including pump and haul,depopulation,herd reduction,etc. For pump&haul and herd reduction options,recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level,,add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility,provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will pump as soon as conditions allow. PoA(30 Day)2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): Pork Partners 1 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches c. line b-line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 25625 ft2 e. line c/12 x line d x 7.48 gallons/ft3 31946 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 26023 ft3 h. current herd# 3552 certified herd# 3552 actual waste produced = current herd# x line g = 26023 ft3 certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 15925 ft3 k. (lines h +i +j)x 7.48 x 30 days/line f= 52295 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/4/2020 1.26,Ibs/1000 gal. m. ((lines e+k)/1000)x line I= 106.1 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): Pork Partner 2 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches c. line b-line a (inches in red zone)= 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 34121 ft2 e. line c/12 x line d x 7.48 gallons/ft3 42538 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 26086 ft3 h. current herd# 3552 certified herd# 3552 actual waste produced = current herd# x line g = '26086 ft3 certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 21247.9 ft3 k. (lines h +i +j)x 7.48 x 30 days/line f= 59010 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/4/2020 0.85 Ibs/1000 gal. m. ((lines e+ k)/1000)x line I= 86.3 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) • • PoA(30 Day)2/21/00