HomeMy WebLinkAboutNCC205350_Modification Review_20210106Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 1/6/2021 11:30:13 AM (ADD TO FILE Submittal)
Approve by Georgoulias, Bethany 1/6/2021 4:25:50 PM (Construction COC ADD TO FILE Review- NCC205350)
• The task was assigned to Georgoulias, Bethany. The due date is: January 11, 2021 5:00 PM
1/6/2021 11:30 AM
Y . Ta4M1
NORTH CAPOLINA
EnYlrenmemf& Qualay
Certificate of
NCC205350
Coverage (COC)
Enter the Certificate of Coverage Ninber (Use capital letters)
No.*
Information associated
with this permit:
Project Name
Project Walter
Address
4401 Auburn Church Rd, Raleigh, NC
County
Wake
Latitude
35.7192
Longitude
-78.5677
Permittee Listed
Duke Energy Progress, LLC
Legally Responsible
Eric Rouse
Individual
NC Reference No.
NCG01-2020-5350
E&SC Plan ID
Wake-2021-029
Original NOI
36628
Tracking No.*
Date COC Issued*
11/23/2020
Prior Rescission
This field will populate only if CCChas already been rescinded.
Date
Modification Information:
Reason for r Closed -Out Lots/Outparcels in E&SC Plan
Modification * r Additional Lots/Outparcels Approved - E&SC Revised
F Other Revision(s) to E&SC Plan
r Legally Responsible Individual and/or Site Contact Has Changed
r Multiple Reasons (List)
Addional Nbre information if needed (e.g., new Site Contact details can be included here)
Explanation Additional land disturbance
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable
sheets).
For changes to the legally responsible individual, you must upload this form.
Supporting Upload Supporting Documentation (%vised ERSC Approval, (lose -Out Doc, etc.)
Documentation WAKE-2021-029_20201221_LOA.pdf 266.24KB
Mast be FDFformat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to e)ceed ten thousand
dollars ($10,000).
rJ I hereby request modification to coverage under the NPDES Stormwater Permit
for the subject project site. I am familiar with the information contained in this
request and to the best of my knowledge and belief such information is true,
complete and accurate.
Specify if you are:* r The Legally Responsible Individual
f Authorized Responsible Person*
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Eric J Rouse
Title * Director, Land Services
Organization* Duke Energy Progress, LLC
Date * 01 /06/2021
Email Address* eric.rouse@duke-energy.com
Errail for confirrration
Telephone Number* 9196163028
Contact nun ber if we need to reach you
Note: Original permittee and site contact are copied on modification correspondence.
Additional Email Additional email for confirmation
(Optional)
Original Permittee eric.rouse@duke-energy.com
Email
Original Site Contact knelson@brassfieldgorrie.com
Email
Review Date 01/06/2021
Rescinded Since
Submitted?
Request Date 20210106
Formatted
Review Date 20210106
Formatted