Loading...
HomeMy WebLinkAbout20101024 Ver 1_Application_20101010 f o?0F W A 7' f"? U L_ V r N ? 1 0.1p10 Q "E7 as` W4 "1024 Office Use Only: Corps action ID no. DWQ project-no. Form Version 1.3 Dec 10 2008 Pre-Construction M U tion C Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number. 3 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ? Yes ® No I 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ® Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. El Yes ® No I1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ® No I1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ®No ?2. Project Information 2a. Name of project: SR 1800, Leary Mills Road Over Un-Named Tributary of Clayroot Swamp Pitt County 2b. County: Pitt 2c. Nearest municipality / town: Greenville 2d. Subdivision name: N/A $e. NCDOT only, T.I.P. or state project no: 2.207411 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 105 Pactolus Highway NC 33 P.O. Box 1587 :3e. City, state, zip: Greenville, NC 27835 3f. Telephone no.: 252-830-3490 3g. Fax no.: 252-830-3341 3h. Email address: jbjohnson@ncdot.gov Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: Division 2 Environmental Officer 4b. Name: Jay B. Johnson 4c. Business name (if applicable); North Carolina Depratment of Transportation 4d. Street address: P.O. Box 1587 4e. City, state, zip: Greenville, NC 27835 4f. Telephone no.: 252-830-3490 4g. Fax no.: 252-830-3341 4h. Email address: jbjohnson@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: NIA 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2.of 10 PCN Form -Version 1.3 December 10, 2008 Version `';'' B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): SR 1800,Leary Mills Road Over Un-Named Tributary of Clayroot Swamp Latitude: N 35.396623 Longitude: - W 1b. Site coordinates (in decimal degrees): 77.258284 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: N/A acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Un-Named Tributary of Clayroot Swamp, a Tributary of proposed project: Swift Creek 2b. Water Quality Classification of nearest receiving water. C;Sw;NSW 2c. River basin: Neuse Middle Neuse 03020202 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: SR 1800, Leary Mills Road is a paved secondary state highway. Woodlands and Agriculture dominate the landscape. 3b. List the total estimated acreage of all existing wetlands on the property: 135 Square Feet of 404 Wetland Impacts For The Pipe To Pipe Replacement. 3r.. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 60' This site is part of a longer adjacent stream system 3d. Explain the purpose of the proposed project: Pipe To Pipe Replacement ; the existing pipe has deteoriated and needs replacing. 3e. Describe the overall project in detail, including the type of equipment to be used: The Existing 64' x 42" CMP will be replaced with a Proposed 81"x 59"x64' CMAP. Excavators,Dump Trucks,and Crane Trucks will be used for the Bridge To Pipe Replacement. 14. Jurisdictional Determinations 14a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ® No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final I of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Mike Sutton Other. NCDOT d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. October,2010 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans fia. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Welland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a! 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction I number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) temporary W1 ®P ? T Fill Bottomland ® Yes ® Corps 50 Sq ft Hardwood Forest ? No ? DWQ . . W2 ® P ? T Fill Bottomland ® Yes ® Corps 20 Sq ft Hardwood Forest ? No ? DWQ . . W3 ®P ? T Fill Bottomland ® Yes ® Corps 50 Sq. ft Hardwood Forest ? No ?DWQ . W4 ® P ? T Fill Bottomland ® Yes ® Corps 15 Sq ft Hardwood forest ? No ? DWQ . . W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ I2g. Total wetland impacts 135 Sq. Ft. I2h. Comments: 135 Sq. ft. (0.003 Acres) 404 Wetland Impacts 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. I3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) j S1 ®P ? T Pipe Un-Named Tributary of ® PER ? Corps 15' 4' 'Clayroot Swamp ? INT ® DWQ S2 ®P ? T Pipe Un-Named Tributary of ® PER ?INT ? Corps ®DWQ 15' 0 Clayroot Swamp . S3 ®P ? T Pipe Un-Named Tributary of ® PER ? Corps 15' 4' I cayroot swamp INT ? ® DWQ S4 ®P ? T Pipe Un-Named Tributary of ® PER El Corps 15' 0 Clayroot swamp ?INT ®DWQ S5 ? P ? T El PER F1 Corps I [3 INT ? DWQ S6 ? P ? T E] PER El Corps I ? INT ? DWQ ?.h. Total stream and tributary impacts 8 LF, ili. Comments: 8 Linear Feet of Stream Impacts Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number- (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 1 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 15f. Total None 5g. Comments: None 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: ISi. Expected pond surface area (acres): I5j. Size of pond watershed (acres): ISk. Method of construction: I6. Buffer Impacts (for DWQ) If project will impact a protected ripadan buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ?Tar-Pamlico ? Other: None lProject is in which protected basin? ? Catawba ? Randleman b. 6c. 6d. 6e. 6f. 6g. I Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) T (T) impact required? B1 ®P ? T Fill Un-Named Tributary of ? Yes 715 Sq. Ft. 485 Sq. Ft. Clayroot Swamp ® No B2 UP [J T Fill Un-Named Tributary of ? Yes 735 Sq. Ft. 485 Sq. Ft. Clayroot Swamp ® No B3 ®P ? T Fill Un-Named Tributary of ? Yes 705 Sq. Ft. 475 Sq. Ft. _ Clayroot Swamp ® No 6h. Total buffer impacts Gi. Comments: See Page 6-A For Total Buffer Impacts Page 5 of 10 PCN Form -Version 1.3 December 10, 2008 Version 4., Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 411 Total open water impacts None 4g. Comments: None 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded 1 P1 1 P2 i5L Total None 15g. Comments: None 15h. Is a dam high hazard permit required? ?Yes ? No If yes, permit ID no: 15i. Expected pond surface area (acres): I5j. Size of pond watershed (acres): 15k. Method of construction: 16. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ?far-Pamlico ? Other: None Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) , Temporary impact required? I 61 ®P ? T B4 Fill Un-Named Tributary of ? Yes 735 Sq. Ft. 465 Sq. Ft. Clayroot Swamp ®No E32 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 2890 Sq. Ft. 1910 Sq. Ft. 6i. Comments: 71 Page So 10 PCN Form -Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 13. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. There are 135 Sq. Ft. of 404 Wetland Impacts for this Project; Therefore,The Wetland Impacts have been minimized to the greatest extent feasible, with just those impacts occurring for the pipe installation for the project l lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Use of existina roadwav to ooerate construction eouioment: no eauioment will enter wetlands. I, 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State tai Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No I 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c: If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permitee Responsible Mitigation I3. Complete if Using a Mitigation Bank I3a. Name of Mitigation Bank: I3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In4ieu Fee Program I4a. Approval letter from in-lieu fee program is attached. ? Yes I4b. Stream mitigation requested: linear feet I4c. If using stream mitigation, stream temperature: ? wane ? cool ?cold I4d. Buffer mitigation requested (DWQ only): square feet 14e. Riparian wetland mitigation requested: acres I4f. Non-riparian wetland mitigation requested: acres I4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: ?5. Complete if Using a Permittee Responsible Mitigation Plan 5a. I If using a pennittee responsible mitigation plan, provide a description of the proposed mitigation plan. i Page 6 of 10 PCN Form -Version 1.3 December 10, 2008 Version, i 3c. Comments: 4. Complete if Making a Payment to In4leu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres I4f. Non-riparian wetland mitigation requested: acres 14g. Coastal (tidal) wetland mitigation requested: acres I4h. Comments: 15. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -required by DWQ I6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? I ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) (Zone 1 3 (2 for Catawba) (Zone 2 1.5 6f. Total buffer mitigation required: None 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, per mittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). N/A 6h. Comments: Page 7 of 10 PCN Form -Version 1.3 December 10, 2008 Version I E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 1. Diffuse Flow Plan 1a . Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1b . If yes, then is a diffuse flow plan included? If no, explain why. Comments: Sheet flow through Vegetated Uplands and Special Sediment control ® Yes ? No Fence will be used to treat Stormwater Runoff from the road. Roadside ditches will have wattles installed to treat water before entering into the buffers; the roadside ditches are vegetated and will treat stor mwater as well. I2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? N/A Roadway/Bridge Project % I2b . Does this project require a Stormwater Management Plan? ® Yes ? No I2c . If this project DOES NOT require a Stormwater Management Plan, explain why: 2d . If this project DOES require a Stor mwater Management Plan, then provide a brief, narrative description of the plan: Sheet flow through Vegetated Uplands and Special Sediment control Fence will be used to treat Stormwater Runoff from the road. Roadside ditches will have wattles installed to treat water before entering into the buffers; the roadside ditches are vegetated and will treat stonmwater as well. ? Certified Local Government 2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stor mwater Program i ® DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ? Phase II ? NSW 3b . Which of the following locally-implemented stormwater management programs El USMP ? apply (check all that apply): ? Water Supply Watershed i ? Other. N/A i 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No i attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ® Other: NPDES Permit b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ® No !5. DWQ 401 Unit Stormwater Review I 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No Page 8 of 10 PCN Form -Version 1.3 December 10, 2008 Version 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No F. Supplementary Information I1. Environmental Documentation (DWQ Requirement) i la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes E] No Comments: I2. Violations (DWQ Requirement) I2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H.1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? Qb. I Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered 'yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) I 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered 'no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 0.a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a . Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b . Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? E] Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? On-Site Investigation 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ®No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? i On-Site Investigation 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? SHPO Website 8. Flood Zone Designation (Corps Requirement) 18a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No I8b. If yes, explain how project meets FEMA requirements: Pipe designed to no-rise standards I8c. What source(s) did you use to make the floodplain determination? FEMA FIRM Maps Jay B. Johnson ( L ?L December 7, 2010 Applicant/Agents Printed Name pli nU nt's Signature " Date (Agent's signature alid o ly rf authorization letter from the applicant rovided. Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version W tid ee W I ? W I= I I W ti F v I ] j ?N ° I W W W NOW '? 2 ?' 2 ~ ? I ,? Oj ^v1 w Uf 2? Q 1 ? W tl qQ Nmm I Q LLA N N I I NW I o ag I M j {n yo ??] ?o ?p W SO m?°°' 8 W I II w ?t 'IN "?d ?F? \ ?4 1 W W ' N 4 n? ~ ?NI J ? W ? q W J W ? 224 Q : cz ' m m ? W ? ? W j j 3 M 3q ?^ I I m ? ?m m I W 0 Aj P _ a$m a? I?? I N Ph K M Lb ro ??e Ln y ?d I ?v W N W I ? ? 0 d ' ti ee ti ? ? ? d ee ^? f f I Q V I ? I ? b w b ? II CL K W lyj W a `x ? ? I o W ti, W a 3?, g to v ? I Of I ti ??? ?S Y N J li? h qp . ?4p2 I li o10? d ov'? ] J,of Z II,? JJ v In m o j2WMln ?i?° ° 2??OW0 II II1? n1 m YY- N t , of J F. 1 °. In 0 O? ?` ?' W O m L, r . P ? 81'1 O In ? N v H? ? W 8? ti m q W q yWj f? 0 2 2 f N N I C W ?U w I m I? n? O 431 q ? W O W ?W q W g b? W m ?q2 ???q?2V?W 3qq I' o _ W .. WIC d y j I ? W Q-] W m ? W W 1/1 O 1/1 ", H O W J J i Lu m m y W i e ti h p / F 1? 3 J w O s W 3 W C'! W 2 m ? O\ m.... -\ `ti Vf 22U0 ... w Q ? LL W K m D w m a m a W a a a -J U U Fx4 CIOD A rti ¢I w I °a I z z I O F' i K ml ? a w' I I I ?I ° I I II I II I ; I I n. 1 Q LU m ? U I I I I v m o I x' ; I IN?;I - `0) IL H c9 _ ---- 1?4, I x z r Imo' ; I = u H I IZI ; 1 IN I _ ro 14 w ? 1 I II o W X 3 ° lwl l p O. O I i; l oa x m o II I '.I I .I I 1 a 00 O l ? w Z F O IY Z c Q a i CL ? W Q w I I m o m a O a l W m p w I m F ¢ W F m tl Z F. m X W o x F ? v F [? U h y h y y h O O a ? U U 40 A U 405 y H O F O ti a k Q I I I I W ? I O w ? ww I I 0 0 N 6 N w `Y Mm c r c O w N N ° o w .. H w w m F w o m a I m 3 ° m 3 Y d m N m m W N J a U o m 0 0 z m o z w a ?= ON o w ¢ m Zm ? a a Q Z Z o< O 0 w O J2 J W m m a• K p? m F-m J ? a > a. m ¢ > N Op0 °U > HwOw w 2 n I iz a aZ m v a II i w = U rc Z Z? R Z YO O Z U ¢ J a w Z a m m w K U O m m d e 6 m„ a? 3'm „owa? wewn? Ip' x d I ?pw I ' i I I ? I I i I i 1 i I I a I I ? I U I O. I I ?m I mx I xH ? I W O I LL a ? m ? x T Z I I m N i m I a x u'S 1 4 I W ` m i m Z I w W 3m w ' a dZ wy I QI m a I ? c :* . m 2 0 a W m r ? a. a pl W p Oa yp W? .. d? Z W ... F O o ::E e u a 0 ? 0 x O ? xw w Z W..- W P W U A PITT COUNTY SR 1800, LEARYMILLS ROAD OVER UN-NAMED TRIBUTARY OF CLAYROOT SWAMP EXISTING 42" CORRUGATED METAL PIPE PROPOSED 81 "x 59" CMAP GARDNERVILLE USGS QUAD MAP , W E SHEET NUMBER 80-B - OF THE SOIL SURVEY OF PITT COUNTY FIRM PANEL 5600 K MIDDLE NE USE 03020201 MAP NUMBER 3720560000K NE USE RI VER BASIN (! CLAYROOT SWAMP C;Sw;NSW OCTOBER 17, 2010 i ?tabwrad. s L r_. I Lane Rd - I? Lewis 75 - - -1 ,» k Co Cem l I '? ? 1 a ?y Y- 603926.2590 , .. .... -.. 14 ?- J., j` T` ??. x6.5 '.\•. X= 2519050.6070 N35^-23'-49" ) !: W 77^-IS'--29"groat. 1 I N35.396623 DEGREES W 77.258284 DEGREES ?. t - ?- cam Lem. - oot clay, mk Fic't ° . i . r {?. 'Aa (D '1 inch - 2,000 feet 0 750 1,500 3,000 4,500 6,000 Feet PITT COUNTY SR 1800, LEARY HILLS ROAD OVER UN-NAMED TRIBUTARY OF CLAYROOT SWAMP EXISTING 42" CORRUGATED METAL PIPE PROPOSED 81 "x 59" (:MAP GARDNERVILLE USGS QUAD MAP SHEET NUMBER 80-B OF THE SOIL SURVEYOFPITT COUNTY FIRM PANEL 5600 K MIDDL F. NE USE 03020202 MAP NUMBER 3720560000K NE USE RI VER BASIN CLAYROOT SWAMP C;Sw;NSW m c 0 m U OCTOBER 27, 2010 Rd N W E I s c. Y= 603926.2590 X= 2519050.6070 N35 ^-23'-49" W 77^45'--29" N35.396623 DEGREES W 77.258284 DEGREES \0 m a a 10 0 750 1,500 3,000 4,500 6,000 Feet 1 inch = 2,000 feet A I PITT COUNTY SR 1800, LEARYMILLS ROAD OVER [IN--NAMED TRIB UTAR Y OF CLA YROOT SWAMP EXISTING 42" CORRUGATED METAL PIPE PROPOSED 81"x 59" CMAP GARDNERVILLE USGS QUAD MAP SHEET NUMBER 80-B OF THE SOIL SURVEY OF PITT COUNTY FIRM PANEL 5600 K MIDDLE NEUSE 03020202 MAP NUMBER 3720560000K NEUSE RIVER BASIN C'LA YROOT SWAMP C; Sw; NSW OCTOBER 27, 2010 Lewis Lane Rd r1L; _,w,`'? s N S yo b? ?a v I'= 603926.2590 k 2519050.6070 N 35^-13'-49" W 77^-15'--29" N 35 346623 DEGREES W 77.258284 DEGREES a - - a 1 inch = 2,000 feet n ''?00 1 '1:)0 4 800 6 400 Feet