HomeMy WebLinkAboutWQ0007217_Monitoring - 09-2020_20210106UNITED STATES MARINE CORPS
MARINE CORPS AIR STATION
POSTAL SERVICE CENTER 8003
CHERRY POINT, NORTH CAROLINA 28533-0003
North Carolina Department of
Environmental Quality
Division of Water Resources
Attn: Information Processing Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Subj: NON -DISCHARGE PERMIT MONTHLY REPORTS
Marine Corps Air Station Cherry Point submits
monthly Non -Discharge Application Reports (NDAR)
Monitoring Reports (NDMR) in accordance with the
WQ0007217 for the month of September 2020.
IN REPLY REFER TO:
5090/07109
LN
October 14, 2020
the enclosed
and Non -Discharge
following permit
Should you have any questions, please contact Mr. Timothy
Lawrence of the Environmental Affairs Department at your earliest
convenience at (252) 466-2754.
Sincerely,
ANfHO Y A FERENCE
Dep'u-�y Facilities Director
By direction of the
Commanding Officer
Enclosures: (1) NDMR for Piney Island (BT-11)
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR) Page 1 of 2
Permit No.: WQ0007217
FacilityName: U.S. NAVAL FAC. ATLANTIC DIV., BT-11
County: Carteret
Month: September
Year: 2020
• irrigation
OEM=
occur at
this facility?
Cover Cr
Cover Crop.
RIYES ■ •
Rate (in):
Annual Rate (in):Hourly
■ •
■ ■ •
lcz=■
0 •
■ 0 •
Igo
NEMMM
momo®moo
,,.
• •,
������...��...��
Monthly LoadincKEL
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR) Page 2 of 2
Did the application rates exceed the limits in Attachment B of your permit?
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
Was a suitable vegetative cover maintained on all sites as specified in your permit?
Were all setbacks listed in your permit maintained for every application to each permitted site?
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
(]Compliant (melon -Compliant
l]Compliant aon-Compliant
[]compliant dVon-Compliant
❑� Compliant melon -Compliant
❑� Compliant aon-Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Jeffrey Clayton
Permittee: U.S. Marine Corps Air Station, Cherry Point
Certification No.: 998515
Signing Official: Anthony A Ference
Grade: SI Phone Number: 252-466-5874
Signing Official's Title: By direction of the Commanding Officer
Has the ORC changed since the previous NDAR-1? Oyes ❑� No
Phone Number: 252-466-4599 Permit Exp.: 4/30/21
10/13/20
f Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, `at this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on
my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of 2
Permit No.: Q00M
Flow Measuring Point: E4nfluent ■ ■
o ■ ■ ■. Flow Generated
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 2 of 2
Sampling Person(s) Certified laboratories
Name: J. Clayton Name: MCAS Cherry Point, NC 28533
Name: Name:
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑+Compliant []Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
taKen. Attach aaanionai sheets it necessary.
Operator in Responsible Charge (ORC) Certification
i
Permittee Certification
ORC: Jeffrey Clayton
Permittee: U.S. Marine Corps Air Station, Cherry Point
Certification No.: 998515
Signing Official: Anthony A Ference
Grade: SI Phone Number: 252-466-5874
Signing Official's Title: By direction of the Commanding Officer
Has the ORC changed since the previous NDMR? ❑Yes RINo
Phone Number: 252-466-4599 Permit Expiration: 4/30/2021
10/13/2020
7_
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment
for knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617