Loading...
HomeMy WebLinkAboutWQ0007217_Monitoring - 09-2020_20210106UNITED STATES MARINE CORPS MARINE CORPS AIR STATION POSTAL SERVICE CENTER 8003 CHERRY POINT, NORTH CAROLINA 28533-0003 North Carolina Department of Environmental Quality Division of Water Resources Attn: Information Processing Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Subj: NON -DISCHARGE PERMIT MONTHLY REPORTS Marine Corps Air Station Cherry Point submits monthly Non -Discharge Application Reports (NDAR) Monitoring Reports (NDMR) in accordance with the WQ0007217 for the month of September 2020. IN REPLY REFER TO: 5090/07109 LN October 14, 2020 the enclosed and Non -Discharge following permit Should you have any questions, please contact Mr. Timothy Lawrence of the Environmental Affairs Department at your earliest convenience at (252) 466-2754. Sincerely, ANfHO Y A FERENCE Dep'u-�y Facilities Director By direction of the Commanding Officer Enclosures: (1) NDMR for Piney Island (BT-11) FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR) Page 1 of 2 Permit No.: WQ0007217 FacilityName: U.S. NAVAL FAC. ATLANTIC DIV., BT-11 County: Carteret Month: September Year: 2020 • irrigation OEM= occur at this facility? Cover Cr Cover Crop. RIYES ■ • Rate (in): Annual Rate (in):Hourly ■ • ■ ■ • lcz=■ 0 • ■ 0 • Igo NEMMM momo®moo ,,. • •, ������...��...�� Monthly LoadincKEL FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR) Page 2 of 2 Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? (]Compliant (melon -Compliant l]Compliant aon-Compliant []compliant dVon-Compliant ❑� Compliant melon -Compliant ❑� Compliant aon-Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Jeffrey Clayton Permittee: U.S. Marine Corps Air Station, Cherry Point Certification No.: 998515 Signing Official: Anthony A Ference Grade: SI Phone Number: 252-466-5874 Signing Official's Title: By direction of the Commanding Officer Has the ORC changed since the previous NDAR-1? Oyes ❑� No Phone Number: 252-466-4599 Permit Exp.: 4/30/21 10/13/20 f Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, `at this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of 2 Permit No.: Q00M Flow Measuring Point: E4nfluent ■ ■ o ■ ■ ■. Flow Generated FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 2 of 2 Sampling Person(s) Certified laboratories Name: J. Clayton Name: MCAS Cherry Point, NC 28533 Name: Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑+Compliant []Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective taKen. Attach aaanionai sheets it necessary. Operator in Responsible Charge (ORC) Certification i Permittee Certification ORC: Jeffrey Clayton Permittee: U.S. Marine Corps Air Station, Cherry Point Certification No.: 998515 Signing Official: Anthony A Ference Grade: SI Phone Number: 252-466-5874 Signing Official's Title: By direction of the Commanding Officer Has the ORC changed since the previous NDMR? ❑Yes RINo Phone Number: 252-466-4599 Permit Expiration: 4/30/2021 10/13/2020 7_ Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617