Loading...
HomeMy WebLinkAbout310691_30 day poa_20210105PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-691 Facility Name: Certified Operator Name: County: Dupl i n Hog Heaven / Triple M Farms Tustin Murphy Operator 17253 lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Lagoon Name (ID): TM1 Spillway (Yes or No): Level (inches): 18" 2. Check all applicable items Structure 2 Structure 3 Structure 4 HH1 HH2 This Lagoon Not In Red at this time. 18" 21" Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation #NAME? 3. Earliest possible date to begin land application of waste: as weather permits I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Morris Murphy Phone: Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) 1/4/2021 Cover Page Hog Heaven Triple M (31-691) PoA30day (1-4-21) Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Triple M #1 (31-691) line m = 414.0 lb PAN 2. Structure ID: Hog Heaven #1 (31-691) line m = 382.1 lb PAN 3. Structure ID: Hog Heaven #2 (31-691) line m = 126.7 lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 922.8 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 5562 p24 Small Grain 4.78 25.00 119.5 10/1 - 3/31 5562 1 p25 Small Grain 3.54 25.00 88.5 10/1 - 3/31 5562 p26 Small Grain 3.41 25.00 85.3 10/1 - 3/31 5562 p27 Small Grain 2.48 25.00 62.0 10/1 - 3/31 71994 CP1 Wheat 39.50 68.00 2686.0 9/1 - 4/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3041.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 922.8 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 3041.3 lb. PAN y. Overall PAN balance (w - x) = -2118 lb. PAN Summary Hog Heaven Triple M (31-691) PoA30day (1-4-21) Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied as soon as weather permits. Summary Hog Heaven Triple M (31-691) PoA30day (1-4-21) Page 2 of 2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Triple M #1 (31-691) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 1.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 108,576 ft2 e. line c/12 x line d x 7.48 gallons/ft3 101,519 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116,329 ft3 h. current herd # 3,520 certified herd # 3,520 actual waste produced = current herd # x line g = 116,329 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 65,800 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 227,054 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/11/2020 1.26 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 414.0 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Hog Heaven Triple M (31-691) PoA30day (1-4-21) Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Hog Heaven #1 (31-691) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 1.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 89,3761 ft2 e. line c/12 x line d x 7.48 gallons/W 83,567 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116,329 ft3 h. current herd # 3,520 certified herd # 3,520 actual waste produced = current herd # x line g = 116,329 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 54,250 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 212,655 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/11/2020 1.29 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 382.1 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 2 Hog Heaven Triple M (31-691) PoA30day (1-4-21) Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Hog Heaven #2 (31-691) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 21.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) _ -2 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 888961 ft2 e. line c/12 x line d x 7.48 gallons/W -83118 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116329 ft3 h. current herd # 3520 certified herd # 3520 actual waste produced = current herd # x line g = 116329 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 54031.3 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 212383 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/11/2020 0.98 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 126.7 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 3 Hog Heaven Triple M (31-691) PoA30day (1-4-21) Page 1 of 1