HomeMy WebLinkAbout470001_Inspection_20201119 ('Division of Water Resources Biros KF Ii i 2q
Facility Number 4/7 - of 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: <S t ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: fi---/9--- Arrival Time: ?-"r'ri — Departure Time: i21'1 County: f`ikY Region: F 7D
Farm Name: j y (3 f'r- 4. "�I//J1 Owner Email:
Owner Name: U�`�Z �� f�(� Phone:
Mailing Address: .
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: J��i�Q� Integrator: .jy/ /j/
Certified Operator: j p �-�40 77f Certification Number: /er)?-—"! LI
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Layer Dairy Cow
Wean to Feeder Non-Layer Dairy Calf
—eeder to Finish 'yob 9;?9D Dairy Heifer
•Farrow to Wean Design Current Dry Cow
•Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other Other
Discharges and Stream Impacts
1.Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ N ❑ NA ❑ NE
2.Is there evidence of a past discharge from any part of the operation? ❑ Yes [ No ❑ NA ❑ NE
3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 2/4/2015 Continued
Facility Number: y7 - Q/ Date of Inspection:f//y
Waste Collection&Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes Er< ❑ NA ❑ NE
a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in): ` 9
Observed Freeboard(in): 3
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 12No ❑ NA ❑ NE
(i.e.,large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes Ia1 o ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7.Do any of the structures need maintenance or improvement? Ifrfes ❑ No ❑ NA ❑ NE
8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes E No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9.Does any part of the waste management system other than the waste structures require ❑ Yes El-"‹ ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [/]No ❑ NA ❑ NE
maintenance or improvement?
11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes E No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s): f02adea /94/,---- -e)
7
13. Soil Type(s): (..ai2a/0
14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE
15.Does the receiving crop and/or land application site need improvement? ❑ Yes -0 ❑ NA ❑ NE
16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes O ] o ❑ NA ❑ NE
acres determination?
17.Does the facility lack adequate acreage for land application? ❑ Yes lalC o ❑ NA ❑ NE
18.Is there a lack of properly operating waste application equipment? ❑ Yes [21' 10 ❑ NA ❑ NE
Required Records&Documents
19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes Er< ❑ NA ❑ NE
20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes - o ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑Lease Agreements ❑Other:
21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes 12'Ko ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall n Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1"Rainfall Inspections ❑Sludge Survey
22.Did the facility fail to install and maintain a rain gauge? ❑ Yes uNo ❑ NA ❑ NE
23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 0-11-6 ❑ NA ❑ NE
Page 2 of 3 2/4/2015 Continued
Facility Number: 1,// - fY f Date of Inspection: /i--/21,,A7M
24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ,.No ❑ NA ❑ NE
25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes 12r< ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ lo ❑ NA ❑ NE
Other Issues -
28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [ <o ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes []No ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes E'NO ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [. i To ❑ NA ❑ NE
33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes Q No ❑ NA ❑ NE
34.Does the facility require a follow-up visit by the same agency? ❑ Yes E No ❑ NA ❑ NE
Comments(refer to question#):Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of
facility to better explain situations(use additional pages as necessary).
t 1?fr t3`-‘_ fje3../ ev evc. vo w
Reviewer/Inspector Name: � � �'y— Phone: 9-p -ors3-1
Reviewer/Inspector Signature: Date: /`-7f� ,77
Page 3 of 3 2/4/2015