Loading...
HomeMy WebLinkAboutNCG500189_permit issuance_20201215Weaver, Charles From: Weaver, Charles Sent: Wednesday, January 6, 2021 11:01 AM To: 'lori.tollie@duke-energy.com' Cc: 'Winston, Cynthia C'; Cahoon, Steve; Dishmon, Joyce Martin Subject: Renewal of Duke Energy / Duke Progress NCG500000 Certificates of Coverage (CoCs) Attachments: NCG500000 2020 boiler plate.pdf, NCG500000 Technical Bulletin 2020.pdf, NCG500102_permit issuance_20201211.pdf, NCG500108_permit issuance_20201211.pdf, NCG500119_permit issuance_ 20201211.pdf; NCG500120_permit issuance_20201211.pdf, NCG500123_permit issuance_ 20201211.pdf; NCG500124_permit issuance_20201211.pdf, NCG500125_permit issuance_ 20201211.pdf; NCG500126_permit issuance_20201211.pdf, NCG500127_permit issuance_ 20201211.pdf; NCG500131-permit issuance_20201214.pdf, NCG500136_permit issuance_ 20201214.pdf; NCG500139_permit issuance_20201214.pdf, NCG500188_permit issuance_ 20201215.pdf; NCG500189_permit issuance_20201215.pdf, NCG500190_permit issuance_ 20201215.pdf; NCG500591_permit issuance_20201231.pdf, NCG500594_permit issuance_ 20201231.pdf Importance: High The new CoCs for the Duke Hydro plants are attached, as is a copy of the new General Permit. Please distribute these documents and begin using them immediately. Discard all previous versions of the General Permit. If you have any questions, simply reply to this message. Charles H. Weaver Environmental Specialist N.C. DEQ / Division of Water Resources 919-707-3616 charles.weaver(@ncdenr.gov (mailing address) 1617 Mail Service Center, Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Weaver, Charles From: Microsoft Outlook To: 'lori.tollie@duke-energy.com'; 'Winston, Cynthia C'; Cahoon, Steve; Dishmon, Joyce Martin Sent: Wednesday, January 6, 2021 11:01 AM Subject: Relayed: Renewal of Duke Energy / Duke Progress NCG500000 Certificates of Coverage (CoCs) Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: 'lori.tollie(&duke-energy.com' (lori.tollie(sduke-energy.com) 'Winston, Cynthia C' (Cynthia.Winston @duke-energy.corn) Cahoon, Steve (Steve. Cahoon @duke -energy. corn) Dishmon, Joyce Martin (Joyce. Dishmon(abduke-energy.corn) M Subject: Renewal of Duke Energy / Duke Progress NCG500000 Certificates of Coverage (CoCs) ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Lori Tollie Duke Energy Progress LLC 2500 Fairfax Rd Greensboro, NC 27407 Dear Permittee: NORTH CAROLINA Environmental Quality 12/15/2020 Subject: Transfer of General Permit NCG500000 Tillery Hydroelectric Station Certificate of Coverage NCG500189 Montgomery County The Division has renewed General Permit NCG500000. We hereby reissue Certificate of Coverage (CoC) NCG500189 under General Permit NCG500000. It is issued pursuant to the requirements of North Carolina General Statue 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated October 15, 2007 [or as subsequently amended]. If any parts, measurement frequencies or sampling requirements contained in this General Permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, the certificate of coverage shall be final and binding. Please take notice that this Certificate of Coverage is not transferable except after notice to the Division. The Division may require modification or revocation and reissuance of the certificate of coverage. Contact the Fayetteville Regional Office prior to any sale or transfer of the permitted facility. Regional Office staff will assist you in documenting the transfer of this CoC. This permit does not affect the legal requirements to obtain any other State, Federal, or Local governmental permit that may be required. If you have any questions concerning the requirements of the General Permit, please contact John Hennessy [john.hennessy@ncdenr.gov] or Sydney Carpenter [sydney. carpenter@ncdenr. gov] . Sincerely, for S. Daniel Smith, Director Division of Water Resources cc: NPDES file DE Q�� North Carolina Department of Environmental Quality I Division of Water Resources _ 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH C aROLINA Department f Environmental Quality /`� 919.707.9000 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES GENERAL PERMIT NCG500000 CERTIFICATE OF COVERAGE NCG500189 DISCHARGE OF NON -CONTACT COOLING WATER, COOLING TOWER AND BOILER BLOWDOWN, CONDENSATE, EXEMPT STORMWATER, COOLING WATERS ASSOCIATED WITH HYDROELECTRIC OPERATIONS, AND SIMILAR WASTEWATERS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Duke Energy Progress LLC is hereby authorized to discharge from a facility located at the Tillery Hydroelectric Station 179 Tillery Plant Rd Mount Gilead Montgomery County to receiving waters designated as directly to the PEE DEE RIVER, a class WS-V & B stream in subbasin 03-07-10 of the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, and III hereof. This certificate of coverage takes effect 12/15/2020. This Certificate of Coverage shall remain valid for the duration of the General Permit. Signed this day 12/15/2020 for S. Daniel Smith, Director Division of Water Resources By Authority of the Environmental Management Commission