Loading...
HomeMy WebLinkAbout290021_Compliance Evaluation Inspection_20201202Type of Visit: Compliance Inspection 0 Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: (Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: U Farm Name Owner Name: Mailing Address: Physical Address: Facility Contact: Arrival Time: us.id-ace! Departure Time: County: Region: &S LZ ( Owner Email: 1 hone: l� Cam' C� l ' ► / Title: Onsite Representative: l-t d 901U 4) Integrator: Certified Operator: Back-up Operator: Location of Farm: I r� Phone: nk -asl1 "7b O(1. Certification Number: Certification Number: Latitude: SD� Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes )!�No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes] No ❑ NA ❑ NE Page I of 3 511212020 Continued Facilitv Number: jDate of inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: !T V � Spillway?: Designed Freeboard (in): Observed Freeboard (in): �othe" 5. Are there any immediate thregrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) j`1 No ❑ NA ❑ NE 'l❑No ❑NA ❑NE Structure 6 ❑ Yes 4 No ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes A No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. A Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN N PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): �L 14. Do the receiving crops differ from those designated in the CAWMP? [—]Yes 0 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Pq No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No 00 NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes XNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 0 No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? 4i. [:]Yes )� No ❑ NA ❑ NE Waste Application Weekly Freeboard Waste Analysis Soil Analysis ® Weather Code LIN Rainfall 0 Stocking V) Crop Yield Monthly and 1" Rainfall Inspections 7� 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes � No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No MINA ❑ NE YN Page 2 of 3 511212020 Continued Facilit Number: - Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? Yes ❑ No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [:]No j� NA ❑ NE the appropriate box(es) below. ]k ❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes 0 No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes 4No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes] No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ( No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 7� 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [&No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes M No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Pq No ❑ NA ❑ NE �mpl-MCA, I ova 7 �� c � 2'D I Ca << bru h cm �i 'P ccx)-h n ve- J2 'f� of S � JI G� I CL4 ` V T 5; ` tz� 1 Q acA\Ck+1�_ �,Y (cf'e C, 0 �\1Ajkj (), wiIn�- Covty btj� Jec�vc ed f,_Cm C 0A j C()rr) . �'I JLUCI pre �/k&\ 'J , +L- 4v\z 39M""-�-A dkf4 1v`S V\CiGe 7"-\* n Sp70 WO-4 vJ) A-h Sb h foW pft� MA -e NY, V\ aAA-e r e ovex- C�Dp 4` G W q 4 �t1c�h �2'� p\c.►� A—b l r 6 tZA 1 4 a rt-Af} �— ,�r r«�1 n �, -� \�c�� % s c� Orcl r, 11151m 1%(26 U 1 � ?,6 a �2'2'la-o arcs 1; �n z. J c'G1 ck 6 1 3,91� 3-v.6 �-3� 3 S� . Reviewer/Inspector N Reviewer/Inspector S Phone.'-�1J)fi.� Date: 5/12/2020 Page 3 of 3