Loading...
HomeMy WebLinkAbout20210030 Ver 1_Meeting Request Review_20210105ID#* 20210030 Version* 1 Regional Office* Asheville Regional Office - (828) 296-4500 Reviewer List* Amy Annino Pre -Filing Meeting Request submitted 1/5/2021 Contact Name * Jon Swaim Contact Email Address* jon.swaim@mcgillassociates.com Project Name* Second Broad River Water Line Assistance with Repairs Project Owner* Town of Forest City (Barry Spurlin) Project County* Rutherford Owner Address: Street Address 132 Wilkie Street Address Line 2 aty State / Province / Region Forest City North Carolina Postal / Zip Code Country 28043 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Amy Annino Please give a brief project description below. The Town of Forest City has completed an emergency repair on a subsurface water line that was damaged during recent storm events. The proposed project area is located within and adjacent to the second Broad River along US-74 Business Route/East Main Street in the Town of Forest City. Please give a couple of dates you are available for a meeting. 1 /8/2021 1 /11 /2021 1 /15/2021 1 /18/2021 Please attach the documentation you would like to have the meeting about. Project draWngs.pdf 771.09KB LOCATION Map.pdf 302.42KB USGS MAP.pdf 3.09MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature [fly t7a1 W1_1 Submittal Date 1/5/2021 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No MICELLANEOUS CONSTRUCTION DETAILS SECOND BROAD RIVER WATER LINE REPAIR DOGWOOD SEWER LINE REPAIR TOWN OF FOREST CITY RUTHERFORD COUNTY, NORTH CAROLINA Shaping Communities Together SPAN _ I >1'-6" to r — — — — <4'-0" I r "LOK FAST" JOINT OR EQUAL DUCTILE IRON PIPE /-- PIER FOOTING —PIER CONCRETE PAD EXTENDS 1' fBEYOND PIER FOOTING (TYP) Q. ..�° ° 4 e. Q G ° e. . STRAP (SEE DETAIL THIS SHEET) ■ A DUCTILE IRON PIPE STRAP & ANCHORS 3/4" CHAMFER ON ALL (SEE DETAIL THIS SHEET) EXPOSED EDGES (TYP) `ol ° ° g to . #5 TIES 0 9" O.C. ° . d. CONCRETE PIER O ^' m 10.2 VARIES ° 1. ... 2 #6's 0 9" .. OI * ° ° dl n 10 O.C. PIER FOOTING CLEAN ROCK OR CONCRETE SURFACE °� °' A. I 4 Ql°. #6's 0 12" O.C.E.W. CONCRETE PAD EXTENDS 1° BEYOND BASE OF PIER (TYP) O I I° 4 l I IO Al ° I TYP." _.r. o• T_ 1"A7 BEDROCK SURFACE #5 DOWELS 0 1'-0" O.C. AROUND y `II_ 2'-6" DEEP CONCRETE PAD TO BE FOOTING PERIMETER. SET DOWELS CONSTRUCTED OF 3000 PSI CONCRETE IN 3" 0 x 2'-2" PREDRILLED HOLES IF BED ROCK NOT FOUND IN ROCK. EXTEND DOWELS 14" INTO PIER FOOTING AND ANCHOR WITH EPDXY GROUT SYSTEM. NOTES: 1. CONCRETE SHALL ATTAIN A COMPRESSIVE STRENGTH OF 3000 PSI WITHIN 28 DAYS AND SHALL BE AIR ENTRAINED. 2. ALL CONCRETE SHALL BE READY MIX CONCRETE MANUFACTURED AND DELIVERED IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM DESIGNATION C94. 3. SEE STRAP/ANCHOR DETAILS FOR ADDITIONAL INFORMATION. 4. CONCRETE PIER SHALL BE PAID AT UNIT PRICE PER BID SCHEDULE. CONCRETE PAD UNDER PIERS (IF REQUIRED) SHALL BE PAID AS MISCELLANEOUS CONCRETE UNIT PRICE PER BID SCHEDULE. S CONCRETE PIER - SMALL 20 UPDATED MARCH, 2017 NOT TO SCALE SECTION DATE PROJECT# SECOND BROAD RIVER FIGURE JULY, 2020 20.00313 WATER LINE 55Broad ille,NStreet OFFICE MANAGER DESIGNER TOWN OF FOREST CITY NOT TO SCALE MISCELLANEOUS w mc gill 828.252.057528801 M.CATHEY K.WEBB DETAILS 1 NC Firm License # C-0459 PROJECT MANAGER REVIEWER mcgillassociates.com K. WEBB RUTHERFORD COUNTY, NORTH CAROLINA NATIVE PLANT SEEDING MIX FOR WETLAND STREAM OR RIVERBANK STABILIZATION 1. NATIVE SEED MIX SHALL BE APPLIED AT A RATE OF 20 LDS./AC. AND INCLUDE THE FOLLOWNG SPECIES: 25% -BIG BLUESTEN (ANDROPOGON GERARDII) 25X - INDIAN GRASS (SORGHASIRUM NUTANS) 25X - LITTLE BLUESIEM (SCHIZACHYRIUM SCOPARIUM) 25X - SWTCHGRASS (PANICUM VIRGATUN) 2. ADDITIONALLY A TEMPORARY COVER/NURSE CROP MIX SHALL BE APPLIED AT A RATE OF 25 LBS./ACRE AS FOLLOWS: AUGUST THRU MAY - GREENRYE (SECALE CEREALS) MAY 1 THRU AUGUST - MILLET (PENNISETUN GLAUCUM) 3. LIVE STAKE SPECIES SHALL CONSIST OF THE FOLLOWNG: 25% - SILKY DOGWOOD (CORNUS AMOMUM) 25X - SILKY WILLOW (SAUX SERICEA) 25X - HAZEL ALDER (ALNUS SERRULATA) 25X - ELOERBERRY (SAMBUUS CANAOENSIS) 4, ANY SUBSTITUTIONS OR VARIATIONS FROM SPECIFICATIONS ABOVE SHALL BE APPROVED BY THE PROJECT ENGINEER. S. NO FERTILIZER SHALL BE USED WITHIN IV OF TOP OF STREAM OR RIVER BANK. 6. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 7. REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. S.REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS TEMPORARY SEEDING SPECIFICATION SEEDING MIXTURE: SPECIES RATE (lb/acre) RYE (grain) 120 SEEDING DATES: AUG 15 TO DEC 30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2000 Ib/ac GROUND AGRICULTURAL LIMESTONE AND 750 Ib ac 10-10-10 FERTILIZER. MULCH: APPLY 4O00Ib/ac STRAW. ANCHOR STRAW BY TACKING w/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK w/ BLADES SER NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: RE —FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE, RE —SEED, RE —FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. CUT/FILL SLOPES SEEDING SPECIFICATIONS - STEEPER THAN 3:1 SEEDING MIXTURE: SPECIES TALL FESCUE RATE,gb0/acre) SWITCHGRASS AND PARTRIDGE PEA MIX 30 NURSE PLANTS: BETWEEN MAY 1 AND AUG 15, ADD 10Ib/ac GERMAN MILLET OR 15 Ib/ac SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15. ADD 40 b ac RYE (GRAIN). IT MAY BE BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER. SEEDING DATES: BEST POSSIBLE AUG 25 — SEPT 15 AUG 20 — OCT 25 FEB 15 — MAR 20 FEB 1 — APRIL 15 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 4000 Ib/ac GROUND AGRICULTURAL LIMESTONE AND 750 Ib/ac 10-10-10 FERTILIZER. MULCH: APPLY 4000 Ib/ac GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL, ANCHOR MULCH BY TACKING w/ ASPHALT, ROVING OR NETTING, NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE: MOW NO MORE THAN ONCE A YEAR, RE —FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RE —SEED, RE —FERTILIZE, RE —MULCH DAMAGED AREAS IMMEDIATELY. DITCH/OPEN AREA PERMANENT SEEDING SPECIFICATION SEEDING MIXTURE: SPECIES RATE (Ib ac) TALL FESCUE 250 ( Ib/1000 sq ft) NURSE PLANTS: BETWEEN MAY 1 AND AU 15, ADD 10 Ib/ac GERMAN MILLET OR 15 Ib/ac SUDANGRASS PRIOR TO MAY 1 OR AFTER AUG 15, ADD 40 Ib/ac RYE (GRAIN. SOIL AMENDMENTS: APPLY LIME AND FERTILIZE ACCORDING TO SOIL TEST, OR APPLY 4000 Ib/ac GROUND AGRICULTURAL LIMESTONE AND 750 Ib/ac 10-10-10 FERTILIZER. MULCH: USE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THE HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4000 Ib/ac GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPE WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE: INSPECT AND REPAIR MULCH FREQUENTLY. RE —FERTILIZE IN LATE WINTER ACCORDING TO SOIL TESTS OR APPLY 150 Ib/ac 10-10-10 FERTILIZER (3 Ib/1000 sq ft). MOW REGULARLY TO A HEIGHT OF 2" TO 4" NORTH CAROLINA LAND QUALITY SECTION EROSION CONTROL NOTES GENERAL- ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ), DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), LAND QUALITY SECTION. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. 1. PRIOR TO BEGINNING WORK ON THE PROJECT THE CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" FROM THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ). DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), DIVISION OF LAND QUALITY, OR THE LOCAL AUTHORIZED PROGRAM. THE APPROVAL NOTICE MUST BE AVAILABLE ON -SITE DURING ALL GRADING AND CONSTRUCTION ACTIVITIES. 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. NOTE: ALL UTILITY INSTALLATION WITHIN 25' OF A RIVER OR STREAM BANK SHALL BE INSTALLED PER STREAM PROTECTION DURING EXCAVATION DETAIL. NATIVE SEEDING AND MULCHING SHALL BE COMPLETED DAILY IN AREAS NOTED AS STREAM PROTECTION AREAS. SILT FENCE IN THESE AREAS SHALL NOT BE INSTALLED CLOSER THAN 5' FROM CREEK BANK UNLESS FIELD CONDITIONS PREVENT SUFFICIENT CLEARANCE. ALL SILT FENCES SHALL BE INSPECTED AND CLEANED AS NEEDED AFTER EACH RAIN. 3. NO WORK SHALL BE PERFORMED IN STREAM FROM OCTOBER 15 TO APRIL 15 (TO ACCOMMODATE COE AND DWQ RECOMMENDATIONS CONCERNING WORK IN TROUT WATERS.) 4. CONTRACTOR IS TO PLACE PERMANENT STAKES MARKING CLEARLY THE 25' BUFFER FOR STREAMS WHERE SHOWN ON THE PLANS AND THE MARKERS ARE TO BE VISIBLE AT ALL TIMES DURING CONSTRUCTION. 5. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. 6. CONSTRUCTION SHALL BE LIMITED TO 2000' OF CONTIGUOUS ROAD CORRIDOR UNTIL ALL CUTS, FILLS, AND DITCHES ARE STABILIZED FOR THAT 2000' SECTION. UPON STABILIZATION OF THAT SECTION ANOTHER 2000' SECTION CAN BE CONSTRUCTED AND STABILIZED. 7, ALL STREAM CROSSINGS AND PERENNIAL STREAMS WILL BE ALIGNED WITH THE NATURAL STREAM PATTERNS ABOVE AND BELOW THE PROPOSED ROAD. ARCH CULVERTS WILL BE USED AND FOOTERS WILL BE CONSTRUCTED IN UNDISTURBED BANKS AWAY FROM THE STREAM FLOW. 8, PROCEED WITH GRADING, CLEARING AND GRUBBING. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS ALLOWED UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. 9. SEED AND PLACE EROSION CONTROL MATTING ON ALL UPLAND CUT AND FILL SLOPES THAT ARE NOT ROCK IMMEDIATELY UPON COMPLETION OF SLOPE STABILIZATION. 10. ALL TEMPORARY STREAM AND CREEK CROSSINGS FOR EQUIPMENT DURING CONSTRUCTION SHALL BE MADE USING TEMPORARY BRIDGES. NO STREAM BANK OR STREAM BED DISTURBANCE SHALL BE ALLOWED FOR EQUIPMENT CROSSINGS. 11. SEED AND MULCH DENUDED AREA WITHIN TIME FRAME SPECIFIED (SEE TABLE). SEED AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. STRAW MULCH SHALL BE TACKED WITH TACKING AGENT APPLIED BY HYDROSEEDER. LIME 4,000 LBS FERTILIZER (10-10-10) 1,000 LBS KY-31 FESCUE (PDA PRATENSIS) 100 LBS (MOWED AND MAINTAINED AREAS ONLY) OR CREEPING RED FESCUE 100 LBS (NATURAL AREAS AND STREAMBANKS) STRAW MULCH 60-80 BALES FOR SUMMER SEEDING ADD TO THE ABOVE: GERMAN MILLET (SETARIA ITALICA) 40 LBS SMALL -STEMMED SUDAN GRASS (SORGHUM BICOLOR) 50 LBS FOR WINTER SEEDING ADD TO THE ABOVE: RYE GRAIN (SECALE CEREALE) 120 LBS IF HYDROSEEDING, WOOD CELLULOSE MAY BE USED IN ADDITION TO STRAW MULCH AT THE RATE OF 1,000 LBS PER ACRE. ALL SEEDING SHALL BE MAINTAINED, WATERED ETC.., UNTIL A PERMANENT VEGETATIVE GROUND COVER IS ESTABLISHED OVER ALL DISTURBED AREAS. FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: PURGE LIVE SEED SWITCHGRASS 4 LBS BROWNTOP MILLET OR PEARL MILLET (PENNISETUM GLAUCUM) 8 LBS GRAIN SORGHUM (SORGHUM BICOLOR (L.) MOENCH SSP. BICOLOR) 2 LBS ALL SLOPES 2:1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL MATTING. NATIVE SEEDING: THE CORRECT SEEDBED pH IS 5.5 TO 6.5. APPLY ZERO NITROGEN AT PLANTING. INCORPORATE SOIL AMENDMENTS INTO TOPSOIL/ROOT ZONE BEFORE SEEDING. FIRM SEEDBED BEFORE SEEDING (TRAVEL WITH DOZER CLEATS). SEEDING DEPTH FOR ALL NATIVE SSP. EXCEPT E.GAMAGRASS (TRIPSACUM DACTYLOIDES) NEED TO BE 1/4" - 1/2". GREATER DEPTHS CAUSE HIGH SEED MORTALITY. SPECIALIZED SEEDING IMPLEMENTS ARE REQUIRED. SEED MIXES AND RATES TO MATCH SEEDER USED. A NO -TILL, DROP SEEDER OR BROADCASTER WITH PRECISION METERING TO CONTROL SMALL SEED FLOW AND PICKER WHEEL AGITATORS TO HANDLE FLUFFY SEED ARE BEST SUITED FOR NATIVE SEED. FULLY BIODEGRADABLE COIR MATTING NORMAL WATER SURFACE ELEVATION TOP OF SLOPE SECTION VIEW ANGLE CUT END NOTES: 1. LIVE STAKES SHALL BE SILKY DOGWOOD (CORNUS AMOMUM), BLACK WILLOW (SALIX NIGRA), SILKY WILLOW (SALIX SERICEA), ELDERBERRY (SAMBUCUS CANADENSIS), BUTTONBUSH (CEPHALANTHUS OCCIDENTALIS), OR OTHER APPROVED SPECIES. 2. LIVE STAKES SHALL BE INSTALLED IN BANK ON 3' CENTERS IN DISTURBED AREAS OF CREEK BANK WITH DEAD -BLOW HAMMER. 4/5 OF STAKE SHALL BE IN THE GROUND. 3. BUDS SHALL BE ORIENTED UPWARDS. 4. CONTRACTOR SHALL CUT EXPOSED END OF LIVE STAKE AFTER INSTALLATION IF DAMAGED DURING INSTALLATION. TEC 5. LIVE STAKES SHALL BE IN ADDITION TO SEEDING AND MATTING REQUIREMENTS. 4 BIOENGINEERED STREAMBANK STABILIZATION UPDATED MARCH, 2017 NOT TO SCALE COIR MATTING --\ BANK OR BENCH BASE FLOW -_ WATER ELEVATION - III -I I I-III-III=I I (T ECO-STAKE® (TYP.) ELEVATION • TRENCH TOP OF MATTING TO A DEPTH OF AT LEAST 12", STAKE OR STAPLE IN PLACE, & BACKFILL TO DESIGN GRADE • MINIMUM 24" ECO-STAKES® INSTALLED ALONG TOE OF MATTING (INTERCEPT BETWEEN WATER SURFACE AND BANK) • 0.75" X 0.75" OPENINGS 460 G/M WEIGHT 24" ECO-STAKE® ( TYP. ) 24" ECO-STAKE ( TYP. ) COIR MATTING DETAIL. NOT TO SCALE ECO-STAKE® • MINIMUM 2' CENTERS ALONG BOTTOM • MINIMUM 1' OVERLAP AT JOINING SECTIONS OF COIR MATTING • 12" ECO-STAKES® INSTALLED IN BANK FLUSH WITH COIR MATTING ABOVE BOTTOM ROW OF 24" ECO-STAKES® • ECO-STAKES® SPACED AT MAXIMUM 3' CENTERS (APPROX.) BOTH DIRECTIONS _I L y Cl. V c 5� u Clinchfield Dr 0 ti In Windover Dr � m t, Alpine Dr a a 0 US -74.SR Project Area TOWN OF FOREST CITY WATER LINE REPAIR RUTHERFORD COUNTY, NORTH CAROLINA US kighlvay 74 Busines•_ 200 0 100 200 400 GRAPHIC SCALE DIVISION VALUE = 200 FEET FIGURE LOCATION MAP 2 of goo �� l i • `J• j • ''` •' � I!' f �•I� t \`� � � \• • •• i l; %� Cft� �Q • t • \�i t �• j 1 t, \,I 1 ti % 14 ` • • ! ;' � • to � � �' � � � `� ♦' r - a �`_. ■ • • •�,� • I J � +. L • , w • • • y �, `\�.�—mil L�' )r+�` - — _. - L1NG7t Project Area livi 1 ale r s L ; /J t r y •• i �`~~� � I 44 e age _ } • 2000 0 500 1000 2000 GRAPHIC SCALE DIVISION VALUE = 200 FEET DATE PROJECT# 7/17/20 20.00313 TOWN OF FOREST CITY FIGURE 1013 State Farm Road OFFICE MANAGER DESIGNERMCg'll BWATER LINE REPAIR USGS MAP oone, 828. 6.1NC 920 28607 MC AL NC Firm License#C-0459 PROJECTMANAGER REVIEWER RUTHERFORD COUNTY, NORTH CAROLINA mcgillassociates.com KW JS