HomeMy WebLinkAboutWQ0042152_Application Attachment_20210105QWR
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: The Isaacs Group
Project Name for which flow is being requested: Greenway Business Center Townhomes
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek
b. WWTP Facility Permit #: NC0024970, NC0024945, NCO024937
All flows are in MGD
c. WWTP facility's permitted flow 99.00
d. Estimated obligated flow not yet tributary to the WWTP 10.215
e. WWTP facility's actual avg. flow 73.817
f. Total flow for this specific request 0.02527
g. Total actual and obligated flows to the facility 84.032
h. Percent of permitted flow used 84.9%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C) (E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm Daily Flow**
Current
Tributary
Flow Plus
(Name or
Permit
Capacity, * (Firm / pf),
Avg. Daily
Daily Flow,
Obligated Available
Number)
No.
MGD MGD
Flow, MGD
MGD
Flow Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): ROZZelles Ferry Road
Downstream Permit Number: Unknown
Page 1 of 6
FTSE 10-18
III. Certification Statement:
I Keri Cantrell
certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any
capacity related sanitary sewer overflows or overburden any downstream pump station en route to the
receiving treatment plant under normal circumstances, given the implementation of the planned
improvements identified in the planning assessment where applicable. This analysis has been performed
in accordance with local established policies and procedures using the best available data. This
certification applies to those items listed above in Sections I and II plus all attached planning assessment
addendums for which I am the responsible party. Signature of this form certifies that the receiving
collection system or treatment works has adequate capacity to transport and treat the proposed new
wastewater.
Digitally signed by Keri B Cantrell
�.� Date: 2020.12.22 15:01:19-05'00' 1 2/22/2020
Adobe Acrobat version: 2018.011.20040
Signing Official Signature
Chief Engineer
Title of Signing Official
Date
Page 2 of 6
FTSE 10-18