Loading...
HomeMy WebLinkAboutWQ0042152_Application Attachment_20210105QWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: The Isaacs Group Project Name for which flow is being requested: Greenway Business Center Townhomes More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NCO024937 All flows are in MGD c. WWTP facility's permitted flow 99.00 d. Estimated obligated flow not yet tributary to the WWTP 10.215 e. WWTP facility's actual avg. flow 73.817 f. Total flow for this specific request 0.02527 g. Total actual and obligated flows to the facility 84.032 h. Percent of permitted flow used 84.9% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): ROZZelles Ferry Road Downstream Permit Number: Unknown Page 1 of 6 FTSE 10-18 III. Certification Statement: I Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Digitally signed by Keri B Cantrell �.� Date: 2020.12.22 15:01:19-05'00' 1 2/22/2020 Adobe Acrobat version: 2018.011.20040 Signing Official Signature Chief Engineer Title of Signing Official Date Page 2 of 6 FTSE 10-18