Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310776_30 day poa_20210105
PLAN OF ACTION{Poal} FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 31-776 Facility Name: Halls Marsh Certified Operator Name: County: Duplin Leslie Whiffed Operator Number: AWA166©2 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations_ Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Leslie Whiffed Facility Owner/Manager (print) Phone: 919-344-2449 Date Facility Owner/Manager (signature 1/412020 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 765.6 Ib PAN 2. Structure ID: line m = Ib PAN 3. Structure ID: line rn = lb PAN 4. Structure ID: line m = Ib PAN 5. Structure ID: line m = Ib PAN 6. Structure ID: line rn = Ib PAN n. lines 1 +2+3+4+5+6= 765.6 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRinn nn NOT I IST FIFI nS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o_ tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u, application window' new 7 Wheat 4.05 50.00 202.5 Sept -April new 8 Wheat 5.05 50.00 252.5 Sept -April new 9 Wheat 2.25 40.00 90.0 Sept -April new 10 Wheat 2.91 40.00 116.4 Sept -April 11 Wheat 5.05 40.00 202.0 Sept -April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 863.4 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 765.6 Ib. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 863.4 lb. PAN y. Overall PAN balance (w - x) = -98 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. if new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Wheat has not been planted but grower expects to be able to plant by next week, if weather permits. PoA (30 Day) 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): I Lagoon 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 89300 ft2 e. line c112 x line d x 7.48 gallons/W 111327 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1210582 ft3 h. current herd # 3672 certified herd #1 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 12/11 /2020 m. ((lines e + k)11000) x line I = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft3 0 fe 52091.7 W 215860 gallons 2.34 Ibs11000 gal. 765.6 lbs. PAN PoA (30 Day) 2/21100