HomeMy WebLinkAbout20201825 Ver 1_Shoreline Stabilization_20210105Submission Form
Pre -Filing Meeting Information
Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able
to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance
with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall
request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5)
all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying
authority at least 30 days prior to submitting the certification request. Click here to read more information on when this
form is needed prior to application submission or here to viewthe form.
Attach documentation of Pre -Filing Meeting Request here:
DWR Pre -Filing Meeting Request Form.pdf 51.44KB
Pre -fling Meeting or Request Date 12/2/2020
ID# 20201825 Version 1
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email * Barnesbo@twc.com
Rease provide an email address for payrrent and requests for pure information here.
Owner Information:
Name: * Bobby Barnes
Email: * Barnesbo@twc.com
Phone Number:* (704)813-9451
(xxx)xxx-xxxx
Mailing Address:* Street Address
6741 Love Point Road
Address Line 2
City
State / Frovince / Region
Denver
NC
Fbstal / Zip Code
Country
28037-9758
US
Is there an agent working on the f Yes
project?* r No
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name:* Shoreline
If your project has a formal name please use this. If your project does not have a formal name, please identify your project by
the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any
other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect
to local landmarks such as towns, rivers, and roads.
r Upload File
r Lookup address
Property Address Lookup:*
Latitude:* 35.563234
Street Address
6741 Love Point Road
Address Line 2
City
Denver
F bstal / Zip Code
28037-9758
State / Province / R-gion
NC
Country
US
Longitude:*-81.028846
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging
below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the
diagram under section 12.normal pool lake level/normal water level*
8550A02F-4A72-461D-AO71-
3.95MB
6D9A22827331. jpeg
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a
yard stick, shovel handle, etc.)*
8BF8F59C-DDD7-4532-A7A1-
5.49MB
7B3EBAEB3779. jpeg
EA3FB3BC-D8A5-4667-AAOF-
5.15MB
831D2OE6E5A5.jpeg
4. Location of the property (where work is to be conducted)
Nearest Town:* Denver
County:* Catawba
Lake/ river/ ocean adjacent to Norman
property:
Subdivisions name or site address:* N/A
Include phasellot nunber
Directions to site:*
From the Stacys restaurant head N on 16, turn right on Grassy Creek Rd,
after 1.4 miles turn right on Love point Rd., arrive at 6741 Love Point Rd.
on the right.
Rease include road narres and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application:*
It is bare with some grass.
Residential, undeveloped, etc.
6. Property Size .97
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary):
The wall that is there is probably 30 plus years old and has fallen over and
rotted away. I have not had the money to do it until now. I will be
removing the wood wall completely. The bank will be cut to proper slope
2:1 or 3:1 if possible and fabric will be laid on bank and rip rap will cover
the bank.
8. How will the work be done? * I7 From Land
r From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level:*
(including all clearing, backfill, excavation, rip rap, retaining walls, etc.)
1000
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet
land -ward:*
(including all clearing, backfill, excavation, rip rap, retaining walls, etc.)
1200
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet
landward to be impacted:*
(number of trees, for instance)
It is grassy with a lot of bare spots. A few trees on the right side. Has a
pier in the middle.
Sketch: 8550A02F-4A72-461D-A071-
3.95MB
6D9A22827331. jpeg
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
$240.00 for impacts to lake (below normal water level) of less than 1 acre
$570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act');
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* Bobby Barnes
Signature:
Initial Review
Is this accepted into the review
process?*
Project Number:* 20201825
Select Reviewer:*
Select Reviewing Office
Has payment been received?*
What amount is owed?*
rYes allo
Version:* 1
Alan Johnsomeads\adjohnsonl
Mooresville Regional Office - (704) 663-1699
r No Payment Needed
r Fee Received
r Need Fee - send electronic notification
r $240.00
f $570.00
`p
C
O
2
3 ft, below fin/ pond water Irvei 4 ft. above full pond water level 2 ft. additional clearing
'if necessary
12. Please approximately sketch the following information on this plan and provide dimensions for
each item;
V
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
Lake
(At Full Pond/ Normal Water level)
Lake
(Al FUN Wn NOMMI NNter tme41
Existing Dock
30 it . 7 tt
Flop�
f
Jom
JIV It
r'
:." ,
.fLs
It
ad
^. — —f— % � - Il� ..�: _ �. ;4,. ' � `i 'r�' 1-i ! z�• '.. `' `.• • r � ..:.y.. �'./ S!F ^ I. / � , _ Ybq,.�F .q r iib\ i'..... / `'' � i �' v
�A
IV I
y
1 �_ /• Si ���r
� J
7
s / .-
� .1•J''-.+� r% '� � �" i�I /''/ a,:.. �it 1, `" '!•n� �.�- / s i % ' Y4_� - �y - .:�
• '�•-�_.I � ���'� �' � •'}�. � • r� -- /�� � � .r �' ��..:/'� /f✓��' �. ova} b 'i�� . � � E
SIP.- %
r r.. yIiV
f' � 11``11 1�� t�.- _ � �,�,. `, � • 11• s Sit ,�fi �r,(�' <. r / r� ..� L'i,n
PI
-
.
FIdOt'�• 'j1M r r•' �1 �f- , r., �. `� :
'*Z - 1:r s!` �.,` . — 1• .. { rid i.> 'tc IIE `�' - W -�^ '. ` / \\�
.10
IV
Clio
AI XL
VIP
i^
•
w,did;� ie �•,� m / wr //
a ,• A ./- , r 7 R �F foot
w
V.
VA I
VV
it
ar
• jar
r�
y . +�835 �- yea^ '1�-l�'_.k'' �`�_ ` '� Jtr• .V.. J/ �.. :.. `
b
AM
r ,
jjj r J. jgw4bVI04 `;V do
p Via
b - , jl y���.. // �f1 , � � 9����� !� •^,�Y �/ b \.e�4q�' � 1��' . f �6ik�0 �. a, ,
AW
of
J _may' �' ' :i . ,� �Iy �bGla `i,�► �� '� �`�� v •� _ �� f
-/. �`. _. * _�.J- S/ l�✓siS�'Si� 1 . a is �\Jr 1 I•��./. �t1_•. \ .i`
+r•-�'� tea- _ _ \
10
v�
� At
,rA"�� ^i'�:C' tr; `.•1 �
v��
f
rrt `
'�1l I � < ,�%r i � � i � � _ , ,r*l.. fir. ` .ThT'.� ♦ � � A s� �� ny
!.„+ i +�.. ��y i'* � i,. Ar ,�,� :.,� 1 1 _ __ / 1 �rs?r �'r"= �' +\'�` - '� �.r'P�•�i
't r ; .•ice„ sY� >
'� _ ' •� a-�."�r , -� " -�� -.y ma's
✓, �' � � / , �'>r .. � r'- it �� ("�'
µ
r
- f `\
r
If
a
Ao t
..,
IT;"*� `f� •'�j/; < •jar. �., {��11 �.rr 4
AY
•
_ R _
i
7 S
W
-
/ .r .y • ?All
I fi r , : W:A4-
.yf41
e
`p
C
O
2
3 ft, below fin/ pond water Irvei 4 ft. above full pond water level 2 ft. additional clearing
'if necessary
12. Please approximately sketch the following information on this plan and provide dimensions for
each item;
V
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
Lake
(At Full Pond/ Normal Water level)
Lake
(Al FUN Wn NOMMI NNter tme41
Existing Dock
30 it . 7 tt
Flop�
DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
Please give a couple of dates you are available for a meeting.
20201825 1
Mooresville Regional Office - (704) 663-1699
Alan Johnson
Pre-Filing Me eting Reque st submitte d 11/30/2020
Bobby Barnes
Barnesbo@twc.com
Shoreline
Bobby Barnes
Lincoln
City
Denver
State / Province / Region
North Carolina
Postal / Zip Code
28037
Country
United States
Street Address
6741 Love Point Rd.
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
No
My sea wall has eroded and fallen into the lake. I want to remove it
and have rip rap added in place of the existing wall. The bank will be
cut to a slope so that the rock will stay on the bank.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
12/2/2020
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
11/30/2020