Loading...
HomeMy WebLinkAbout310124_30 day poa_20210104PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-124 County: Duplin Facility Name: J&R Farm Certified Operator Name: Jason Cavenaugh Operator Number: AWA 18735 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lag 1 Lag 2 N N 14 16 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Jason Cavenaugh Phone Facility Owner/Manager (print) SQ n �Q V�t1C�_Date: Facility Owner/Manager (signature) 910-289-7659 2/27/2019 kX12 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.I24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 860.7 lb PAN 2. Structure ID: Lag 2 line m = 837.1 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m lb PAN n.lines 1+2+3+4+5+6= 1697.8lbPAN III, TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS o. tract # p. field # 1 2 sub3 TO WHICH PAN q. crop Small Grain Small Grain Small Grain UANNU I t r- r. acres 35.47 13.88 11.05 ArrL-izu UUM114v 1 r,1,3 4u s. remaining IRR- t_ TOTAL PAN 2 PAN balance BALANCE FOR (lb/acre) FIELD (Ibs.) column r x s 27.00 957.7 22.00 305.4 50.00 552.5 U � u. application window' Sept -April Sept -April Sept -April 'State current crop ending application date or next crop applicauon oeglnning uaie 1U1 aVauauic receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1815.6 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section A) = 1697.8 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 1815.6 lb. PAN y. Overall PAN balance (w - x) _ -118 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. Bermuda yeilds have been increased because producer will be cutting for hay. PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PER10D 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 1 2_ Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallonslft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 14.0 inches 19.5 inches 5.5 inches 67375 fl? 230984 gallons 1 180 days g. volume of waste produced according to structural design F 80705 ft3 h. current herd # 2448 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/1/2020 m. ((lines e + k)I1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 53803 ft3 -7`0ft3 39302 1 ft3 116071 gallons 2.48 lbs11000 gal. 860.7 lbs. PAN PoA (30 Day) 2121I00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): Lag 2 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design 16.0 inches 19.0 inches 3.0 inches 9fi100 fe 179707 gallons 180 days 121058 ft3 h. current herd # 3fi72 certified herd #V 3672 actual waste produced = current herd # x line g = 121058 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 9/1/2020 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 01ft3 56058 ft3 220805 gallons 2.09 Ibs11000 gal. 837.1 lbs. PAN PoA (30 Day) 2/21100