Loading...
HomeMy WebLinkAbout820094_Plan of Action (POA)_20200612 s a -cr PLAN OF ACTION.(PoA).FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY(30) DAY DRAW DOWN PERIOD 4I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE KlYvei 4)(4-41-)�e 1. Structure Name/Identifier(ID): poi cmoo, N; 11 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 10 inches b. designed 25 yr./24 hr. storm & structural freeboard ( ci inches c. line b - line a (inches in red zone) = 9 inches d. top of dike surface area according to design . ,AU0,.37 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = _1 i1492 I aNgallons • 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design (g 0 days g. volume of waste produced according to structural design- L13 6 PV 1. ft3 h. actual waste produced = current herd # x line g = t nI ft3 certified herd# i, volume of wash water according to structural design /3 6" " ft3 j. excess rainfall over evaporation according to,design OC,r pc,0 ft3 k. (lines h + i +i) x 7.48 x 30 days = S 11 ) gallons line f 4. Total PAN to be land applied during,draw down period. -- I. current waste analysis dated //41:-, L. lb/1000 gal. m. (lines e + k) x line I = 1 /3(9 lb PAN (( i1000 [cant' Y\tA,t, -to f 2t �v C *Cf iv ,Situ/ rv'ti e REPEAT SECTION/FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED.WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA(30 Day) 2/21/00 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY(30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): Po/k .kve. ki ;1 t i i oaiit / 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker I a. inches b. designed 25 yr./24 hr. storm & structural freeboard I `7 inches c. line b - line a (inches in red zone) = 7 inches d. top of dike surface area according to design I53, I30 ft2 (area at below structural freeboard elevation) e. line c x tine d x 7.48dallons = / i'5-I 13 )-gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according.to structural design I dO days g. volume of waste produced according to structural design ke 3!I 3- ft3 h. actual waste produced = current herd # x line g = 0} ft3 certified herd # i. volume of wash water according to structural design , 0 ft3 j. excess rainfall over evaporation according to design t1 7F `7 ft3 k. (lines h + i +i) x 7.48.x 30 days = f/l i S3'-(, gallons line f i s-c) 4. Total PAN to be land applied during draw down period I. current waste analysis-dated Ce t 1?.,J O C).11 lb/1000 gal. m. (lines e + k) x line I = 13 ci.0 lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN,STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA(30 Day) 2/21/00 1 • 1. structure ID: ,Sc),,,,, line m = /aaGp lb PAN , 2. structure ID: F i.Lc,✓ line m = jc . lb'PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines 1 + 2+ 3 + 4 + 5 + 6 = } .. . lb PAN. , Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract# p. field# q. crop r. acres s. remaining t.TOTAL PAN u. IRR-2 PAN BALANCE application balance FOR FIELD window' (lb/acre) (lbs.) column r x s t,5-4,-r L. S 3 f/5`4'1 3 8 if Li R,® D kv /q ,l2x, 11 ct.-7 4 214 () 13o 6,6-t W.30f2,� . (15eet Go 13/4- /N f G9 j trtIt%, tv //zo Li2.N3 r 7 1314 a,, Soo rnc,r, l0/3/14.v li6ce8 S 13/4 - a7,5 SceD 10131/o , 'State current crop ending application date or next crop application beginning date for available receiving crops during 30.day drawn down period v. Total PAN available for all fields (sum of column t) = (c)11 g 5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA(30 Day) 2/21/00 2 w. Total PAN to be land applied (line n from section II) = (d.73 lb. PAN x. Crop's remaining PAN balance (line v from section III) _ 6,4-481i lb. PAN y. Overall PAN balance (w -x) = So\/ lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA(30 Day) 2/21/00 3