Loading...
HomeMy WebLinkAbout20201861 Ver 1_Shoreline Stabilization_20210105Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: Pre -Submittal Meeting Request Form.pdf 417.82KB Pre -fling Meeting or Request Date 12/2/2020 ID# 20201861 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * bryboyer34@gmail.com Rease provide an email address for payrrent and requests for pure information here. Owner Information: Name: * Nathan B. Boyer Email: * bryboyer34@gmail.com Phone Number:* (980)397-5941 (xxx)xxx-xxxx Mailing Address:* Street Address 18353 John Connor Road Address Line 2 City State / Frovince / Region Cornelius NC Fbstal / Zip Code Country 28031-7771 US Is there an agent working on the project? * Agent/Consultant Information ................................................................................................................. Name: Company Affiliation:* Email: Phone Number:* Mailing Address:* F Yes f^ No Janice Estep CBC Stone & Recycling, LLC info@cbcstoneandrecychng.com (704)660-5111 (XXX)XXX-XXXX Address 638 Oakridge Farm Hwy Address Line 2 City Mooresville Fbstal / Zip Code 28115 Asigned and dated copyof the Agent Authorization letter:* Auth. Form.pdf 206.67KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Boyer Dredge State / Province / Fbgion NC Country United States If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed acti\ity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File r Lookup address Upload Map: Survey.pdf Vicinity Maps.pdf Directions.pdf Latitude:* 35.463751 426.51KB 1.84MB 270.92KB Longitude:*-80.925807 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site Plan.pdf 329.02KB Buffer Form.pdf 363.96KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Dredge Area Pic s.pdf 1.22MB Permission Letter.pdf 122.04KB 4. Location of the property (where work is to be conducted) Nearest Town:* Cornelius County:* Mecklenburg Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* 18353 John Connor Rd. Cornelius, NC 28031 PID # 00184129 Include phase/lot nurrber Directions to site:* 610 E Center Ave Mooresville, NC 28115 Take Evergreen St to E Center Ave 32s(0.1mi) Head east toward Evergreen St 108 ft Turn right onto Evergreen St 417 ft Take S Main St, NC-115 S, Langtree Rd, I-77 S/US-21 S, ... and Jetton Rd to John Connor Rd in Cornelius 22 min (11.8 mi) Turn right onto E Center Ave 0.5 mi Turn left onto S Church St 0.5 mi Turn right onto College St 0.1 mi Turn left onto S Main St 1.2 mi Continue onto NC-115 S 2.1 mi Turn right onto Langtree Rd 1.1 mi Use the left 2 lanes to turn left to merge onto I-77 S/US-21 S 3.1 mi Take exit 28 for US-21 S toward Catawba Ave/Lake Norman/Cornelius 0.2 mi Keep right at the fork, follow signs for Lake Norman and merge onto W Catawba Ave 1.1 mi Turn right onto Jetton Rd 2.0 mi Continue on John Connor Rd to your destination 2 min (0.7 mi) Turn left onto John Connor Rd 0.6 mi Turn right 479 ft Keep right 105 ft 18353 John Connor Rd Cornelius, NC 28031 Rease include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residential Residential, undeveloped, etc. 6. Property Size 0.35 acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Dredge area for new dock. Dredge by barge, haul dredge material off by land. 8. How will the work be done?* V From Land rJ From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 222.22 cubic yards below square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0' above square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) Grass buffer, no trees removed, no disturbance to buffer. Dredge by barge, haul material off by land using neighbor's property with neighbor's permission. Sketch: Dredge Apphcation.pdf 4.27M13 Dredge Spoils Info.pdf 2.54MB Sketches.pdf 1.28M13 Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): 0 $240.00 for impacts to lake (below normal water level) of less than 1 acre 0 $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Janice Estep Signature: Initial Review Is this accepted into the review process?* Project Number:* 20201861 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. PLAN NO. PARCEL ID: jX`7 Sq l - 9 STREET ADDRESS: S3 3 .,)Qhn_Conndv-` . C rV1L)mac. a 03 Please print: ;-� Property Owner: 1\LGk:01C %1 k 1•SC�l.ler Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize of 012C SA'dne � eQLtCI i nQ -} LC_ (Contractor J Agent) (Name of consulting-frm '-j--T to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and a[l standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: R 8b - 3 q" i- 5gi L4[ We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Au oriz Signaitureo Authorized Signature Date: I a l�� Ao Date: S��O� i� � � + ry (n sn Taft oO w — � � Deed Book 12559 Page 268 S 4����r7ryknnga�NJ�`IJ O �'' a [try � I �� a � �. cm n�m �'� 1150� � mg vti�1 p. � •� � a p, y ��� f 4 � � qp QZ! 21pNNfl� Nxflt' p 7 4 a FL o +a ra i i N 6 1 c� 1 0 LA u { i Q ° F, 0 m � 11 � TA 13 2,' V m $ a E EpRai------E,-: - ZE r-C �t.T, NifixxrnywVa�,Se Vi Fyn �ggn,-G .Z vi tnwxxm eNs m n, .gym{mfmtn srtm NOO Pr, Gbiw Yi+r'� .y.+QytAS oo»,stirea114i�3�3m r 1 a �a 1 4 } p py 1 x ty -i57 ZR d �D i m 1 a o rna mn a' U.ro 1 Nil _ p b l/1 i O & Y } 61 g n O CP tT m p- V) 013 CL `4 7K � d a sy_ . 0 o n co �2 0 maa 9 O to S' o - CO- neat]"' OQ zsm ED ID �� a� 'D aPO°'o$ v 4 j fmA 5° !ub`.Zi .09 (�j, # bs sosiu°� uq°r W, W. L'i m m :7- Q o m o m FAO � o O m m y O a m z a o m � � N n m m c @ — CD 8 < " ur o_ m v o S N N N � N a flf --�_ � `• ro (D Q m � , K h a � Q > M1 S m n s 0 0 _. c � a a m m n a o a m L 0- CD CD LL CL CD (D a " m F N c 77 < aro c � � N o � �c m v z Q� N v N ffl � 4 c P h � P � q 'o N Z h P' v ro � n 0 caI:ia1�r' ra (D W 0 CL CL rt W � 1 Wi 4F # .7 m� r- OF r ,¢ Y s � u L ro m O A WEO N < m > > n c] ... o- a N N 0 0 N o n o O [n Z O N m cs � 'o n � � � °� ro ➢ ➢ eD m < a � V C cq m N }� - � m r � m o o m N,Y { 73 � 3 S. C- N D o �z,� so 4 Al N u L_ o a ® uz a t'. s to 3 - j. _z1 5 Ti- � O N J I Lk � 0 @ [j co p o a�E �� m n 1 06 Z Z 0 1 0 K 4 �3 o�, 0 0 t Et g ada� o w O O n Q y O m a > O V A Lake {At Full Pond/Formal Water Level] y o' Full Pond/ Normal Water eves S177r lin /0 W , Fq U C s S .s 501 3C Ut I�.n �r No irees removed TIAO to bo�Vee. Wx-rO651on Oro cen5hlbo r -A-e, 05,P- -�he► r t rope+i-t Po r AC-CeSS . Please approximately sketch the following information on this plan, length of shoreline {provide dimensions for each item, such as 10 ft x 100 ft}*: 1. All proposed vegetation clearing z. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: 55GP 10-2013 Page 3 of 3 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM "�803I Project Name/address: ►8353 T DL..annor L���,� county: m�kle►'1�]u�( J Owner: Print Contractor/agent: C Print r ature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved_ Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed_ [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (5)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (S)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake_ [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, _j Aa _ oQe2 hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any wort nducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): / Date: 1 al I 1 LO I I, Christopher Clay, give permission for neighbor Nathan Boyer and CBC Stone & Recycling, LLC to use my property located at 18355 John Connor Rd. Cornelius, NC 28031 as access for the purpose of removing dredge spoils for Nathan Boyer at 18353 John Connor Rd. Signature: Date: X 12/2/2020 Duke Enemy Excavation Permit Application Form FOR DUKE ENERGY USE ONLY Duke File No, Application Fee $ Security Deposit $ Check # Date Recv'd _ Initials Date of Duke Energy Lake Services, applicant and/or contractor on -site inspections DateZOS ZO Initials_ 0 11 Date Final Protection/Avoidance Area Markings Field - Verified Approved to Start Work By * : Date Completion Required Date Passed Closeout Inspection* (Print) Date of Any Approved Extension Initials Initials Date (Sign) Initials Any Stop Work Orders or SMG Violations*? (check one) ❑Yes ❑No (If Yes, explain in PART V) Date Deposit Refunded _ Initials Date Permit Database Updated Initials Forward copy of approved application (all pages, plus any attachments that Dupe Energy changed) hack to applicant with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Orders with application. Part I. Applicant Information (Please Print) Name i do �jauec Telephone 290rjgy j Emailaddress:jru�ouer 31-i�7amo���_cnm Lake Address Mailing Address (if different) rri r 00Y s Nv C_ a v31 r1 r ncY, j�\IL -;Iao3 l Contractor Company Contractor Contact Person `ja,Y7 �Ce �� fp Telephone Contractor Email Address: �� atC, h sr5 -Von Pny>r1 rP P L 1 .� rzn _ YYl LAKE LOT INFORMATION Lake &nrmnnCounty City Conel, oS State _Nc, Tax Map No. Subdivision _ NIr+ Lot / Section No. l a9 Lot Sizep.35Acres Duke Energy rage 4 of 13 rev 1a11/2019 Excavation Program Duke Energy Excavation Permit Avolication Form Are there any Co-Applicants*`l (check one) ©Yes Mo (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional Information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners / lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on -site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE. Initialling this portion of the application by a bake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on -site inspection 12 08 Z 0 Initials (Duke Energy) �� l (applicant/con tractor) Duke Energy Page 5 of 13 rev 101112019 Excavation Program Dube Energy Excavation Permit „Application Form Part H. Description of Project A. Basic Information 1. Type of excavation: (check one) dNew excavation ❑ Maintenance excavation 2. Purpose of excavation: (check one) ❑ Boat Access Channel ❑ Water Intake Channel ❑ Wastewater Discharge Channel 00ther (specify):_n 80&, 3. Lake user category: (check one) Oprivate ❑Residential Marina ❑Commercial Marina ❑Public ❑Other (specify): 4. Max. Excavation Area Dimensions (ft): Length 50 ' Width � Q I Depth _ 3 (Note: include additional area dimensions ifnecessary so response to #5 below equals Max. area dimensions in 44) 5. Volume of Excavated Material (TOTAL for the project): aa2k.aO, Cubic yards 6. Type of material removed (applicant determines byfield sample ifpractical): d i V4 5 i 7. Excavation Site area: O. 1 Acre (s) Disposal Site area: a • a+ Acre(s) $. Total Disturbed Area (including equipment staging area): O • 14 F? , Acre (s) 9. Does the project meet the requirements of the applicable General Permit? (check one) des �o 10. Do you claim title to the disposal area? (check one) Dyes No 11. Do you claim title to the equipment staging area? (check one) &Kes Vo (Se e OM aCh e_d deed) 12_ Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) Yes no (If Yes, specify): 13. How will the excavated material be entrapped and the erosion controlled? (e.g. see attached erosion control plan and disposal area design): ­0 ted3e SOU mc,.+er') CxA +O b e. hauled 00+ b� Iand G,nd-aAkern -FO 615?05&1 'S ttie C�+ U38 Co,K6dy e & m I�w9 '�loocesv,tl�,t`lC a8115 (see a ced �9 Duke Energy [ "r xy\ "551 on ke-�r -F'� ► n n e-�9 h ba r� g3 Page 6 of 13 Excavation Program rev 104/2019 Duke Energy Excavation Permit Application Form 14_ Type(s) of excavation equipment to be used. Lana reach eY--Cava-+CIy- 15. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) Mes ❑No (If yes, explain) 6� b 16. Will return water re-enter the reservoir? (Check one) ❑Yes 9350 ❑N/A (If Yes, specify points) of re-entry and show on Excavation Area Drawing) 17. Is there an existing facility (e.g, pier) that access is being maintained to by conducting the excavation? QYes DINo (If Yes, provide the existing permit number. If No, include a scaled drawing of the proposed facility). Permit #_ n2t 0d oCK ?pr + aVpI-�d C'O ', c 5+ 03 e1oC i " i3 �0--- re-Mov e 18. Total planned duration of the work (Include first equipment mobilization, excavation through final mitigation measures complete): START a / 'Ot, k� FINISH / �— (Month) (Year) (Month) (Year) Duke Energy Page 7 of 13 rev 10/1/2019 Excavation Program 2 I 00 0 k C17 S � i0 0 a, ry m a coo x w CA Ls td �, o .� lLn C? cT o ID C CD I� o Q LC a nn C7 n � � M V E O R. � O y y CD CD 12+ eW- CD Q� CD la. o Cc �t —t-j o '�r1 O C. '+ O Q. O Off-. ¢ CD vz CD �C 0r].. O QQ Q O CD CD � O O o ( CD s O OQ co o CD R F - Cn cD 2. CL, ' CD 4 O O qq O fJG c! O � w x x CD CL CD O UQ � d o C � P CD N O o CD CD tz rt O R, A 0 ti rn rD n_ ~ > v w � �h 9 p e' Y Q b O c T .w n Duke Enemy Excavation Permit Application Form C. Applicant's Signatures Comments: t`le�9h�or5'. S-4e�het� ��ucl ,��► N eA1 Corne�'�vS, t�1.C- 2.St�31 18355 �o�in Con(AOC Co��•e�l� s �� aad�E Applicant Name (print) Applicant Signature* Date -? Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date *Per my signature, the information provided in this application is correct to the best of my knowledge. Duke EnergY Page 10 of 13 rev 10r1l2019 Excavation Program Excavation Project User's Agreement Letter (Please fill in the blanks. Please Print) Date 2�p TO: Duke Energy c/o Lake Services - EC12Q 526 S. Church Street Charlotte, NC 28202 RE: Excavation For (Subdivision and Lot # 's or Other Project Name) i R353 .3o'hri C'onnotz Rd. 1�10 o_B4 t aq (Lake/CountylCdty) q0,t lc�ri I /� rr�elitrS (Applicant's full name) +h _ o u eQ- hereby agrees to comply with all recommendations, requirements and/or Mnditions of Duke Energy, General Permit(s) (if applicable) and other federal, state and local agency requirements pertaining to the application to excavate for the purpose of a O elk) 60CA In addition, Uwe have read and agree to comply with Duke Energy's current Shoreline Management Plan (SMP) or other applicable guidelines, much of which is repeated herein, and understand that written authorization must be obtained from Duke Energy prior to beginning any activity within the Federal Energy Regulatory Commission (FERC) project boundary or on Duke Energy property associated with a reservoir, collectively referred to as Project Boundary. The excavation will be completed as described in the approved application and within eighteen (18) months from the date of written approval by Duke Energy, unless specifically noted otherwise in the application or unless Uwe obtain approval for a single, time extension (maximum of one year) in writing from Duke Energy. Uwe understand that if the SMP or other applicable guidelines or rules change during any extension period, I/eve will be expected to comply with the new requirements to the maximum extent practicable. I/we also recognize that failure to complete the excavation within this build -out period will require the filing of a new application within the then - current SMP or other applicable guidelines and the new application must include any applicable fees and security deposits. Uwe attest to be the owner(s) or lease holder(s) of the land immediately adjoining the Project Boundary where the excavation activity is to take place, or if not the owner or lease holder, Uwe have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the proposal within the Project Boundary adjacent to their land. Uwe attest to be the owner(s) or lease holder(s) of the land that will be used for equipment staging and disposal of excavated material or if not the owner or lease holder, 1/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the work on their land. Duke Energy Page I Rev 41612020 I/we understand that all excavation work must be done directly in front of my/our property and as specified in Duke Energy's approval. Ifwe also understand that access channels must run perpendicular to the shoreline while within the third of the cove area that is nearest my/our property. I/we understand that for proposed excavations, Ifwe must notify the appropriate local, state and federal agencies in advance of the activity by sending them a completed copy of Duke Energy's Excavation Permit Application Form and other required information. Ifwe understand that written authorization and/or other permits may be required by some of these agencies and such required authorizations must be obtained before Ifwe submit the final application to Duke Energy. At FERC-licensed reservoirs, Ifwe understand that except for maintenance excavations, any excavation exceeding 2000 cubic yards of material removed or any excavation or shoreline stabilization work needed to support an application that requires FERC review does itself require specific review and approval by the FERC before Duke Energy can issue any approvals. Ifwe agree that unless specifically approved otherwise in the application, explosives will not be used as part of this excavation activity. I/we understand that every reasonable effort must be made to minimize any adverse impact on fish, wildlife and other natural resources. I/we understand that applicants in South Carolina proposing excavations that are not covered under the General Permit, or are greater than 150 cubic yards, must receive prior written authorization from the South Carolina Department of Health and Environmental Control (SCDHEC) or the US Army Corps of Engineers (as applicable) before submitting the completed application to Duke Energy. Uwe agree that excavation activities will not occur during the months of March, April, May and June because of the potential impacts to fish spawning areas. I/we understand that trees and vegetation growing within or adjoining the Lake play an important role in its overall environmental condition, and the ecological benefit the vegetation has on fish and wildlife habitat directly supports a sound and healthy lake environment. I/we also understand that unauthorized removal of shoreline vegetation (e.g, button bushes, willows, cattails, etc.) and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests, forfeiture of security deposits and require re-establishment of vegetation at my/our expense, particularly if the disturbance is found to be in violation of state or local ordinances or impacts FERC project buffers. I/we agree all excavated material will be placed in upland areas, landward of the Project Boundary, and confined to prevent erosion and sedimentation back into the lake or nearby streams. Duke Energy Page 2 Rev. 416=0 Live agree to adequately stabilize all excavated material and all disturbed shoreline to prevent erosion and runoff into the lake. Live understand that the double handling of excavated material will not be allowed; therefore, all excavated material must be placed above the Project Boundary in one handling. I/we have designed the hydraulic excavation process Qfany will be used) so that return water re- enters the lake in the same general vicinity and cove as the excavation, to the maximum extent practicable. Ifwe agree that the proposed excavation will not be for the purpose of creating additional shoreline, will not alter the Project Boundary or the full pond contour, and will not impact threatened or endangered species, historic properties, or environmentally -important areas, unless special public entity provisions were made in the application. Ifwe recognize that it is my/our responsibility to clearly locate in the field and label on my/our work area drawings any areas that require specific protection or avoidance during this excavation work. Examples of these protection/avoidance areas include but are not limited to, any Environmental Areas, Natural Areas or Impact Minimization Zones as identified by Duke Energy; jurisdictional wetlands; historic properties; rare or threatened species; and buried gas, water, sewer, electric or communications lines. Ifwe agree to provide my/our contractor with a copy of these work area drawings showing these areas to stress the necessary protection measures. I14,e agree that if any archaeological resources (e.g. pottery shards, Indian artifacts, etc.) are discovered during the excavation, work shall be halted immediately. Uwe will then notify Duke Energy and the State Historic Preservation Office to determine what measures, if any, Ave must pursue to protect or salvage the archaeological resources_ Uwe agree that any excavation from within the Project Boundary will not exceed the volume as outlined in the application and will remove and disturb only what is absolutely necessary to achieve the project's stated purpose. Ihve agree to be fully responsible for the permitted lake use and 1/we understand that this responsibility is considered to transfer automatically along with ownership and leases of the adjoining tract. Ifwe understand Duke Energy representatives may issue Stop Work Directives for violations of the SMP or other applicable guidelines and other consequences may result from such violations, including but not limited to suspension or cancellation of approved permits, increases in fees, modification or removal of non -complying structures and restoration of disturbed areas at my/our own expense or loss of any consideration for future lake use permits. Ifwe agree to immediately comply with any Stop Work Directives, to fully cooperate with Duke Energy and other agencies as necessary, and to perform the necessary remedial actions within the specified time frame. Duke Energy Page 3 Rer. 4/612020 Ihve agree to develop any required mitigation plans and to complete any required mitigation activities at my/our own expense within the specified time frames. I/we recognize that the excavation work is not considered complete and deposits will not be refunded until the mitigation requirements (if any) have been satisfactorily fulfilled. Ihve a ree to natify Duke Energy by phone when the excavation is initiated and to ensure that during the excavation period, Ifwe will post Duke Ener 's a roval letter' a clear wate roof bag at the job site and visible from the water's edge. Live agree to notify Duke Energy in writing when the excavation is completed (including any required mitigation measures) and that the excavation was completed per the approved application, so a close-out inspection can be performed. I/we recognize security deposits will not be refunded if any violations of the SMP, other applicable guidelines, or this user's agreement occur. I/we understand there will be no change in hydro project operations as a result of the excavation and/or utilization of the excavated area. I/we agree to maintain the work area in a safe condition and to fully indemnify and save Duke Energy harmless from any and all claims, liability, loss or damage that may arise from this excavation project. I/we understand that this user's agreement does not, in any way, constitute the transfer of any rights in real property and that my/our use and enjoyment of FERC project and Duke Energy lands and waters shall not hinder the general public's lawful use and enjoyment of the same. Sincerely, No.Mhc-n Z \� au e.r _ Applicant's Name C •int) Co -Applicant's Name (Print) Co -Applicant's Name (Print) Co -Applicant's Name (Print) Co -Applicant's Name (Print) '� pplicant's Si ature Co -Applicant's Signature Co -Applicant's Signature Co -Applicant's Signature Co -Applicant's Signature Duke Energy Page 4 Rev: 4f6I2020 t1.31dg4%5 - r.5t3"t For Registration Fredrick"Smith Register of Deeds Mecklenburg County, NC Electronically Recorded 2018 Aug 30 02:08 PM ' RE Excise Tax: $ 1320.00 Book: 32943 Page: 391 . Fee: $ 26.00 Instrument Number: 2018110458 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: S1,320.00 File No. NC- l$-02897 Parcel Identifier No_ 001-841=29 Title Insurance: Investors Title Insurance Com an Mail/Box to: Costner Law Office, PLLC, 12104 Copper Way, Unit 201, Charlotte, NC 28277 This instrument was prepared by: Costner Law Offiee, PLLC, 12104 C er Way, Unit 201, Charlotte, NC 28277 Brief description for the Index: Metes and Bounds, 18353 John Connor Road THIS DEED made this �50 day of _ f [V GyST 20 E , by and between GRANTOR Kerry Heagle and spouse, Linda Heagle Forwarding Address: 3708 Creek Ridge Dr Denver, NC 28037 GRANTEE Nathan Bryan Boyer, legally separated Property/Mail* Address: 19353 John Connor Road Cornelius, NC 28031 The designation Grantor and Grantee as used herein shall include said parties; their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WIMESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by theft presents does grant, bargain, sell and convey unto the Grantee in fee siuTlc, all tlW certain lot, parcel of land or condominium unit situated in the City of Cornelius, Mecklenburg County, North Carolina and more particularly described as follows: BEG(MING at an iron pin found, a common corner of John Conner or Doward Connor, now or formerly, Hunters Chapel Methodist Episcopal Church, Crescent Land and Timber Company and Elsie Cromwell Kaziah, and retuning From the said beginning point with the line of Doward Connor described in deed record in Book 1967 at Page 240, S. 7-15-46 E, 10 fact to an iron pin set; thence a au line S. 70-17-30 W. 242.47 feet to an iron pin; thence another new .line S. 7-00-15 E. 35 feet to an iron pin set; thence S, 70-58-45 W. 128.61 feet to an iron: pin set; thence N. 50-36-55 W. 12.28 feet to a point; thence N. 71-38-57 W. 12.21 feet to a point, thence S, 72-4349 W. 13.42 feet to a point; thence S- 69-43-47 W. 10.08 feet to a point; thence S. 78 30-32 W. 11.15 feet to a point; thence N, 68-07-18 W. 11.18 feet to a point; thence N. 74-15-06 W. 13.48 feet to a point; thence S_ 89-54-43 W. 14.90 feet to a point; thence S. 79-15-19 W. 15.85 feet to a point; thence S, 55-39-40 W. 6"40 feet to a point; thence N. 65-24 36 W. 33.46 feet to an iron pin found in the corner of Bascom V. Bek Jr.; thence with the line of Bascom V. Belk, Jr. N. 72-47 E. 276.56 feet to an iron pin found and continuing N. 72-47 E. 234.82 feet with the tine of Crescent Land and Timber to the point and place of B1 GEgNING, and containing 0.35 acres, more of less; according to a boundary and division survey of Elsie C. Keziah dated May 1, 1989 by John D. Campbell, Submitted electronically by "Costrier Law Office, PLLC" in Compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Mecklenburg county Register of Deeds. t13LU4,i - 1`3uL North Carolina Registered Land Surveyor, and being the same property described and conveyed in deed recorded in Book 18318, Page 779, Mecklenburg County Public Registry. TOGET ER WITH the right of ingress, egress, and regress from said 0.35 acre tract of land to Old Beatties Ford Road, said right of ingress being more particularly described as follows: BEGINNING at the Beginning Point Established hereinabove, and running thence with the line of the Hunters Chapel Methodist Episcopal Church, N. 72-47 E. 313.65 feet to a point in the centerline of Old. Beatties Ford Road; thence with the centerline of Old Beatties Ford Road 8. 5-16 E. 10,05 feet to a point; thence S. 72-47 W_ 313,30 feet to an iron pin set; thence N_ 7-1546 W. 10 feet to the point and place ofBEGD�TN NG. TOGETHER WITH all that right, title anti interest in and to the septic easement referred to in Deed Book 6176, Page 9, Mecklenburg County Public Registry_ TOGETHER VaM that Dock Easement Agreement recorded in Book 32772, Page 270, Mecklenburg County Public Registry. TOGETHER WITH that Utility Easement Agreement recorded in Book 32903, Page 825, Mecklenburg County Public Registry. The property heremabove described was aired by Grantor by instnmaent recorded in Book 18318 page 779. If initialed, the property includes the primary residence of at least one of the Grantors, (N. C. G, S. §105-317.2) A trap showing the above described property is recorded is Plat Book page t33LU4%) - r,iVa TO HAVE AND TO HOLD the aforesaid lot at parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises hat fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encunibm ces, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: There is excepted from these warranties all easements, conditions, rights of way and restrictions as may appear on public record; awl the tieen of ad valorem taxes for the current year which taxes have been prorated as to the date of closing be.tweeg the Grantor and Grantee, iN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of tile. day and year first abbe written. Kerry Linda Heagle STATE OF NORTH CAROLINA COUNTY OF I do hereby certify that perry Heagle and Linda Heagle personally appeared before me this day and acknowledged the due execution of the foregoing inshument. Q Witness my hand and official seal, this the, 3 O day of (l d� V C 20 O , l uk% E� Notary Public Notary's Printed or Typed Name. My Commission Expires: Z (SEAL) JAMIE ©, DUNKEL Notary Public, North Carolina Union County My commission Expife.s Februaty 23.2022 l•;[ `L.3C €}El#ti 7A-k Gti](aiyi Project Name/address. %%nor ► u NC County: _ 1f 1�eCKIe rn60 Location Address:�t� Parcel #: Parcel/iot size a 1-1 q C e Disposal area required (sq ft and/or acreage) l no r :i� �d � Acl,no wfedgemen-C O Notification e Apr e c-e am aware that the site must adhere to all state regulations and rules regarding sedi 4 ent and erosion control and water quality. And give permission for Name of Individual and Company to dispose of their dredee material at the ahnv;z c:a art inrntinn Owner: Along with form, please provide; Aeria[ of parcel/lot (Count; GIS) Photo of proposed spoil site Identified proposed spoil site 0 LO co N W 0 0 0 d b 4 w m N 0 m 0 0 0 cn m cn 0 STATE OF NORTH CAROLINA IREDELL COUNTY i 21 1 certify thei this map was drawn from an aaluaF survey made under my supervision The anudjteted ratio of precision as catc0lated is V: 10,0001 r Boundaries nut survey d, if any, are noted. Deed descrfptlons are mcarijed as I Page shown .Witness my hand and seal this 40'doy of. S4NE 2014 RD. SiCE� p Q � \tttttlll ll lll/r iz I 515 BOl CARO PrafessFaL 03 Surveyor 752 3 ` 155 u SEA- - L-3703 4 - q NOTES: r � %9H�f SU `� �:' A FINLESS 4 fES "ARE SE HDRIZONTAL GROUND DISTANCES t T lllOttttz2` • AREA BY COORDINATE ONPOTATION, ORi �iO'rri� l� NOT TO SCALE • PROPERTY Si1RdFCT TO ANY VALID& EJdFORCEAI3L '�I=f EAScENENTS, RESTRICTIONS LINE TABLE lill lttt171 & RIGHTS OF WAY OF RECORD_ w SURVEY 15 6ASED ON PHYSICAL EV4UENCE AND E1aSTING LINE BEARING DISTANCE MONUMENT FOUND 13URING THE SURVEY- * PROPERTY CGRNER PIPE SIZE5 AS SHOW4 ARE NOMINAL INSIDE DIAMETER. L2 N64'57'57"E 24.31 L3 S71'07'33"E 40.80 L4 S63'06'35"E 95.21 L5 S06'552S"E 46.53 LEGEND L6 Id78'30'#2"W 1-10.15 LINES SURVEYED L7 S54'19'38"E I 82.82 1,INES M07 SURVEYEO------^- TIE LINES OVM14EA) ice~ (DunoN LINE PN 4568-3D-1353 DAKRIDGE STORAGE, R/W UWTS------- D.B. 2521 PG. 2033 f Ir,b TRANSM15510N 0 NO MONUMENTAnON FOYER POLE UNLESS OTHERWISE ¢ CENTERLINE NOTED E PROPERTY LINE (F) DENOTES "FOUNT PIN 4668-24-8185 / f (5) DENOTES "SET" BRIDGES PROPERTIES, IOC J! NTS DENOTES 'NOT TO SCALE' 13_9. 1802 PG. 5912 !J /VCO.CR LOT #t--P.R. 35 I's. 150 f ETE r^ `� / MONUMENT (F) / ! N 67994C.48 FT E 1452951.44 FT ! r NAD a3(2011) / r ! ! 1 o !! GQy PIN 4687-29-6642 -Qm f BRIDGES 3 o a / PRDPERTIES, GLC FF°v o o N / D_B. 1602 PG. 1%12 Ifl p ! PIN 4657-39-DCOO o<az ARGOS USA LW STAGING AREA D.B. 2016 PG. 49B7(CO) J! ! 0,227 ACRE ^ - / DUKE EIVRGY TRANSMISSION LINE L7 TIE 44 LINE ONLY) NAIL (F) AT BENT #4 REBAR (F) N 579337.77 FT BENT #4 -_� € 14r'2850.5G FT _ /REBAR (F) -'E - NAD E3(2011) _ P,.3& GRAPHIC SCALE PIN 4B57 5304 __- PCMFORLESS HOLDINGS, LLC -- 0 73 150 D.B. 2180 PG. 1029 LOT #2-P.9. 26 PG, 73 LNS FILE NO.: Si9050 DWG NO.; S19050 SURVEYED BY: N.D_ WHITLE ( IN FEET) DRAM SY; N.D. WHITLE I inch = 150 M CHECKED BY: J.R. HOBB'. TAR ID: 45aSOURCE OF 9-6542 y )� �� FOR SOURCE OF TITLE REFER TO D.BK_ 1602 PG, 1912 � \�`,fjf I PROPERTY OWNED BY BRIDCES PROPERTIES, I,LC SURREY AND MAP PREPARED BY, SURVEY SHOWING LOCATION OF TAKE NORMAN SURVEYING STAGING AREA & MAPPING PLLC iP-0I90 CODDLE CREEK TOWNSHIP IREUELL COUNTY, N.C. j 37 Jennings Rood, Suite C SCALE: 1" 150' PATE OF SURVEY: DONE 3, 30T9 Statesville, North Corolino 28625 BOOK: NA DATE OF MAPPING: JUNE 3, 2019 (704) 876-4450 F'ax (704) 876-4451 0 Il���lil��l�lll f�I������I1U111N� Recorded: 11123/2004CatT87a2B100 Ph Fee alit: $674.00 Page t of 8 (wxalse Tax: $654,00 IredeliCounty, me BrendA 6. sell Reqlstep of owed$ BK 1602 PG 1912-1914 Excise Tax $654.00 { Tax Lot No- Parcel Identif er No 4667-29-6642 and 4668-24-8I854,34 Verifiedby............................................................................... County on the .......... day of ................................. , by....... ---------------- -.......... --------------- 1--....................................... .-............. ................ ............-... Mail after recording to: Grantee This instrument prepared by: Lutxel, Grandy Broadway, PLLC Brief Description for the Index NORTH CAROLINA GENERAL WARRANTY DEED THIS LAM) madethis 22nd-. -. day of November 2004, by and between GRANTOR GRANTEE Donald Ray Snyder and wife, Victoria A. Snyder, alk/a Vicotira A, Snyder Bridges Properties, LLC 628 Oak Ridge Farm Hwy Mooresville, NC 28115 Enter in appropriate block for each party; name, address, and, if appropriate, character of entity, e.q, corporation or partnership - The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by These presents does, grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of .................................. ... Township, iredeIl County, North Carolina and more particularly described as follows: See Exhibit: "A^ attached hereto and made a part hereof The Property hercinabo-e described was acquired by Grantor by instrument recmded ir,, Book .............. page ......... A imp showing the above described property is recorded in Plat Book ............... Page ........... To HAVF AND TO HOLD the aforesaid lot Or parcel of land and all privileges and appurtenances therein belonging to the Grantee in fee sirnple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee sinVie, has ike right toe convey on , same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hertin- above described is subject to the following exceptions: All caseincuts, restrictions and rights of way of record. Ad valorem taxes for the year 2005 and subscque'at years not yet due and payable, All Inatters revealed by and accurate survey of the property_ IN WITNESS WHEREOF, the Grantor has 11ticanto set his hand and seal, or ifcorpotate, has caused this instrument to be signed in its corporate name by its duly authorized offlicer(s) by authority of its Board OfDirertor% the day and year first above written ........... (Corporate Name) . ........ I ...... . .... ... DonalO�Ray Snyd By: ........................ .....................................b C Attest: u Victoria A. Snyder ............... --------- ­.­ .............. .................................------------------------------------- --- {SEAL) ................................... ­ Secretary ..........I ......................... ............. NORTH CAROLNCOUNT "0 1, a Notary Public, Of the County and State aforesaid, cenify;a-164W SNYder, Grantor, Personally appeared before nWdE-AKOud acknowIcdfee foregoing instrument. Witness my handhand MY Commission Expires; M/o/M/ - (SEAL) and Victoria A, xecution of the 1!f7�_:_......_.....Notary (SEAL) NORTH CAROLINA . ............................... COUNTY. 1. a Notary Public; of the County and State aforesaid, certify that ......... ................................ ... I ............................ ...... ­.­_ ...... ........................ .... _'Orantor. personally appeared before me this day and acknowledged That belshe is ................................... of.. "I ................ ........... I—— ......... I ............................................... ­­­ .................. a corporation, and that he/she as ... _ ............ ............. _ ............ being authorized to dr; so, exe- cuted the foregoing instrument On bBh8ffOfthc COMOTatiOn- Witness my hand and official stamp or sealthis .................. dayof..................................... 2004- My COMMiSSiOR EXpi-CS: ......................... .................................. - ......... ___ ............. Notary Public Tim foregoing Certificatt(s) of, ...... . the Hook Page is/are cerdfied to be correct. This instrument and this certificate duty mVstrd at th and in EXI HB IT "A" TRACT 1: BEING all of that certain 6.49 acre tract located in Coddle Creels Township, Iredell Courtly, North Carolina on NC Hwy 150 By-pass, being more particularly described as follows: BEGINNING at a point in the centerline of the 100 ft tight of way for NC Hwy 150 By-pass, said point being located North 36-17-36 East 2,459.39 ft. (Ground) from NCGS Monument "Run In" N: 206,469.354 meters E-. 445,280.693 ureters Dated: 1991 NAD 93; thence continuing from said point of Beginning and along the centerline of the right of way for NC Hwy 150, North 36- 22-16 East 561.58 ft. to a point; thence leaving said right of way and running with the line of Whitman property (now or formerly) South 64-06 48 East 49.90 ft. to an existing #4 rebar in the eastern margin of the right of way for NC Hwy 150, thence South 64-06-48 East 246.91 ft- to an existing 1 112" pipe; thence continuing with another line of Whitman property North 40-19-43 East 305.82 fL to an existing 1" pipe; thence North 71-1 &07 East 121.51 ft. to an existing angle iron in the line of Evelyn Brown (See Deed Book 308, Page 337, Iredell County Registry); thence a new line of John W. Cafifey, et al (see Deed Book 601, Page 538, Iredell County Registry) South 42- 31-26 West 221.12 ft. to an existing concrete monument; thence another new line of Caffey, et al South 15-00-41 West 614.81 ft, to an existing 42 rebar; thence with the northern line of lot 2, Scott D. Burton Property (see Plat Book 26, Page 73, Iredeff County Registry) North 74-59-17 West 572.00 ft, to an existing #2 rebar in the eastern margin of the right of way for NC Hwy 150, thence North 74-59-17 West 53.64 fi, to the point and place of Beginning. TRACT ll: BEING all and the fall contents of Lot No. I as shown on plat of Minor Subdivision for Wiiliarn Wallace Whitman Estate and recorded in Plat Hook 36, Page 150, lredell County Registry, to which plat reference is made for a more full and complete description of said lot by mates and bounds. Catawba Indian Nation Tribal Historic Preservation Office 1536 Tom Steven Road Rock Hill, South Carolina 29730 December 23, 2020 Attention: Janice Estep CBC Stone & Recycling, LLC Re. THPO # TCNS # Project Description 2021-566-5 Nathan B. Boyer— 18353 John Connor Road, Cornelius, NC Dear Ms. Estep, The Catawba have no immediate concerns with regard to traditional cultural properties, sacred sites or Native American archaeological sites within the boundaries of the proposed project areas. However, the Catawba are to be notified if Native American artifacts and 1 or human remains are located during the ground disturbance phase of this project. If you have questions please contact Caitlin Rogers at 803-328-2427 ext. 226, or e-mail Caitlin.Rogers@catawba.com. Sincerely, C GtJtt Wenonah G. Haire �J Tribal Historic Preservation Officer 0>Mr-0::ET00♦ W=z♦ D♦ i�: �::♦ �v to 0T--iCQ > c�'n� m0 �� zzc�n -n -o cm�r-�m z-2r- z©c)0 �n cccn oX 0 OXZWD�F-mXT cn —oO 07 _-nm cm -n �m5XMrrMX63m ���D m� CDinpp ZD n Oyz�°m-i -nzcCn Xpo� CAD �-�r Dp -ni mZz —O 0--1nD m0zz mm ��� cnn 0 zz Dnq C) mm0 mz Z r�=r[cOmn�2y=mm� yrmcn DD xza0 ter` cn `ImC� m D zC�D r nn M� �O = Z m w__=-im- .� z 0 c m 0 Op DcnmOmO0 yN= D 0z go Cl) �7m�ODin��mU) QOmD� �m �_X-iCm=m-�N O0�o D �� cjr, Zm U-A-nMZOZ�y m�DD n Z� �r !�z- �yOrrr- 00cz- T D� =n zm=ten -'_ >C. -4� ZC� m =-[OD �D z y � c D�� U m o< M N O� m Oz m O Z �D-E�m�m ;v (n D Z� Drr7mrm- p D �Cn Cr = G) D C� C7 m -n 40 mD ou---�=�—CO Dnr v3 --im om cn�M�0Z�> rn�M _M Q C-nZm�DOO* Dm'o Dm `l7 m zxzz -i?= r-ZM x 0 =OG)n -DmZM co U)cl) C� nZ o z D n O� m> y m n K m o co .zD]D`� a: -n Z�m (n0 m m w Mr-�=m G7 X 0 C� x m -< M M D i --i Co�:OC-4 OZmD =1 Uycn cn=Cmm>MMO > m CZ �XMzm7m= 0 0 om D -0�,0w0XD m �� D rn O o — -� r �m;2G)to Oz _= 0 _ --ml�mGr-7�C 0 m 7rJ rD- ? r -pFg00T0^';o m�w� K m T �T� /lJ /V N l J O TI Z m z O�j C = ® ��® �� N �. O !''.� z �� m C m �r� �] J Om M 0O ncnZ rj ' o on J �� n CIO �6 z r9 © z o � r A�� � -G J -P Z7 0 z m �y o o a m D m ti ti Q) j O O rn h fil a � n CO y Dp�O (fj 00 _ - � Q O C3l cn /C:J� D o r m N O 7 -0T �1 C7 -0 I i T f O O � Cc) o �1 7U4 � T N oD C� O �� Z FTl ono 1 J 02 �1 r D 0c .� O C/) � z n �, °� o ry m a w�'' rn o W I Tl z r�-i r� �� z M +� z o 1,D o_ g a ��n J A m m rn d 0 0 �N � X Cn � 0 b N O p a, d2 m O �° kaoc� rn aim° oCA z Xzcn u � ,j zE n❑r-Z z zom= o c ° _ �Di mo o� x 'C7 fTl TOTI w m w m m !\�\ A l/Q�1 O K rr, OW ®d� GZ Oo( OO ' -C -U4 0L0 ® mC� J m D r � j Z FTl C 0 z Z y � r g C. J rri ®�� Irn CD - MM. ID#* 20201861 Version` 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 12/212020 Contact Name * Janice Estep Contact Email Address* Project Name * Project Owner* Project county` Owner Address: info@cbestoneandrecycling.com Boyer Dredge Nathan Boyer Mecklenburg Street Address 18353 John Connor Rd. Address Line 2 cfty Cornelius Fbstal / Zip Code 28031 Is this a transportation project?* r Yes r No Slate ! Province 1 Fagm NC Country United States Type(s) of approval sought from the DWR: i 401 Water Quality Certification - r 401 Water Quality Certification - Regular Express F_ Individual Permit r- Modification W shoreline Stabilization Does this project have an existing project ID#'? r Yes r No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below.* Dredge a 50' x40' area for new dock. Old dock to be removed. Please give a couple of dates you are available for a meeting. 12/312020 121312020 12/7/2020 12/8/2020 121912020 Please attach the documentation you would like to have the meeting about. Boyer Dredge Area.pdf 823.32KB pdf oNy By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that ❑WR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application, Signature Submittal Date 12/2/2020