HomeMy WebLinkAboutNCC210011_ESC Approval Submitted_20210105 �oTY.�
G g
j � Permit GP# 14-17
klbA Revision#39 and 44
r
Permit for a Land-Disturbing Activity
New Hanover County
Department of Engineering
230 Government Center Drive - Suite 160
Wilmington, North Carolina 28403
(910) 798-7139
As authorized by the New Hanover County Erosion and Sedimentation Control Ordinance
This permit issued to Seventy West Builders, Inc. authorizes the development of 5.31 acres of land at
River Lights Conventional Phase III & IV in New Hanover County, for the lots listed below. This permit issued on
November 23, 2020 is subject to compliance with the application and site drawings, all applicable regulations and
special conditions and notes set forth below. Any plan modifications must be approved by this office prior to
field changes.
It is understood by the applicant that a representative of New Hanover County's Engineering Department
may inspect the site at any time following the issuance of this Permit. A copy of the approved Soil Erosion
Control Plan as well as any approved deviations,this permit, a rain gauge, a copy of the NCG01 permit, a copy of
the Certificate of Coverage (COC) from the State and copies of the Combined Self-Monitoring and Self-Inspection
Reports must be available at all times at the site.
Failure to execute the provisions of this permit and the approved Soil Erosion Plan, or any other provisions
of the New Hanover County Soil Erosion and Sedimentation Control Ordinance, may result in immediate legal
action by the County to the limits prescribed by the Ordinance. If the measures outlined on the approved Soil
Erosion Control Plan and this Permit prove insufficient, additional Erosion Control measures can and will be
required which in turn will be considered provisions of this Permit. This Permit does not preclude any other
permits or approvals necessary for beginning or completing this development. Approval of an erosion control
plan is conditioned on the applicant's compliance with Federal and State laws, regulations and rules. It is the
Permittee's responsibility to obtain all necessary permits and approvals.
SPECIAL CONDITIONS
(THESE CONDITIONS MUST BE FOLLOWED IN ADDITION TO THE PLANS AND SPECIFICATIONS)
All the soil erosion control measures will be installed as the site is cleared and maintained throughout
construction.
These include Revision#5 for 0.85 acres approved 6/20/18 includes construction entrances, silt fences, inlet protection and
concrete washouts on Lots 286, 298, 299, 300, 374, 375 &376 in River Lights Conventional Phase Ill.
Revision#6 for 0.26 acres approved 6/23/18 includes construction entrances, silt fences, inlet protection and concrete
washouts on Lots 301 & 302 in River Lights Conventional Phase Ill.
Revision#8 for 0.37 acres approved 8/16/18 includes construction entrances, silt fences, inlet protection and concrete
washouts on Lots 282, 355 & 377 in River Lights Conventional Phase III.
Revision #9 for 0.13 acres approved 9/22/18 includes a construction entrance, silt fences, inlet protection and concrete
washouts on Lot 285 in River Lights Conventional Phase III.
Revision #10 for 0.11 acres approved 11/6/18 includes a construction entrance, silt fences, inlet protection and concrete
washouts on Lot 380 in River Lights Conventional Phase lil.
Revision#12 for 0.53 acres approved 12/21/18 includes construction entrances, silt fences, inlet protection and concrete
(Continued) - Page Two Permit GP# 14-17
Revision#39 and 44
washouts on Lots 249 & 284 in River Lights Conventional Phase III.
Revision#15 for 0.14 acres approved 3/29/19 includes a construction entrance, silt fences, inlet protection and concrete
washouts on lot 283 in River Lights Conventional Phase III.
Revision#16 for 0.32 acres approved 3/29/19 includes construction entrances, silt fences, inlet protection and concrete
washouts on lots 250&254 in River Lights Conventional Phase Ill.
NOTE: Revisions 5, 6, 8, 9, 10, 12, 15 & 16 were previously approved under separate special conditions prior to the NCG01
April 1, 2019 deadline.
Revision#17 for 0.22 acres approved 5/6/19 includes construction entrances,silt fences, inlet protection and concrete
washouts for Lots 303 & 356 in River Lights Conventional Phase HI.
Revision#18 for 0.27 acres approved 5/23/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lots 357, 378&379 in River Lights Conventional Phase III.
Revision#19 for 0.26 acres approved 6/4/19 includes construction entrances,silt fences, inlet protection and concrete
washouts for Lots 253 &304 in River Lights Conventional Phase III.
Revision#21 for 0.20 acres approved 8/21/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lots 358& 361 in River Lights Conventional Phase III.
Revision#26 for 0.16 acres approved 8/21/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lot 346 in River Lights Conventional Phase III.
Revision#28 for 0.13 acres approved 8/21/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lot 345 in River Lights Conventional Phase III.
Revision#30 for 0.34 acres approved 2/12/20 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lots 343, 344&360 in River Lights Conventional Phase III.
Revision#33 for 0.12 acres approved 4/23/20 includes a construction entrance, silt fence, inlet protection and concrete
washouts for lot 409 in River Lights Conventional Phase IV.
Revision#34 for 0.5 acres approved 5/11/20 includes a construction entrance, silt fence, inlet protection and concrete
washouts for lots 251. 252. 359 &415 in River Lights Conventional Phase III & IV.
Revision#35 for 0.2 acres approved 7/11/20 includes a construction entrance,silt fence, inlet protection and concrete
washouts for lots 490 &491 in River Lights Conventional Phase Ill & IV protection and concrete washouts on Lots 301& 302
in River Lights Conventional Phase III.
Revision#39 and#44 for 0.2 acres in River Lights Conventional Phase IV includes construction entrances,silt fence,
concrete washouts,and all NCG01 regulations on Lots 489 and 492.
*Tree Removal Permits and/or Approvals are required from the City of Wilmington and/or New Hanover County
prior to issuance of the land disturbing-permit and clearing of the site.
*Silt fence stakes must be steel and will be placed six feet apart without wire reinforcement or eight feet apart
with wire reinforcement. Silt fence is not allowed as inlet protection.
*This permit does not preclude any permits or approvals which may be necessary such as City of Wilmington or
New Hanover County, NCDEMLR, C.A.M.A., and/or the US Army Corps. of Engineers, DEM Solid Waste or any
other agencies.
*No sediment shall leave the site in suspension of water.
*If plan revisions are necessary you must submit a copy to this office for approval prior to any field changes.
*If soil is brought onto this site or removed from this site, it must come from or be taken to an approved or
permitted site, to be identified to this office prior to being brought onsite or removal from the site.
*All City and/or County and State drainage and stormwater requirements will be adhered to.
*If these measures fail to adequately control erosion, more restrictive measures will be required.
if any phase of grading ceases for more than 90 calendar days, the site will be temporarily stabilized.
*All slopes must be stabilized within 21 calendar days of any phase of activity.
The approval of an erosion control plan is conditioned on the applicant's compliance with Federal and State
Water Quality laws, regulations and rules.
*Note the required rates for seed, lime, fertilizer and mulch in your seeding specifications.
(Centinued) - Page Three Permit GP# 14-17
Revision #39 and 44
*Enclosed is a Combined Self-Monitoring and Self-Inspection Form that meets the requirements of both the
NPDES Stormwater Permit for Construction Activities, NCG 010000 reporting and the Land Resources Self-
Inspection Program that satisfies the requirements of the Sedimentation Pollution Control Act.These are
mentioned below with specific requirements for each program.These reports are the responsibility of the
property owner. They require a rain gauge onsite, inspections and reporting every 7 calendar days and within
24 hours of every 1.0-inch rain per 24-hour period and at specific phases of construction.Additional copies of
this Combined Construction Inspection Report can be found at http://portal.ncdenr.org/web/lr/erosion
Reports must be available onsite at all times. If you have questions, please contact New Hanover County
Engineering (910) 798-7139 or the Land Quality Section at the NCDEMLR Regional office at (910) 796-7215.
*Note the NPDES information from the State for sites disturbing 1 acre or more and the reporting
requirements. All NEW projects permitted after August 3, 2011 must include the following surface water
withdrawal locations and stabilization requirement designations on the plan in order to qualify for coverage
under the most recent NPDES Construction General Permit. All settling basins must have outlet structures that
withdraw water from the surface, with the exception of basins or traps that have a drainage area of less than 1
acre. The NPDES permit also requires ground cover within 15 calendar days on disturbed flat areas and ground
cover within 7 calendar days on all areas within HQW Zones, perimeter dikes, swales, ditches, perimeter slopes
and all slopes steeper than 3:1. Exceptions include slopes that are 10 feet or less in length and not steeper than
2:1 which must be stabilized within 14 calendar days and slopes greater than 50 feet which must be stabilized
within 7 calendar days. It requires inspections of all erosion control measures and reporting every 7 days and
within 24 hours of every 1.0-inch rain event in a 24-hour period. This permit also includes other new
requirements which are listed in the text of the NPDES Stormwater Discharge Permit for Construction Activities,
which is included with the original copy of each land-disturbing permit.
*Note the Land Resources Self Inspection Program Requirements.This program is separate from the NPDES
reporting and requires inspection and documentation after each phase of construction. These phases include:
Installation of perimeter erosion control measures, Clearing and Grubbing of existing ground cover, Completion
of any phase of grading of slopes or fills, Installation of storm drainage facilities, Completion of construction or
development, Establishment of permanent ground cover sufficient to restrain erosion and any Deviation from
the approved plan.
*Pre-construction meetings are optional. Contact Beth E. Wetherill at (910) 798-7139 to set up a meeting prior
to land-disturbing activity onsite. If you do not choose to have a preconstruction meeting prior to starting work
on site, you should contact us when activity begins and again when the initial measures have been installed.
1
(Continued)- Page Four Permit GP# 14-17
Revision#39 and 44
This Permit will expire one year from date of issue Acknowledgment of receipt of Permit
if no construction activity begins on site.This permit
may not be amended or transferred to another party
without approval of this office. �},e,4i1 U)e E+ • U i DOTS)i nc,
Owner
PLI
aVel &ifekrk
By(please print)
Beth Furr
Erosion Control Inspector/ New Hanover County
ignature