Loading...
HomeMy WebLinkAbout20081394 Ver 1_Certification of Completion_20101117?MCIQM&CREED TO: NCDWQ 401 Oversight Unit 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 ATTENTION: LETTER OF TRANSMITTAL V DATE: November 15, 2010 PROJECT' NO: 1517-0178 TASK NO: RE: SECU-Madison 401 Certificate of Completion TRANSMITTAL NO: PAGE 1 OF 1 WE ARE SENDING: ® Originals ? Prints ? Shop Drawings ? Samples ? Specifications ? Calculations ? Other Quantity Drawing No. Rev Description Status 1 401 Certificate of Completion SOS r ?Gf REMARKS: Please find the enclosed the 401 Stormwater Certificate of Completion for the State Employees' Credit Union in Madison. Please let me know if you need anything else. Thanks, 1730 Varsity Dr., Suite 500, Raleigh, NC 27606 919/233-8091 Fax 919/233-8031 Cc: McKIM & CREED, PA r" VX Signed /;, . (, Ja n C. Allen, PE, LEED AP Madison SECU January 14, 2009 DWQ # 08-1394 Page 3 DWQ Project No.: d 8 _ i 3`4 County: rack h6 1, Corn Applicant: A1,9,- A 6oif-d,., Project Name: 5 EG L) Date of Issuance of 401 Water Quality Certification: /ten v?ti? I ?', 200 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, _, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certi cation Partial_ Final I, Tck-So (- - Al , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature ?)? C C . Registration No. D 337+13 Date /l65by