HomeMy WebLinkAbout20190814 Ver 2_PreFiling Email 30-Day Clock Reached Email_20201221Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, December 21, 2020 12:01 AM
To: lauren.norris-heflin@timmons.com
Cc: Homewood, Sue
Subject: Pre -Filing Time Clock has been reached for Shallowford - 20190814 Ver 2
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Shallowford that
you submitted on 11/20/2020. The ID number for that project is 20190814, Version 2.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20190814
Version* 2
Regional Office* Winston-Salem Regional Office - (336) 776-9800
Reviewer List* Sue Homewood
Pre -Filing Meeting Request submitted 11/20/2020
................................................................................................................................................................................................................................................................................................................
Contact Name * Lauren Norris -Heflin
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
lauren.norris-heflin@timmons.com
Shallowford
Paul Holst
Guilford
Street Address
3514-B Drawbridge Parkway
Address Line 2
aty
Greensboro
Fbstal / Zip Code
27410
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
DWR # 20190814; SAW-2018-01810
Do you know the name of the staff member you would like to request a meeting with?
Sue Homewood
Please give a brief project description below.*
In addition to this electronic submission, agency consultation was
initiated with the USACE and DWR via email on 11/19/2020.
We need to request a permit update for the site know as Shallowford
(fka Point at Elon), SAW-2018-01810, DWR #20190814 (see
attached). Upon finalization of project plans, it was determined the
original proposed bridge is not practicable due to safety requirements
and costs. In order to safely and affordably cross the stream,
including allowing for a required sidewalk, a culverted crossing will be
required.
The original permit included 98 linear feet (If) of permanent stream
impacts to Stream A and a bridged crossing of the stream flowing
generally north/south through the site.
Impact Maps are still in progress, but it is anticipated that the update
will eliminate impacts to Stream A, maintain the same or (if possible)
reduce wetland impacts, and increase permanent impacts to the main
stream to approximately 132-ft.
Please give a couple of dates you are available for a meeting.
11 /25/2020
11 /30/2020
12/1 /2020
12/7/2020
12/9/2020
Please attach the documentation you would like to have the meeting about.
2018-01810 NWP 29 and 18 Tearsheet.pdf 3.9MB
20190814 Ver 1—Approval
2.33MB
Letter 20200128.pdf
pdF only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 11/20/2020