Loading...
HomeMy WebLinkAbout20190814 Ver 2_PreFiling Email 30-Day Clock Reached Email_20201221Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, December 21, 2020 12:01 AM To: lauren.norris-heflin@timmons.com Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Shallowford - 20190814 Ver 2 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Shallowford that you submitted on 11/20/2020. The ID number for that project is 20190814, Version 2. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20190814 Version* 2 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 11/20/2020 ................................................................................................................................................................................................................................................................................................................ Contact Name * Lauren Norris -Heflin Contact Email Address* Project Name* Project Owner* Project County* Owner Address: lauren.norris-heflin@timmons.com Shallowford Paul Holst Guilford Street Address 3514-B Drawbridge Parkway Address Line 2 aty Greensboro Fbstal / Zip Code 27410 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* DWR # 20190814; SAW-2018-01810 Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below.* In addition to this electronic submission, agency consultation was initiated with the USACE and DWR via email on 11/19/2020. We need to request a permit update for the site know as Shallowford (fka Point at Elon), SAW-2018-01810, DWR #20190814 (see attached). Upon finalization of project plans, it was determined the original proposed bridge is not practicable due to safety requirements and costs. In order to safely and affordably cross the stream, including allowing for a required sidewalk, a culverted crossing will be required. The original permit included 98 linear feet (If) of permanent stream impacts to Stream A and a bridged crossing of the stream flowing generally north/south through the site. Impact Maps are still in progress, but it is anticipated that the update will eliminate impacts to Stream A, maintain the same or (if possible) reduce wetland impacts, and increase permanent impacts to the main stream to approximately 132-ft. Please give a couple of dates you are available for a meeting. 11 /25/2020 11 /30/2020 12/1 /2020 12/7/2020 12/9/2020 Please attach the documentation you would like to have the meeting about. 2018-01810 NWP 29 and 18 Tearsheet.pdf 3.9MB 20190814 Ver 1—Approval 2.33MB Letter 20200128.pdf pdF only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/20/2020