HomeMy WebLinkAbout20201874 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210103Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, January 3, 2021 12:01 AM
To: matt.harrelI@carolinaeco.com
Cc: Turlington, Chad
Subject: Pre -Filing Time Clock has been reached for Cross Creek Bank Stabilization -
20201874 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Cross Creek Bank
Stabilization that you submitted on 12/3/2020. The ID number for that project is 20201874, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20201874
Version* 1
Regional Office* Fayetteville Regional Office - (910) 433-3300
Reviewer List* Chad Turlington
Pre -Filing Meeting Request submitted 12/3/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Matthew Harrell
matt. harrell@carolinaeco.com
Cross Creek Bank Stabilization
City of Fayetteville
Cumberland
Street Address
433 Hay St
Address Line 2
aty
Fayetteville
Fbstal / Zip Code
28301
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Province / Region
North Carolina
Country
United States
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
This pre -filing meeting request encompasses three locations along
Cross Creek in downtown Fayetteville where streambank stabilization
measures are proposed (See attached figure). Along an
approximately 2,000-foot stretch of Cross Creek in downtown
Fayetteville, there are three locations where high flow events have
significantly eroded streambanks posing immediate threats to
adjacent properties. The proposed actions would include structural
bank stabilization to prevent additional property loss. Each location
will be permitted separately, and these applications are underway
and anticipated in early January 2021. Draft plans for two of the three
locations (Beaver Law and St. Johns) are attached but subject to
change as design is in progress.
Please give a couple of dates you are available for a meeting.
12/14/2020
12/21 /2020
Please attach the documentation you would like to have the meeting about.
CrossCreekSectionEWP Pre
— 5.38MB
Filing_FigurePackage.pdf
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 12/3/2020