Loading...
HomeMy WebLinkAbout20201868 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210103Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, January 3, 2021 12:01 AM To: dlutheran@segi.us Cc: Mairs, Robb L Subject: Pre -Filing Time Clock has been reached for 1213 Cana Drive, Carolina Beach - 20201868 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for 1213 Cana Drive, Carolina Beach that you submitted on 12/3/2020. The ID number for that project is 20201868, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201868 Version* 1 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Robb Mairs Pre -Filing Meeting Request submitted 12/3/2020 Contact Name * Dana Lutheran Contact Email Address* dlutheran@segi.us Project Name* 1213 Cana Drive, Carolina Beach Project Owner* Lester Phillips Project County* New Hanover Owner Address: Street Address 5315 South College Road Address Line 2 Suite E aty State / Province / Pegion Wilmington NC Postal / Zip Code Country 28584 United States Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit F Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Robb Mairs Please give a brief project description below. Work associated with the project will consist of removing the existing 88' length of stormwater pipe and replacing the existing inlet; installing two sections of 24" reenforced concrete pipe (RCP), totaling approximately 104', and one junction box; constructing a 106 LF bulkhead, which will be straightened out, on the southern end, removing rubble, wetland vegetation and the existing bulkhead and backfilling with clean earthen soil. To facilitate the construction of the bulkhead and relocation of the stormwater pipe, approximately 10 cubic yards (CY) of material will be excavated below normal high water (NHW) and 90 CY of clean earthen soil will be discharged, waterward of NHW. As a result, 460 SF of coastal wetlands and 154 SF of submerged bottom will be converted to upland. Approximately 30 CY of material will be excavated within the upland area of the lot. After all this work has been completed repair work, on the pier, gazebo and floating platform will take place. Heavy equipment, such as an excavator, dump truck and front end loader, will be used to complete the work. The machinery will be stored on -site, should the need arise. Fill material will either be generated on site or obtained from a local, approved sand pit. All unsuitable material will be disposed of off -site at an approved landfill. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. 1213 CANAL DR CAMA MAJOR PERMIT SITE 604.33KB PLAN 12-3-2020.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 12/3/2020