Loading...
HomeMy WebLinkAbout820724_Structure Evaluation Inspection_20200114 Structure Evaluation Inspection Facility Number: -- Date: /— 1I D Time in: 1/,'D Time out: L/ Farm Name: ('b Farm 911 address: Owner Name: Phone Facility Contact: /YR. Onsite Representative: C Q.-11.z-rfiiu,- Integrator: Certified Operator: Cert. Number Is storage capacity less than adequate? Yes-----No If yes is waste level into the structural freeboard? Yes No ----- Was non-compliant level reported to DWR POA received 24,-:.5 Structure: 1 2 3 4 5 6 Identifier: Spillway? • Designed Freeboard (in.): Observed Freeboard (in.): /j Are there any immediate threats to the integrity of any of the structures observed? Yes No Do any structures lack adequate markers as required by the permit? Yes _ No �. Does any part of the waste management system need repair Yes No / Condition of field's ar-r:a_&- . /A>if. Condition of receiving crop F rZZ• '1L--,--74 Comments: