HomeMy WebLinkAbout20201783 Ver 1_PreFiling 30-Day Clock Reached Email_20201220Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, December 20, 2020 12:01 AM
To: blepsic@sepiinc.com
Subject: Pre -Filing Time Clock has been reached for Gem Street Extension - 20201783 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Gem Street
Extension that you submitted on 11/19/2020. The ID number for that project is 20201783, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20201783 Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Donna Hood
Pre -Filing Meeting Request submitted 11/19/2020
..........................................................................................................................................................................................................................
Contact Name * robert lepsic
Contact Email Address* blepsic@sepiinc.com
Project Name* Gem Street Extension
Project Owner*
Project County*
Owner Address:
Town of Cornelius
Mecklenburg
Street Address
PO Box 399
Address Line 2
aty
Cornelius
Fbstal / Zip Code
28031
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
No
Please give a brief project description below.
The proposed project will widen Willow and Gem streets and extend
Gem Street to intersect with Oak Street. A sidewalk will be
constructed on the north side of Willow and Gem streets. A paved
parking area will be constructed adjacent to the Gem Street
extension. Storm drain improvements will be made within the Center
Street right of way.
The project will improve motorist safety, provide a sidewalk
connection to Cornelius Elementary School and provide parking for
the Oak Street Mill. The approximate 2.5-acre project study area runs
along Willow Street and Gem Street for their entire lengths and from
the end of Gem Street southeasterly to Oak Street. It also runs within
the Center Street right-of-way from Willow Street south, approximately
700 feet.
Flexible on meeting dates.
Please give a couple of dates you are available for a meeting.
Please attach the documentation you would like to have the meeting about.
Figures.pdf 20.61 MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 11/19/2020