Loading...
HomeMy WebLinkAbout20201783 Ver 1_PreFiling 30-Day Clock Reached Email_20201220Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, December 20, 2020 12:01 AM To: blepsic@sepiinc.com Subject: Pre -Filing Time Clock has been reached for Gem Street Extension - 20201783 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Gem Street Extension that you submitted on 11/19/2020. The ID number for that project is 20201783, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201783 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Donna Hood Pre -Filing Meeting Request submitted 11/19/2020 .......................................................................................................................................................................................................................... Contact Name * robert lepsic Contact Email Address* blepsic@sepiinc.com Project Name* Gem Street Extension Project Owner* Project County* Owner Address: Town of Cornelius Mecklenburg Street Address PO Box 399 Address Line 2 aty Cornelius Fbstal / Zip Code 28031 Is this a transportation project?* r Yes r No State / Province / Region NC Country United States Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below. The proposed project will widen Willow and Gem streets and extend Gem Street to intersect with Oak Street. A sidewalk will be constructed on the north side of Willow and Gem streets. A paved parking area will be constructed adjacent to the Gem Street extension. Storm drain improvements will be made within the Center Street right of way. The project will improve motorist safety, provide a sidewalk connection to Cornelius Elementary School and provide parking for the Oak Street Mill. The approximate 2.5-acre project study area runs along Willow Street and Gem Street for their entire lengths and from the end of Gem Street southeasterly to Oak Street. It also runs within the Center Street right-of-way from Willow Street south, approximately 700 feet. Flexible on meeting dates. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. Figures.pdf 20.61 MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/19/2020