Loading...
HomeMy WebLinkAbout820719_Plan of Action (POA)_20200522 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 5/22/2020 1. Structure Name/Identifier(ID): Sessoms Southern Swine, LLC 82-719 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 24.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 26.0 inches c. line b-line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 67800 ft2 e. line c/12 x line d x 7.48 gallons/ft3 84524 gallons 3. Projected volume of waste liquid produced during draw down period 99 f. temporary storage period 132 180 days g. volume of waste produced according to structural design 46887.7 ft3 h. current herd# 6400 certified herd# 6400 - actual waste produced = current herd# x line g = 46888 ft3 certified herd# i. volume of wash water according to structural design 30976 ft3 j. excess rainfall over evaporation according to design 47234 ft3 k. (lines h+ i+j)x 7.48 x 30 days/line f= 155955 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 12/18/2019 1.66 lbs/1000 gal. m. ((lines e+ k)/1000)x line I= 399.2 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00 5/22/2020 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Sessoms Southern Swine, LLC line m= 399.2 lb PAN 2. Structure ID: line m= lb PAN 3. Structure ID: line m= lb PAN 4. Structure ID: line m= lb PAN 5. Structure ID: line m= lb PAN 6. Structure ID: line m= lb PAN n. lines1 +2+3+4+5+6= 399.2 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract# p. field# q. crop r. acres s.remaining IRR-t.TOTAL PAN u.application window 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) column r x s 1 1 Pearl Millet 3.54 152.00 538.1 4/1 -9/15 1 2 Pearl Millet 5.07 152.00 770.6 4/1 -9/15 1 3 Pearl Millet 5.07 152.00 770.6 4/1 -9/15 1 4 Pearl Millet 4.51 152.00 685.5 4/1 -9/15 1 5 Pearl Millet 4.17 152.00 633.8 4/1 -9/15 1 6 Pearl Millet 4.66 152.00 708.3 4/1 -9/15 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields(sum of column t)= 4107.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (linen from section II)= 399.2 lb. PAN x. Crop's remaining PAN balance(line v from section III)= 4107.0 lb. PAN y. Overall PAN balance(w-x)= -3708 lb. PAN PoA(30 Day)2/21/00 5/22/2020 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation,herd reduction,etc. For pump&haul and herd reduction options,recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit. PoA(30 Day)2/21/00 5/22/2020