Loading...
HomeMy WebLinkAbout20100852 Ver 1_More Info Received_20101202MUNICIPAL ENGINEERING SERVICES CO., P.A. TRANSMITTAL Post Office Box 97 Post Office Box 349 Post Office Box 828 Garner, N.C. 27529 Boone, N.C. 28607 Morehead City, NC 28557 (919) 772-5393 (828) 262-1767 (252) 726-9481 FAX (919) 772-1176 FAX (828) 265-2601 FAX (252) 222-0675 TO NCDENR Please find enclosed: DATE 12/01/10 PROJ. NO. ATTENTION Ian McMillan RE: Copy of water quality letter and plan for Town of Wilkesboro COPIES DATE DESCRIPTION 1 12/01/10 Copy of water quality letter and plan for Town of Wilkesboro TRANSMITTED BY: Ben Clawson, P.E. 1 7-U @ Lz zI DE v LUiU wAyFn QUALITY V&RANDS AND c r0R!l,"fc:4T:R ERANCN If enclosures are not as noted, kindly notify us at once. NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary CERTIFIED MAIL: 7010 0290 0001 4856 4539 RETURN RECEIPT REQUESTED Ken Noland, Town Manager Town of Wilkesboro 203 West Main St. Wilkesboro, NC 28697 Re: Section 401 Water Quality Certification application Dear Mr. Noland: November 18, 2010 DWQ# 10-0852 Wilkes County On October 18, 2010, the North Carolina Division of Water Quality (Division) received a copy of your application for a 401 General Water Quality Certification to temporarily impact 20 feet of Moravian Creek for the Wilkes Community College Sewer Replacement Project in Wilkesboro, NC in Wilkes County. Additional information is required in order that we may determine your project's compliance with 15A NCAC 2H.0500. The Division will require this information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, we will place this project on hold as incomplete until we receive this additional information, and if we do not receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H.0506. Please provide the following information so that we may continue to review your project. Per the requirements of GC 3819, all work must be done "in the dry". Therefore, dewatering methods will be necessary to temporarily de-water the stream channel during pipe installation. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. Please provide a construction sequence and details (plans/drawings) that detail the restoration of the temporary impact area upon completion of the project. Please respond in writing within 30 calendar days of the date of this letter by submitting two copies of this information; one copy should be submitted to Sue Homewood at the address on this letterhead, and one copy to Ian McMillan N. C. Division of Water Quality, Wetlands/401 Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771-46301 Customer Service: 1-877-623-6748 Internet: www.ncwaterquafity.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturallff Ken Noland DWQ# 10-0852 November 18, 2010 Page 2 of 2 This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the Division. If you have any questions, please contact me at 336-771-4964 or sue.homewood@ncdenr.gov. Sincerely, c? ? S? Sue Homewood DWQ Winston-Salem Regional Office cc: Monte Matthews, U. S. Anny Corps of Engineers, Raleigh Regulatory Field Office (via email) Ben Clawson, Municipal Engineering Services Co. PA (via email) DWQ Winston-Salem Regional Office DWQ Wetlands/401 Unit r. ~ a 1 ~t : .J a. E ~ro d•. t~,. ~ . I ~ L ~ i L 1 / / / / / ~!FC, c? ~ 7G;3 sump / / VVSTL~Wti'~S ill 5Tfli"c~r?i ^,T':.R ER,B~IC~I h r:,i.r C9 i@ :.:.e.::. HOLE / / 9 „ CO ::'i r~rrrrr:.ci-:.ii. / ~ ~~~:.i.rt.'.4r..c.r.. ® :Z,rA~ir:~r:icrr (~iil ~i•i::r:i: w TRENCH X x j EXCAVATION X X x rl pr ffi: i:•i:::::.: ~~~ppp .;~°;~.`.r:.ir. ® :Ofic$Q::i:}i::; r.~:r~.i.~iiiirri. "~i{~.ii~:~rri: PER OSHA PV~P / ~~~AAA :~:0::rFra1A::::. at7 In AD E' ~ , ~ o ®1 PROPOSED / W~. ¦ e I W MH 9A a:N ~ o_ F ~ a o / m::~: ::::;o::-::: O ~ i T.' '~!f.':.:~::::.....::: ..1~:'::::.':.~~:.:': '::N:- -T: ® ~ or-:.::::::. ::'t;;:fY: a:; M:::::::::: O I ;:;t m:: Z:;N::;;;t;::: :;t::~: A a: a.~i::: .o~:: ~ STREAM BANK / ' a~: oo STABILIZATION o::':-::_::: 1 \ I o' VAC S. . S T x x x X x I I J Y I T CONSTRUCTION SEQUENCE: SILT FENCE / I 1. OBTAIN 401 PERMIT FROM NCDER WATER QUALITY SECTION. eJ (TYP) ~ ' I 2. INSTALL CONCRETE "JERSEY°' BARRIERS TO DIVERT O CREEK FLOW TOAPPROXIMATELY % WIDTH OF EXISTING I'° CREEK CHANNEL. SEE PLAN AND DETAIL. ~ ~ ~ / ~l ~ ~ ~ ~ o ~ ~ ~O ~ O ~ . ~ ~ ~ l~ ~ c1- USE .SA r{ ,,gym ~+C.p_ ~y~ , a a ~Ar.~w~+ ®,.a~p. ~ _ . 1D~e4. i~ T® ii G„YiL S.f. ~ A~i.. +,~e .-i~.. n*.T a7 3~~ ~i:^rf~.f11EY'a STILLING BASIN / ~ ~ ~ ~ ~ WALLS. WITH OUTLET ~ o> 4. DIG SUMP HOLE FOR SUMP PUMP(S) FOR THE PURPOSE OF DE-WATERING THE WORK AREA. MATERIAL EXCAVATED PIPE ~ i ' FOR SUMP SHALL BE PLACED OUT OF THE CREEK CHANNEL AND AWAY FROM EDGE OF BANK. a M 5. PLACE SUMP PUMP(S) IN SUMP AND DISCHARGE TO PERMEABLE STILLING BASIN UPON BANK. SEE PLAN & DETAIL. M STONE DRAIN o ex. edge 6. DE-WATER WORI(AREA. of creek 0 8„ 7. CHECK STILLING BASIN TO ENSURE IT IS OF SUFFICIENT MAX. FOR SIZE TO TREAT SUMP PUMP DISCHARGE. ENLARGE AS SPACER EARTH DIKE NECESSARY. 8. INSTALL SANITARY SEWER I IN LIMITS OF DRY WORK AREA ~ PLUG END OF MAIN. NTS I 0 9. BACKFILL NEW SANITARY S R MAIN IN CREEKBED ~ o WITH SUITA~LE'BACKFILL MATERIAL IN ACCORDANCE WITH o 8" PIPE FOR THE PROJECT SPECIFICATIONS. 4'•0" OVERDRAW 10. PERFORM THE STREAMBANK REPAIR PER DETAIL. ALL ° CLASS "B" RIP-RAP ex. ground surface .1 COMPACTED EARTH AREAS OF STREAMBANK REPAIR SHALL BE LINED WITH tTH PERMEABLE MIIFI 500-X STABILIZATION FABRIC OR APPROVED EQUAL. IAL STONE DRAIN ~ (MIN. IH~~ THICK) MATERIAL IL I VIEW 11. PLACE LARGE RIP-RAP (NCDOT CLASS 1 S 2) AT BASE ~ ~ AND 5 UP STREAMBANK, 30 THICK, REMAINDER OF ~ CL a STREAMBANK SHALL BE LINED WITH CDOT CLASS B o 3 . CLASS "1&2" RIP-RAP MIX RIP-RAP MINIMUM 18'° THICK. ALL RIP-RAP SHALL BE Z COMPACTED WITH THE BUCKET OF A TRACK HOE UNTIL ~ N COMPACTED ~ (MIN. 30" THICK) ~J; G~ BACKFILL. l ~ ' ~ SOLID. HAND PLACEMENT MAY NECESSARY iN SOME NTS AREAS. 12. REMOVE ANY SOIL STOCKPILES, FILL STILLING BASIN ~ ex. stream bed AND SEED AND MULCH ALL DISTURBED AREAS ACCORDING \~~~~iisddd~~, TO PROJECT SPECIFICATIONS. MIRIFI 500-X STABILIZATION FABRIC OR i~ ~ , APPROVED EQ~IAL ~ 5~ ° o~ ~ 13. OVE ALL EQUIPMENT T THE SIDE OF CREEK. m ~ ~ ~ ° ~ SEAL 9~ : ~ (WEST) ~1~ ~ \ 1 ° ~ 14. REPEAT STEPS 1.13 IN ORDER T COMPLETE THE ~`~%~~~d~~°~ °~,~.P~~` INSTALLATION OF THE SANITARY ER MAIN CROSSING, Q ~ ~ TEMPORARY PLUG UNT g 18" HDPE J FROM WEST END ~~1dddlll~I~L~~~'`V SCALE. NTS DATE. 11-30-2010 v %`Rib MAIN DRWN. BY. CHKD. BY: a. CLANSON ® ~zTREAM BANF7 f is 7i' o IL IFINAL DRAWING PROJECT NUMBER TS FOR REGULATORY REVIEW ONLY G10134, 0 DRAWING NO. SHEET NO. 1 1 OF 1 , man smogs=