Loading...
HomeMy WebLinkAbout20100684 Ver 1_More Info Received_20101203McGiU A S S O C I A T E S December 2, 2010 Mr. Joseph Gyamfi, PE North Carolina Department of Environment and Natural Resources Division of Water Quality 401/Express Permitting Unit 2321 Crabtree Boulevard Raleigh, North Carolina 27604 I-_ I J? 9f) @ c ?G 10 bul KETLAI,"E'SEAAMDIt'rF-R QUALITY RE: Stormwater Review Foothills Commerce Center - Phase One Cleveland County, North Carolina Dear Mr. Gyamfi: Please find attached the Stormwater Plan and calculations for the proposed Foothills Commerce Center - Phase One on Artee Road in Cleveland County for review. We have only enclosed plan sheets that were revised to reflect the proposed stormwater measures to be constructed as part of Phase One of this project. Sheets C-101 and C-701 show the stormwater measures that would be constructed in the future if the conceptual plan was followed to buildout. Please contact Becky Johnson, PE, or me if you have any questions or concerns. Sincerely, McGILL ASSOCIATES, P.A. Tv ?' ?V?-VA- RHONDA H. HONEYCUTT, El Engineering Associate Enclosures cc: Mr. Rick Howell, City of Shelby (w/ enclosures) Mr. Brad Cornwell, City of Shelby (w/ enclosures) Mr. Dale Pennell, PE, McGill Associates, P.A. P:\2009\09.00116\Letters\j g02dec l O.docx E n g i n e e r i n g • P l a n n i n g • F i n a n c e McGill Associates, P.A. - P. 0. Box 2259, Asheville, NC 28802 - 55 Broad Street, Asheville, NC 28801 828-252-0575 - Fax: 828-252-2518 L 2c'f j ATA DEW 7,OLr NCDENR Permit No. I D- O (0 8 4 (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. W A TF9pG O Niii? 'r I. PROJECT INFORMATION Project name Foothills Commerce Center - Phase One Contact person Brad Cornwell - City of Shelby - Public Utilities Director Phone number (704) 484-6840 Date 16-Nov-10 Drainage area number 1 il:' DESIGN INFORMATION Site Characteristics Drainage area 962,240 ft2 Impervious area, post-development 201,012 ft2 % impervious 20.89 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 19,085 ft3 OK 33,326 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 (Y or N) 3.1 in 0.30 (unitless) 043 (unitless) 0.13 in/hr OK 0.86 ft3/sec 24 ft3/sec 0.38 ft3/sec 809.50 fmsl 807.50 fmsl 807.50 fmsl 808.00 fmsl 807.00 fmsl 802.90 fmsl 801.90 fmsl 1.00 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) If. DESIGN MIR MATION Surface Areas Area, temporary pool 19,322 ftz Area REQUIRED, permanent pool 12,990 ftz SA/DA ratio 1.35 (unitless) Area PROVIDED, permanent pool, Apeonyoo, 13,053 ft OK Area, bottom of 1 Oft vegetated shelf, AW shelf 10,736 ft Area, sediment cleanout, top elevation (bottom of pond), Abotyond 5,800 ft` Volumes Volume, temporary pool 33,326 ft3 OK Volume, permanent pool, Vpermyod 42,200 ft3 Volume, forebay (sum of forebays if more than one forebay) 11,178 ft3 Forebay % of permanent pool volume 26.5% % Insufficient forebay volume. SA/DA Table Data Design TSS removal 90 % Coastal SA/DA Table Used? N (Y or N) Mountain/Piedmont SA/DA Table Used? Y (Y or N) SA/DA ratio 1.35 (unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vpenpod 42,200 ft3 Area provided, permanent pool, Aperm-pcd 13,053 ft` Average depth calculated ft Need 3 ft min. Average depth used in SA/DA, da,, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Aperm_pW 13,053 ft` Area, bottom of 1Oft vegetated shelf, Abot shelf 10,736 ft` Area, sediment cleanout, top elevation (bottom of pond), Abotyond 5,800 ftz "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 4.10 ft Average depth calculated 3.61 ft OK Average depth used in SA/DA, da,, (Round to nearest 0.5ft) 3.5 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 4.50 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 1.90 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C.) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 0.86 ft3/sec Post-development 1-yr, 24-hr peak flow 1.24 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.73 ft3/sec Storage volume drawdown time 2.08 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Portable pump Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) 111. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initia s Sheet No. C-108 1. Plans (1" - 50' or larger) of the entire site showing: C-701 Design at ultimate build-out, Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, - Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. $AN C 508 " ' - 2. Partial plan (1 = 30 or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and -Filter strip. T&L -" " ' 9- C-508 3. Section view of the wet detention basin (1 = 20 or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. N/A 4 If h . t e basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. Att h d 5 A bl f l ac e . ta e o e evations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. C-509 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. Attached 7. The supporting calculations. Att h d 8 ac e . A copy of the signed and notarized operation and maintenance (0&M) agreement. N/A 9. A copy of the deed restrictions (if required). Attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 W z W Q 2 0. W U) F- Q zm wz U o w Z W F- W O? U W N ? J J_ 2 F- O U. 'a tam E 11 I ? '1 II I !I '; II 'I I 00 ',011(0,r'LO o U? oo .0 In OI O'O CV'CAltf)'CO ?p 0,010 0100 O1O O OI OIO OO 3 V 0 , , O,O U' 0) U7 N O C), C) C) C) 9'q C? 010 O,91O'1O'IO O ,N p p CM Ll Cl p'cl C:) ' ' -- N I I i IO OI,p,p a,OlO O1O,O,O 1O > U U CO IN CA U-) LC) M O I a 1 j?,? 1;11 - l? C 4i M CD I LO 11.0 Lf) 1 U) I CV II C4 CD O a1 E 0 ) OIOIOIcpICV1OIp'p 0 0 0 0 0 0 0 0 0 0 0 o'O'1O''O I ' F- V 01O1?100? ,I r,- O O O 0 0 0 0 0 0 0 0 0 0 CD 0 m 0 V > O O N'Olp 0 0 0 0 O O O O O 0 0 0 0 O O ?IM,C(??IN C - NI Ii I', ? 1 ?INII (D N L 'g;r m cc y I M U) M M (A Nl001O O 0,010 O'1O0:010 0 0 0 0 0 o O N CpIC?jII? C 1 m U I 0 0 0 0 0 O M M U) N1I?-IO;O,O1O1O O OIIOIO 9i9 O O Q LQ C'')'O ' ' ' I I'- 7 Q M O O O OIO O OIO O, O,O - O,O O IO (/? I O O C) LO I CA r I I a r CU E IIiII' IIIIIIIIII I I IN'N,U) M'qT1 I O CY) CY) C4 C, O II O II O? C\1 1 co 06 O O v 7 0 O O OINIT- IO'q. M' C) C) TIn C, -- IC `7 d'IM N V> V ? I T'- In N II C") (Y) -TIO 00, Q I III ? L V O ' O N 0'M [I- N C .R ta m I o ti o co oo0CD ??li m o U > plpjl%?iI o rn 00 of-;m - o C - M N I V O Lf)I'1U) r-,In tiI O T C`7'PO T7'' 7 Q 0;o 00 ? M M,T-CID I'T O O,c CY0 O M'O 00, U) Lf CIS I r- Cr) U7 r CO m 00 r L0 In r-- dO''ti M, ? 1 0 O 0 3 E V ti m r- In 0 p CC) N 00 ti Cfl C) C) m 00 (7) tU L r d E r CM 00 M N C? 0 M t! ) O O O I 0 0 0 -- LL E 7 V m O 0 0 9 19 c.61Nl(:6 ,t O'OIO1o'? O'N 00 C? CAT- iI ch I , CV V t6 1 0) P- 0 rnP_ 0100 r U) N O'O 'p -1 ` y Q , ,p O O O O o co 00 C) NIA ti fA t r N 'CV M ICh 0 II I I I '?,? o O OOO1O'O O y , .Of),O,,Cn U), ? > E w - N N ti ti 0010) O O 0 0 0 0 0 O :T- . 4) - 00 00 00 00 CC) W O N N M N O u 0 y W d ?F UU o h H d 0 CLO mCL CL D 1 Wet Basin 1 ?S ubcat) Reach Pon Link Drainage Diagram for WetBasinl Prepared by {enter your company name here}, Printed 11/19/2010 HydroCAD® 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC WetBasinl Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 11/19/2010 HydroCAD@ 8.50 s/n 004263 02007 HydroCAD Software Solutions LLC Page 2 Time span=0.00-120.00 hrs, dt=0.04 hrs, 3001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA 1 Runoff Area=22.085 ac 20.87% Impervious Runoff Depth=1.26" Tc=5.0 min CN=79 Runoff=51.15 cfs 2.323 of Pond 2P: Wet Basin 1 Peak Elev=809.40' Storage=73,317 cf Inflow=51.15 cfs 2.323 of Primary=0.73 cfs 1.354 of Secondary=0.00 cfs 0.000 of Outflow=0.73 cfs 1.354 of Total Runoff Area = 22.085 ac Runoff Volume = 2.323 of Average Runoff Depth = 1.26" 79.13% Pervious= 17.475 ac 20.87% Impervious = 4.610 ac WetBasin1 Type 11 24-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 11/19/2010 HydroCAD® 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1 S: DA 1 Runoff = 51.15 cfs @ 11.96 hrs, Volume= 2.323 af, Depth= 1.26" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.04 hrs Type II 24-hr 1-Year Storm Rainfall=3.10" Area (ac) CN Description 4.610 98 Paved parking & roofs 17.475 74 >75% Grass cover, Good, HSG C 22.085 79 Weighted Average 17.475 Pervious Area 4.610 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: DA 1 Hydrograph ? Runoff 50- Type II 24-hr 1-Year Storm 45 Rainfall=3.10" 40- Runoff Area=22.085 ac Runoff Volume=2.323 af . 35 y Runoff Depth=1.26" 30 Tc=5.0 min M 25- CN=79 15 . 10" 5- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) WetBasin1 Type 11 24-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 11/19/2010 HydroCAD® 8.50 s/n 004263 02007 HydroCAD Software Solutions LLC Page 4 Hydrograph for Subcatchment 1 S: DA 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.07 0.00 0.00 4.00 0.15 0.00 0.00 6.00 0.25 0.00 0.00 8.00 0.37 0.00 0.00 10.00 0.56 0.00 0.04 12.00 2.06 0.56 45.09 14.00 2.54 0.87 1.79 16.00 2.73 0.99 1.14 18.00 2.86 1.08 0.90 20.00 2.95 1.15 0.66 22.00 3.03 1.21 0.61 24.00 3.10 1.26 0.56 26.00 3.10 1.26 0.00 28.00 3.10 1.26 0.00 30.00 3.10 1.26 0.00 32.00 3.10 1.26 0.00 34.00 3.10 1.26 0.00 36.00 3.10 1.26 0.00 38.00 3.10 1.26 0.00 40.00 3.10 1.26 0.00 42.00 3.10 1.26 0.00 44.00 3.10 1.26 0.00 46.00 3.10 1.26 0.00 48.00 3.10 1.26 0.00 50.00 3.10 1.26 0.00 52.00 3.10 1.26 0.00 54.00 3.10 1.26 0.00 56.00 3.10 1.26 0.00 58.00 3.10 1.26 0.00 60.00 3.10 1.26 0.00 62.00 3.10 1.26 0.00 64.00 3.10 1.26 0.00 66.00 3.10 1.26 0.00 68.00 3.10 1.26 0.00 70.00 3.10 1.26 0.00 72.00 3.10 1.26 0.00 74.00 3.10 1.26 0.00 76.00 3.10 1.26 0.00 78.00 3.10 1.26 0.00 80.00 3.10 1.26 0.00 82.00 3.10 1.26 0.00 84.00 3.10 1.26 0.00 86.00 3.10 1.26 0.00 88.00 3.10 1.26 0.00 90.00 3.10 1.26 0.00 92.00 3.10 1.26 0.00 94.00 3.10 1.26 0.00 96.00 3.10 1.26 0.00 98.00 3.10 1.26 0.00 100.00 3.10 1.26 0.00 102.00 3.10 1.26 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 104.00 3.10 1.26 0.00 106.00 3.10 1.26 0.00 108.00 3.10 1.26 0.00 110.00 3.10 1.26 0.00 112.00 3.10 1.26 0.00 114.00 3.10 1.26 0.00 116.00 3.10 1.26 0.00 118.00 3.10 1.26 0.00 120.00 3.10 1.26 0.00 WetBasin1 Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 11/19/2010 HydroCADO 8.50 s/n 004263 02007 HydroCAD Software Solutions LLC Page 5 Summary for Pond 2P: Wet Basin 1 Inflow Area = 22.085 ac, 20.87% Impervious, Inflow Depth = 1.26" for 1-Year Storm event Inflow = 51.15 cfs @ 11.96 hrs, Volume= 2.323 of Outflow = 0.73 cfs @ 19.41 hrs, Volume= 1.354 af, Atten= 99%, Lag= 446.7 min Primary = 0.73 cfs @ 19.41 hrs, Volume= 1.354 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.04 hrs / 4 Peak Elev= 809.40'@ 19.41 hrs Surf.Area= 18,773 sf Storage= 73,317 cf Plug-Flow detention time= 776.0 min calculated for 1.354 of (58% of inflow) Center-of-Mass det. time= 653.0 min ( 1,496.4 - 843.4 ) Volume Invert Avail.Storage Storage Description #1 802.50' 106,164 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 802.50 0 0 0 802.90 6,330 1,266 1,266 807.00 10,736 34,985 36,251 807.50 13,053 5,947 42,199 808.00 15,571 7,156 49,355 810.00 20,161 35,732 85,087 810.50 21,046 10,302 95,388 811.00 22,055 10,775 106,164 Device Routing Invert Outlet Devices #1 Device 3 806.00' 18.0" Vert. Orifice/Grate C= 0.600 #2 Primary 807.50' 4.5" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 809.50' 24.0" Vert. Orifice/Grate C= 0.600 #4 Secondary 809.90' 5.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.73 cfs @ 19.41 hrs HW=809.40' (Free Discharge) L2=Orifice/Grate (Orifice Controls 0.73 cfs @ 6.63 fps) Orifice/Grate ( Controls 0.00 cfs) 1=Orifice/Grate ( Controls 0.00 cfs) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=802.50' (Free Discharge) =Broad-Crested Rectangular Weir ( Controls 0.00 cfs) WetBasinl Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 11/19/2010 HydroCAD(D8.50 s/n 004263 @2007 HydroCAD Software Solutions LLC Page 6 Pond 2P: Wet Basin 1 Hydrograph ¦ Inflow ? Outflow ® Primary ¦ Secondary N U 3 O li Pond 2P: Wet Basin 1 Stage-Discharge ? Total Primary ¦ Secondary m m c O m W 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 0 5 10 15 20 25 30 35 Discharge (cfs) WetBasin1 Type 11 24-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 11/19/2010 HydroCAD® 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 7 Pond 2P: Wet Basin 1 Stage-Area-Storage Surface/Florizontal/Wetted Area (sq-ft) d d c 0 a? w 100 0 Surface 0 Storage 0 20,000 40,000 60,000 80,000 100,000 Storage (cubic-feet) WetBasin1 Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 11/19/2010 HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 8 Hydrograph for Pond 2P: Wet Basin 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 802.50 0.00 0.00 0.00 4.00 0.00 0 802.50 0.00 0.00 0.00 8.00 0.00 0 802.50 0.00 0.00 0.00 12.00 45.09 35,081 806.89 0.00 0.00 0.00 16.00 1.14 70,783 809.26 0.71 0.71 0.00 20.00 0.66 73,244 809.39 0.73 0.73 0.00 24.00 0.56 71,602 809.30 0.71 0.71 0.00 28.00 0.00 62,259 808.78 0.60 0.60 0.00 32.00 0.00 54,447 808.32 0.48 0.48 0.00 36.00 0.00 48,434 807.94 0.35 0.35 0.00 40.00 0.00 44,370 807.66 0.20 0.20 0.00 44.00 0.00 42,802 807.55 0.04 0.04 0.00 48.00 0.00 42,456 807.52 0.02 0.02 0.00 52.00 0.00 42,309 807.51 0.01 0.01 0.00 56.00 0.00 42,246 807.50 0.00 0.00 0.00 60.00 0.00 42,219 807.50 0.00 0.00 0.00 64.00 0.00 42,207 807.50 0.00 0.00 0.00 68.00 0.00 42,202 807.50 0.00 0.00 0.00 72.00 0.00 42,200 807.50 0.00 0.00 0.00 76.00 0.00 42,199 807.50 0.00 0.00 0.00 80.00 0.00 42,199 807.50 0.00 0.00 0.00 84.00 0.00 42,199 807.50 0.00 0.00 0.00 88.00 0.00 42,199 807.50 0.00 0.00 0.00 92.00 0.00 42,199 807.50 0.00 0.00 0.00 96.00 0.00 42,199 807.50 0.00 0.00 O.QO 100.00 0.00 42,199 807.50 0.00 0.00 0.00 104.00 0.00 42,199 807.50 0.00 0.00 0.00 108.00 0.00 42,199 807.50 0.00 0.00 0.00 112.00 0.00 42,199 807.50 0.00 0.00 0.00 116.00 0.00 42,199 807.50 0.00 0.00 0.00 120.00 0.00 42,199 807.50 0.00 0.00 0.00 WetBasinl Type 11 24-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 11/19/2010 HydroCAD® 8.50 s/n 004263 02007 HydroCAD Software Solutions LLC Page 9 Stage-Discharge for Pond 2P: Wet Basin 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 802.50 0.00 0.00 0.00 802.60 0.00 0.00 0.00 802.70 0.00 0.00 0.00 802.80 0.00 0.00 0.00 802.90 0.00 0.00 0.00 803.00 0.00 0.00 0.00 803.10 0.00 0.00 0.00 803.20 0.00 0.00 0.00 803.30 0.00 0.00 0.00 803.40 0.00 0.00 0.00 803.50 0.00 0.00 0.00 803.60 0.00 0.00 0.00 803.70 0.00 0.00 0.00 803.80 0.00 0.00 0.00 803.90 0.00 0.00 0.00 804.00 0.00 0.00 0.00 804.10 0.00 0.00 0.00 804.20 0.00 0.00 0.00 804.30 0.00 0.00 0.00 804.40 0.00 0.00 0.00 804.50 0.00 0.00 0.00 804.60 0.00 0.00 0.00 804.70 0.00 0.00 0.00 804.80 0.00 0.00 0.00 804.90 0.00 0.00 0.00 805.00 0.00 0.00 0.00 805.10 0.00 0.00 0.00 805.20 0.00 0.00 0.00 805.30 0.00 0.00 0.00 805.40 0.00 0.00 0.00 805.50 0.00 0.00 0.00 805.60 0.00 0.00 0.00 805.70 0.00 0.00 0.00 805.80 0.00 0.00 0.00 805.90 0.00 0.00 0.00 806.00 0.00 0.00 0.00 806.10 0.00 0.00 0.00 806.20 0.00 0.00 0.00 806.30 0.00 0.00 0.00 806.40 0.00 0.00 0.00 806.50 0.00 0.00 0.00 806.60 0.00 0.00 0.00 806.70 0.00 0.00 0.00 806.80 0.00 0.00 0.00 806.90 0.00 0.00 0.00 807.00 0.00 0.00 0.00 807.10 0.00 0.00 0.00 807.20 0.00 0.00 0.00 807.30 0.00 0.00 0.00 807.40 0.00 0.00 0.00 807.50 0.00 0.00 0.00 807.60 0.12 0.12 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 807.70 0.24 0.24 0.00 807.80 0.29 0.29 0.00 807.90 0.34 0.34 0.00 808.00 0.38 0.38 0.00 808.10 0.41 0.41 0.00 808.20 0.44 0.44 0.00 808.30 0.48 0.48 0.00 808.40 0.50 0.50 0.00 808.50 0.53 0.53 0.00 808.60 0.56 0.56 0.00 808.70 0.58 0.58 0.00 808.80 0.61 0.61 0.00 808.90 0.63 0.63 0.00 809.00 0.65 0.65 0.00 809.10 0.67 0.67 0.00 809.20 0.69 0.69 0.00 809.30 0.71 0.71 0.00 809.40 0.73 0.73 0.00 809.50 0.75 0.75 0.00 809.60 0.83 0.83 0.00 809.70 1.04 1.04 0.00 809.80 1.36 1.36 0.00 809.90 1.79 1.79 0.00 810.00 2.74 2.32 0.42 810.10 4.15 2.95 1.20 810.20 5.88 3.67 2.21 810.30 7.88 4.46 3.42 810.40 10.11 5.33 4.77 810.50 12.54 6.27 6.27 810.60 15.08 7.26 7.82 810.70 17.74 8.29 9.45 810.80 20.61 9.36 11.25 810.90 23.59 10.44 13.15 811.00 26.62 11.42 15.20 811.10 29.12 11.77 17.35 811.20 31.68 12.12 19.57 811.30 34.32 12.45 21.87 811.40 36.98 12.78 24.20 811.50 39.71 13.10 26.61 WetBasin1 Type 11 24-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 11/19/2010 HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 10 Stage-Area-Storage for Pond 2P: Wet Basin 1 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 802.50 0 0 802.60 1,583 79 802.70 3,165 317 802.80 4,747 712 802.90 6,330 1,266 803.00 6,437 1,904 803.10 6,545 2,553 803.20 6,652 3,213 803.30 6,760 3,884 803.40 6,867 4,565 803.50 6,975 5,257 803.60 7,082 5,960 803.70 7,190 6,674 803.80 7,297 7,398 803.90 7,405 8,133 804.00 7,512 8,879 804.10 7,620 9,636 804.20 7,727 10,403 804.30 7,834 11,181 804.40 7,942 11,970 804.50 8,049 12,770 804.60 8,157 13,580 804.70 8,264 14,401 804.80 8,372 15,233 804.90 8,479 16,075 805.00 8,587 16,929 805.10 8,694 17,793 805.20 8,802 18,667 805.30 8,909 19,553 805.40 9,017 20,449 805.50 9,124 21,356 805.60 9,232 22,274 805.70 9,339 23,203 805.80 9,446 24,142 805.90 9,554 25,092 806.00 9,661 26,053 806.10 9,769 27,024 806.20 9,876 28,006 806.30 9,984 28,999 806.40 10,091 30,003 806.50 10,199 31,018 806.60 10,306 32,043 806.70 10,414 33,079 806.80 10,521 34,126 806.90 10,629 35,183 807.00 10,736 36,251 807.10 11,199 37,348 807.20 11,663 38,491 807.30 12,126 39,681 807.40 12,590 40,916 807.50 13,053 42,199 807.60 13,557 43,529 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 807.70 14,060 44,910 807.80 14,564 46,341 807.90 15,067 47,823 808.00 15,571 49,355 808.10 15,801 50,923 808.20 16,030 52,515 808.30 16,259 54,129 808.40 16,489 55,767 808.50 16,719 57,427 808.60 16,948 59,110 808.70 17,178 60,817 808.80 17,407 62,546 808.90 17,636 64,298 809.00 17,866 66,073 809.10 18,096 67,871 809.20 18,325 69,692 809.30 18,554 71,536 809.40 18,784 73,403 809.50 19,014 75,293 809.60 19,243 77,206 809.70 19,473 79,142 809.80 19,702 81,100 809.90 19,931 83,082 810.00 20,161 85,087 810.10 20,338 87,112 810.20 20,515 89,154 810.30 20,692 91,214 810.40 20,869 93,293 810.50 21,046 95,388 810.60 21,248 97,503 810.70 21,450 99,638 810.80 21,651 101,793 810.90 21,853 103,968 811.00 22,055 106,164 811.10 22,055 106,164 811.20 22,055 106,164 811.30 22,055 106,164 811.40 22,055 106,164 811.50 22,055 106,164 WetBasinl Type 1124-hr 10-Year Storm Rainfall=5.41 " Prepared by {enter your company name here} Printed 11/19/2010 HydroCAD@ 8.50 s/n 004263 @2007 HydroCAD Software Solutions LLC Page 11 Time span=0.00-120.00 hrs, dt=0.04 hrs, 3001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA 1 Runoff Area=22.085 ac 20.87% Impervious Runoff Depth=3.16" Tc=5.0 min CN=79 Runoff=125.89 cfs 5.812 of Pond 2P: Wet Basin 1 Peak Elev=811.00' Storage=106,142 cf Inflow=125.89 cfs 5.812 of Primary=11.41 cfs 3.421 of Secondary=15.18 cfs 1.138 of Outflow=26.59 cfs 4.559 of Total Runoff Area = 22.085 ac Runoff Volume = 5.812 of Average Runoff Depth = 3.16" 79.13% Pervious= 17.475 ac 20.87% Impervious= 4.610 ac WetBasin1 Type 1124-hr 10-Year Storm Rainfall=5.41" Prepared by {enter your company name here} Printed 11/19/2010 HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 1 S: DA 1 Runoff = 125.89 cfs @ 11.96 hrs, Volume= 5.812 af, Depth= 3.16" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.04 hrs Type II 24-hr 10-Year Storm Rainfall=5.41" Area (ac) CN Description 4.610 98 Paved parking & roofs 17.475 74 >75% Grass cover, Good, HSG C 22.085 79 Weighted Average 17.475 Pervious Area 4.610 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: DA 1 Hydrograph 140 Runoff 130 125.89 cfs 120 Type II 24-hr 10=Year Storm 110 _ Rainfall=5.41,. 100 Runoff Area=22.085 ac 90 _ Runoff Volume=5.812 of 80Runoff Depth=3.16' 70 Tc=5.0 min LL 60 CN=79 50- 40- 30 20 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) WetBasinl Type 1124-hr 10-Year Storm Rainfall=5.41" Prepared by {enter your company name here} Printed 11/19/2010 HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 13 Hydrograph for Subcatchment 1 S: DA 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.12 0.00 0.00 4.00 0.26 0.00 0.00 6.00 0.43 0.00 0.00 8.00 0.65 0.00 0.20 10.00 0.98 0.06 1.21 12.00 3.59 1.63 107.93 14.00 4.44 2.32 3.88 16.00 4.76 2.60 2.41 18.00 4.98 2.79 1.88 20.00 5.15 2.93 1.38 22.00 5.29 3.05 1.26 24.00 5.41 3.16 1.16 26.00 5.41 3.16 0.00 28.00 5.41 3.16 0.00 30.00 5.41 3.16 0.00 32.00 5.41 3.16 0.00 34.00 5.41 3.16 0.00 36.00 5.41 3.16 0.00 38.00 5.41 3.16 0.00 40.00 5.41 3.16 0.00 42.00 5.41 3.16 0.00 44.00 5.41 3.16 0.00 46.00 5.41 3.16 0.00 48.00 5.41 3.16 0.00 50.00 5.41 3.16 0.00 52.00 5.41 3.16 0.00 54.00 5.41 3.16 0.00 56.00 5.41 3.16 0.00 58.00 5.41 3.16 0.00 60.00 5.41 3.16 0.00 62.00 5.41 3.16 0.00 64.00 5.41 3.16 0.00 66.00 5.41 3.16 0.00 68.00 5.41 3.16 0.00 70.00 5.41 3.16 0.00 72.00 5.41 3.16 0.00 74.00 5.41 3.16 0.00 76.00 5.41 3.16 0.00 78.00 5.41 3.16 0.00 80.00 5.41 3.16 0.00 82.00 5.41 3.16 0.00 84.00 5.41 3.16 0.00 86.00 5.41 3.16 0.00 88.00 5.41 3.16 0.00 90.00 5.41 3.16 0.00 92.00 5.41 3.16 0.00 94.00 5.41 3.16 0.00 96.00 5.41 3.16 0.00 98.00 5.41 3.16 0.00 100.00 5.41 3.16 0.00 102.00 5.41 3.16 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 104.00 5.41 3.16 0.00 106.00 5.41 3.16 0.00 108.00 5.41 3.16 0.00 110.00 5.41 3.16 0.00 112.00 5.41 3.16 0.00 114.00 5.41 3.16 0.00 116.00 5.41 3.16 0.00 118.00 5.41 3.16 0.00 120.00 5.41 3.16 0.00 WetBasin1 Type // 24-hr 10-Year Storm Rainfal1=541" Prepared by {enter your company name here) Printed 11/19/2010 HydroCAD6 8.50 s/n 004263 @2007 HydroCAD Software Solutions LLC Page 14 Summary for Pond 2P: Wet Basin 1 Inflow Area = 22.085 ac, 20.87% Impervious, Inflow Depth = 3.16" for 10-Year Storm event Inflow = 125.89 cfs @ 11.96 hrs, Volume= 5.812 of Outflow = 26.59 cfs @ 12.11 hrs, Volume= 4.559 af, Atten= 79%, Lag= 8.8 min Primary = 11.41 cfs @ 12.11 hrs, Volume= 3.421 of Secondary = 15.18 cfs @ 12.11 hrs, Volume= 1.138 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.04 hrs / 4 Peak Elev= 811.00' @ 12.11 hrs Surf.Area= 22,053 sf Storage= 106,142 cf Plug-Flow detention time= 377.7 min calculated for 4.557 of (78% of inflow) Center-of-Mass det. time= 292.1 min ( 1,109.1 - 817.0 ) Volume Invert Avail.Storage Storage Description #1 802.50' 106,164 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 802.50 0 0 0 802.90 6,330 1,266 1,266 807.00 10,736 34,985 36,251 807.50 13,053 5,947 42,199 808.00 15,571 7,156 49,355 810.00 20,161 35,732 85,087 810.50 21,046 10,302 95,388 811.00 22,055 10,775 106,164 Device Routing Invert Outlet Devices #1 Device 3 806.00' 18.0" Vert. Orifice/Grate C= 0.600 #2 Primary 807.50' 4.5" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 809.50' 24.0" Vert. Orifice/Grate C= 0.600 #4 Secondary 809.90' 5.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=11.40 cfs @ 12.11 hrs HW=810.99' (Free Discharge) 2=Orifice/Grate (Orifice Controls 0.99 cfs @ 9.00 fps) Orifice/Grate (Passes 10.40 cfs of 10.48 cfs potential flow) 1=Orifice/Grate (Orifice Controls 10.40 cfs @ 5.89 fps) econdary OutFlow Max=15.09 cfs @ 12.11 hrs HW=810.99' (Free Discharge) =Broad-Crested Rectangular Weir (Weir Controls 15.09 cfs @ 2.76 fps) WetBasin1 Type 1124-hr 10-Year Storm Rainfall=5.41 " Prepared by {enter your company name here} Printed 11/19/2010 HydroCADO 8.50 s/n 004263 0 2007 HydroCAD Software Solutions LLC Page 15 Pond 2P: Wet Basin 1 Hydrograph 1 1 1 1 1 N V 3 O LL Pond 2P: Wet Basin 1 Stage-Discharge m d c 0 m W ¦ Inflow 0 Outflow 0 Primary ¦ Secondary 0 Total 0 Primary ® Secondary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 0 20 40 60 80 100 120 140 Discharge (cfs) WetBasin1 Type 11 24-hr 10-Year Storm Rainfall=5.41" Prepared by {enter your company name here} Printed 11/19/2010 HydroCADO 8.50 s/n 004263 @2007 HydroCAD Software Solutions LLC Page 16 Pond 2P: Wet Basin 1 Stage-Area-Storage Surface/HorizontaLYNetted Area (sq-ft) m m c 0 w w Q Surface ® Storage 0 20,000 40,000 60,000 80,000 100,000 Storage (cubic-feet) WetBasin1 Type 1124-hr 10-Year Storm Rainfall=5.41" Prepared by {enter your company name here} Printed 11/19/2010 HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 17 Hydrograph for Pond 2P: Wet Basin 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 802.50 0.00 0.00 0.00 4.00 0.00 0 802.50 0.00 0.00 0.00 8.00 0.20 341 802.70 0.00 0.00 0.00 12.00 107.93 105,632 810.98 25.92 11.22 14.70 16.00 2.41 85,030 810.00 2.71 2.30 0.41 20.00 1.38 82,356 809.86 1.62 1.62 0.00 24.00 1.16 80,482 809.77 1.25 1.25 0.00 28.00 0.00 69,201 809.17 0.69 0.69 0.00 32.00 0.00 60,118 808.66 0.57 0.57 0.00 36.00 0.00 52,751 808.21 0.45 0.45 0.00 40.00 0.00 47,212 807.86 0.32 0.32 0.00 44.00 0.00 43,706 807.61 0.15 0.15 0.00 48.00 0.00 42,681 807.54 0.03 0.03 0.00 52.00 0.00 42,406 807.52 0.01 0.01 0.00 56.00 0.00 42,288 807.51 0.01 0.01 0.00 60.00 0.00 42,237 807.50 0.00 0.00 0.00 64.00 0.00 42,215 807.50 0.00 0.00 0.00 68.00 0.00 42,206 807.50 0.00 0.00 0.00 72.00 0.00 42,202 807.50 0.00 0.00 0.00 76.00 0.00 42,200 807.50 0.00 0.00 0.00 80.00 0.00 42,199 807.50 0.00 0.00 0.00 84.00 0.00 42,199 807.50 0.00 0.00 0.00 88.00 0.00 42,199 807.50 0.00 0.00 0.00 92.00 0.00 42,199 807.50 0.00 0.00 0.00 96.00 0.00 42,199 807.50 0.00 0.00 0.00 100.00 0.00 42,199 807.50 0.00 0.00 0.00 104.00 0.00 42,199 807.50 0.00 0.00 0.00 108.00 0.00 42,199 807.50 0.00 0.00 0.00 112.00 0.00 42,199 807.50 0.00 0.00 0.00 116.00 0.00 42,199 807.50 0.00 0.00 0.00 120.00 0.00 42,199 807.50 0.00 0.00 0.00 WetBasin1 Type// 24-hr 10-Year Storm Rainfall=5.41" Prepared by {enter your company name here} Printed 11/19/2010 HydroCAD® 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 18 Stage-Discharge for Pond 2P: Wet Basin 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 802.50 0.00 0.00 0.00 802.65 0.00 0.00 0.00 802.80 0.00 0.00 0.00 802.95 0.00 0.00 0.00 803.10 0.00 0.00 0.00 803.25 0.00 0.00 0.00 803.40 0.00 0.00 0.00 803.55 0.00 0.00 0.00 803.70 0.00 0.00 0.00 803.85 0.00 0.00 0.00 804.00 0.00 0.00 0.00 804.15 0.00 0.00 0.00 804.30 0.00 0.00 0.00 804.45 0.00 0.00 0.00 804.60 0.00 0.00 0.00 804.75 0.00 0.00 0.00 804.90 0.00 0.00 0.00 805.05 0.00 0.00 0.00 805.20 0.00 0.00 0.00 805.35 0.00 0.00 0.00 805.50 0.00 0.00 0.00 805.65 0.00 0.00 0.00 805.80 0.00 0.00 0.00 805.95 0.00 0.00 0.00 806.10 0.00 0.00 0.00 806.25 0.00 0.00 0.00 806.40 0.00 0.00 0.00 806.55 0.00 0.00 0.00 806.70 0.00 0.00 0.00 806.85 0.00 0.00 0.00 807.00 0.00 0.00 0.00 807.15 0.00 0.00 0.00 807.30 0.00 0.00 0.00 807.45 0.00 0.00 0.00 807.60 0.12 0.12 0.00 807.75 0.27 0.27 0.00 807.90 0.34 0.34 0.00 808.05 0.39 0.39 0.00 808.20 0.44 0.44 0.00 808.35 0.49 0.49 0.00 808.50 0.53 0.53 0.00 808.65 0.57 0.57 0.00 808.80 0.61 0.61 0.00 808.95 0.64 0.64 0.00 809.10 0.67 0.67 0.00 809.25 0.70 0.70 0.00 809.40 0.73 0.73 0.00 809.55 0.78 0.78 0.00 809.70 1.04 1.04 0.00 809.85 1.56 1.56 0.00 810.00 2.74 2.32 0.42 810.15 4.97 3.30 1.68 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 810.30 7.88 4.46 3.42 810.45 11.30 5.79 5.51 810.60 15.08 7.26 7.82 810.75 19.16 8.82 10.33 810.90 23.59 10.44 13.15 811.05 27.86 11.60 16.26 811.20 31.68 12.12 19.57 811.35 35.64 12.62 23.03 811.50 39.71 13.10 26.61 811.65 44.00 13.56 30.44 811.80 48.45 14.01 34.44 811.95 53.04 14.44 38.60 812.10 57.77 14.86 42.91 812.25 62.64 15.27 47.37 812.40 67.65 15.67 51.98 812.55 72.78 16.05 56.73 812.70 78.05 16.43 61.61 812.85 83.43 16.80 66.63 813.00 88.94 17.17 71.77 813.15 94.57 17.52 77.05 813.30 100.31 17.87 82.44 813.45 106.16 18.21 87.96 813.60 112.13 18.54 93.59 813.75 118.21 18.87 99.34 813.90 124.39 19.19 105.20 814.05 130.68 19.51 111.17 814.20 137.08 19.82 117.25 814.35 143.57 20.13 123.44 814.50 150.17 20.43 129.74 WetBasinl Type 11 24-hr 10-Year Storm Rainfall=5.41 " Prepared by {enter your company name here} Printed 11/19/2010 HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 19 Stage-Area-Storage for Pond 2P: Wet Basin 1 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 802.50 0 0 802.65 2,374 178 802.80 4,747 712 802.95 6,384 1,584 803.10 6,545 2,553 803.25 6,706 3,547 803.40 6,867 4,565 803.55 7,029 5,608 803.70 7,190 6,674 803.85 7,351 7,764 804.00 7,512 8,879 804.15 7,673 10,018 804.30 7,834 11,181 804.45 7,996 12,368 804.60 8,157 13,580 804.75 8,318 14,815 804.90 8,479 16,075 805.05 8,640 17,359 805.20 8,802 18,667 805.35 8,963 20,000 805.50 9,124 21,356 805.65 9,285 22,737 805.80 9,446 24,142 805.95 9,608 25,571 806.10 9,769 27,024 806.25 9,930 28,502 806.40 10,091 30,003 806.55 10,252 31,529 806.70 10,414 33,079 806.85 10,575 34,653 807.00 10,736 36,251 807.15 11,431 37,914 807.30 12,126 39,681 807.45 12,821 41,552 807.60 13,557 43,529 807.75 14,312 45,619 807.90 15,067 47,823 808.05 15,686 50,136 808.20 16,030 52,515 808.35 16,374 54,945 808.50 16,719 57,427 808.65 17,063 59,961 808.80 17,407 62,546 808.95 17,751 65,183 809.10 18,096 67,871 809.25 18,440 70,611 809.40 18,784 73,403 809.55 19,128 76,246 809.70 19,473 79,142 809.85 19,817 82,088 810.00 20,161 85,087 810.15 20,426 88,131 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 810.30 20,692 91,214 810.45 20,958 94,338 810.60 21,248 97,503 810.75 21,551 100,713 810.90 21,853 103,968 811.05 22,055 106,164 811.20 22,055 106,164 811.35 22,055 106,164 811.50 22,055 106,164 811.65 22,055 106,164 811.80 22,055 106,164 811.95 22,055 106,164 812.10 22,055 106,164 812.25 22,055 106,164 812.40 22,055 106,164 812.55 22,055 106,164 812.70 22,055 106,164 812.85 22,055 106,164 813.00 22,055 106,164 813.15 22,055 106,164 813.30 22,055 106,164 813.45 22,055 106,164 813.60 22,055 106,164 813.75 22,055 106,164 813.90 22,055 106,164 814.05 22,055 106,164 814.20 22,055 106,164 814.35 22,055 106,164 814.50 22,055 106,164 NaMr Pmenun Green ECMDSVesim43 ? 111/19/2010 i03.25PMCOMPUUTTEDBY. RHH emmerce Center-Ph.1 --_-?-PR6IECT N0.'. E9.00116 __.._._.? PRQJECTNAME FouYill,C FROM STATION/REACH: Ba-1 ,D fAf NRiCZ oaebay NE DRAINADEAREA: 15.5 Aaes DESIGN FREQUENCY: 1 Year Sta. HYDRAULIC RESULTS ., hek Fbw ebatyllps A- (q It) Hydeu4'I Normal P550 n•0046 I Pmi0d lhrsl Red9OH DeWh BII 25 3.9 9 05 11 19 3.21 03 .39 0 49 S • 04170 30 wietn "= 1 0o u LINER RESULTS Not to Scale Reach 0.1h, T- IaWyAn*{y V,.I..., P.miaabk Cdabled Solely F-, Remarks Stapk Palt.n Phase Ci.. Type Demily Shea Stress (oal) Shem St,,. (psq Soa.4 P550 Vepetalion 3 C Mix 75.95%: 14.00 12 BB 1.09 STABLE SlapleE Soi F- Sand 3.250 2539 17, STABLE _Backhlrpil5aem NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 NORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. USER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS ***************************************************************************** PROJECT NAME: Foothills Commerce Center - Ph.1 PROJECT NO.: 09.00116 COMPUTED BY: RHH DATE: 11/19/2010 FROM STATION/REACH: Basin 1 TO STATION/REACH: Forebay NE DRAINAGE AREA: 15.5 Acres DESIGN FREQUENCY: 1-Year Storm ***************************************************************************** INPUT PARAMETERS Channel Discharge : 35.9 cfs (1.02 MA 3/s) Peak Flow Period : 0.5 hours Channel Slope : 0.417 ft/ft (0.417 m/m) Channel Bottom Width :5.0 ft (1.52 m) Left Side Slope :3:1 Right Side Slope :3:1 Channel Lining : P550 Staple E Mix 75-95% Permi. Shear(Tp) :14.00 psf (670.3 Pa) Phase = 3 Class = C Vegetation Soil = Fine Sand Allowable Soil Shear(Ta):3.25 psf (155.61 Pa) CALCULATIONS Initial Depth Estimate = 0.16 * (35.9 /(0.417^0.5))^0.375 = 0.72 ft (.22 m) Final Channel Depth (after 6 iterations) =.49 ft (0.15 m) Flow Area = (5.0 * 0.5)+(0.5 *0.49^2 * (3.0+3.0)) = 3.2 sq.ft (0.3 m^2) Wet Per. =5.0 +(0.5*(((3.OA2)+1)^.5 +((3.0"2)+1)^.5)) = 8.1 ft (2.5 m) Hydraulic Radius = (3.2 / 8.1) = 0.4 ft (0.1 m) Channel Velocity =(1.486/0.046)*(0.4^0.667)*(0.417^.5) = 11.2 fps (3.4 m/s) Channel Effective Manning's Roughness = 0.046 Calculated Shear (Td) = 62.4 * 0.49 * 0.417 = 12.88 psf (616.6 Pa) Safety Factor = (Tp/Td) _ (14.00 /12.88) = 1.09 Effective Stress on Blanket(Te) = 12.9*(1-0.75)*(/0.046)^2 = 2.54 psf (121.6 Pa) Safety Factor = (Ta/Te) = (3.25 /2.539) = 1.28 7Jatlt Pmencen Gtean ECMDSVEvicn1.3 PRDJECTNAME: FodHlls Comm>ce Centm Ph.t ? FROM STATION/REACH: B.-1 OSTAT10N REACH. Fwebar5- HYDRAULIC RESULTS Dacheige Peek Fbw eboy it. Aee I, It) Hy= Npimd I 1 ICfa1 Paiod llxsl ReOtl Depth Bt 9.5 0.5 d 31 2.20 0.30 036 )11/19201003/7PMCOMPUfECBYRHH PROJECT NO.. 09.00116 DRAINAGE AREA. -41-4.-.. --1DESIGN FREQUENCY: 1-Y-Sl- P550 (,0 0701 S -02270 30 WiAM1-5.D01t Not Ip Scale R each Matting Type tebAy Analysis VegetdipnCMiapMiivlcs Pamnsble Cddrbled $elety Faclw Remeiks Stage Patton 77 777- Dmdy Shea Suess [pip Sheai 9uevs Ip+fl Soapht F550 Vegetation 3 C Mrn 7595: 11.00 512 2.73 $TABtE StapleE Sd Fbe Sand 3.250 0.395 823 STABLE B. k to Inpd Sw., NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 NORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. USER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS ***************************************************************************** PROJECT NAME: Foothills Commerce Center - Ph.1 PROJECT NO.: 09.00116 COMPUTED BY: RHH DATE: 11/19/2010 FROM STATION/REACH: Basin 1 TO STATION/REACH: Forebay S DRAINAGE AREA: 4.1 Acres DESIGN FREQUENCY: 1-Year Storm ***************************************************************************** INPUT PARAMETERS ***************************************************************************** Channel Discharge : 9.5 cfs (.27 MA 3/s) Peak Flow Period : 0.5 hours Channel Slope : 0.227 ft/ft (0.227 m/m) Channel Bottom Width : 5.0 ft (1.52 m) Left Side Slope :3:1 Right Side Slope :3:1 Channel Lining : P550 Staple E Mix 75-95% Permi. Shear(Tp) :14.00 psf (670.3 Pa) Phase = 3 Class = C Vegetation Soil = Fine Sand Allowable Soil Shear(Ta):3.25 psf (155.61 Pa) CALCULATIONS Initial Depth Estimate = 0.16 * (9.5 /(0.227^0.5))^0.375 = 0.49 ft (.15 m) Final Channel Depth (after 8 iterations) _ .36 ft (0.11 m) Flow Area = (5.0 * 0.4)+(0.5 *0.36^2 * (3.0+3.0)) = 2.2 sq.ft (0.2 m^2) Wet Per. =5.0 +(0.4*(((3.0^2)+1)^.5 +((3.0^2)+1)^.5)) = 7.3 ft (2.2 m) Hydraulic Radius = (2.2 / 7.3) = 0.3 ft (0.1 m) Channel Velocity =(1.486/0.074)*(0.3^0.667)*(0.227".5) = 4.3 fps (1.3 m/s) Channel Effective Manning's Roughness = 0.074 Calculated Shear (Td) = 62.4 * 0.36 * 0.227 = 5.12 psf (245.2 Pa) Safety Factor = (Tp/Td) _ (14.00 /5.12) = 2.73 Effective Stress on Blanket(Te) = 5.1*(1-0.75)*(/0.074)^2 = 0.39 psf (18.9 Pa) Safety Factor = (Ta/Te) = (3.25 /0.395) = 8.23 @McGM A S S O C I A T E S Engineering • Planning Finance McGill Associates, PA. P.O. Box 2259, Asheville, NC 28802 55 Broad Street, Asheville, NC 28801 828-252-0575 Fax 828-252-2518 PROJECT: _, F } PROJECT NO.: ra DESCRIPTION: CALCULATED BY: F 1?? CHECKED BY: DATE: nU ?) SHEET NO. , OF I Pennit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one): D does ® does not incorporate a vegetated filter at the outlet. This system (check one): D does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the roblem: The entire BMP Trash debris is resent. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. egetation is too short or too F Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-RevA Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow _ Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4V6 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.0 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ( fill in the blanks) Permanent Pool Elevation 807.5 Sediment Removal Bottom 803.5- I Pe anen Pool -------------?-- Volume Sediment Removal Elevation 802.9 Volume 802.5 -ft Min. -------------------------------------------- Sediment Bottom Elevation 801.9 1-ft Storage Seduner Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project nameToothills Commerce Center BMP drainage area number:1 Print narne:Brad Cornwell Title:Public Utilities Director Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, 1 J t F?cYY? G1 1 IV' ud yl ?s , a Notary Public for the State of ?A VOII'Qk County of N(T(1J" 0 , do hereby certify that &Z4o p k, Oem iI L?(_ personally appeared before me this j -7 day of kOTM ? 1' O 10, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, KAREN DILLEMUTH WILKINS Notary Public, North Carolina Cleveland County My Commission Expires September 21, 2013 SEAL My commission expires ? j*,W ky a 0/. ) Form SW40I-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Address:P.O. Box 207, 824 West Grover Street, Shelby, North Carolina 28151 (28150) IBLEINC. November 16, 2010 BUNNELL-LAMMONS ENGINEERING, INC. GExEcHwcAL, ENNRONNENTAL AND CONSTRUCTION MATERIALS CONSULTANTS McGill Associates, P.A. 55 Broad Street Asheville, North Carolina 28801 Attention: Mr. Dale Pennell, P.E., P.L.S. Senior Project Manager Subject: Report of Geotechnical Exploration and Soil Infiltration Testing Foothills Commerce Center Phase I Wet Detention Basins Shelby, North Carolina BLE Project No: J10-6667-02 Dear Mr. Pennell: Bunnell-Lammons Engineering, Incorporated (BLE) is pleased to present the geotechnical exploration and infiltration test results for the proposed Phase I Wet Detention Basins for the Foothills Commerce Center project. The geotechnical exploration and infiltration testing was performed generally as described in BLE Proposal No. P10-0672 dated October 21, 2010. The exploration was authorized by your signing our Proposal Acceptance Sheet on November 5, 2010. SITE AND PROJECT DESCRIPTION We previously prepared a Report of Preliminary Geotechnical Exploration (BLE Project No. J09- 6667-01) dated September 24, 2009. The preliminary report should be read in conjunction with this report. We have been provided with a drawing titled "Overall Plan" by McGill Associates, P.A. dated July, 2010 showing the planned development, location of wet detention basins and the existing topographic contours. The site consists of a 145-acre tract of land generally located within the southeast quadrant of the intersection of Artee and Plato Lee Roads on the west side of Shelby, North Carolina (reference Figure 1). We understand that the property is planned to be an industrial business park. The geotechnical exploration and infiltration testing for this report are specific to the Phase I Wet Detention Basins, which consists of three basin locations. The basins range' in plan size from 11,926 to 35,628 square feet with maximum depths of 8 to 11 feet. A north-south trending creek divides the property with approximately % of the property located east of the creek. The property east of the creek is used as farmland. The remaining '/4 of the site located west of the creek was formerly a pine forest that was cleared some time ago and has since become overgrown with brush. The site topography slopes down from the north/northeast to the south/southwest to Little Beaver Dam Creek and then slopes up to the west to Plato Lee Road. The ground surface elevations range from about 800 to 880 feet. 105 FAIRvim ROAD, SuIrEA PHONE (828) 277-0100 LI I Report of Geotechnical Exploration and Soil Infiltration Testing November 16, 2010 Foothills Commerce Center - Phase I Wet Detention Basins BLE Project No. J10-6667-02 Shelby, North Carolina SUBSURFACE EXPLORATION Ten soil test borings (B-I to B-10) were previously performed as part of the Report of Preliminary Geotechnical Exploration dated September 24, 2009 (reference Figure 1). Three soil test borings (B- 11 to B-13) were performed specific to the Phase I Wet Detention Basins (reference Figure 2) with a Soil Sentry truck-mounted drill rig with 2 '/4-inch inside diameter hollow stem augers for the proposed project. One test boring was drilled near the center of each proposed wet detention basin to depths of 17 to 20 feet. The test boring depth was extended to a minimum of four feet below the proposed bottom at each wet detention basin. In addition, fourteen infiltration test borings (reference Figure 2) were drilled within the footprint of the wet detention basins. Three infiltration test borings (I-1 to I-3) were performed in Basin No. 1, three infiltration test borings (I-4 to I-6) were performed in Basin No. 2 and eight infiltration test borings (I-7 to I-14) were performed in Basin No. 3. Wet Detention Basin No. 1 Soil Conditions (B-11) - The surface consisted of approximately 5 inches of silty fine sand topsoil. The subsurface soils generally consisted of loose to firm, moist to wet, slightly micaceous silty fine to medium sand to a depth of about 4 feet. The loose to firm sand appeared to be alluvial (water deposited) soils. A chemical odor was noted in the soil sample obtained from 4 %2 to 6 feet. Beneath the alluvial sand, boring B-11 encountered residual soils that consisted of firm to dense, moist, slightly micaceous silty fine to medium sand to auger refusal at 18 feet. Residual soils are soils weathered in- place from the parent rock. Auger refusal likely occurred on partially weathered rock (MR). Groundwater Conditions - Groundwater was not encountered during the drilling operations. Groundwater was encountered at a depth of about 5 feet after 4 days. Based on sample coloration, soil moisture content and observed water levels, the hydrostatic water table was estimated to be at a depth of approximately 5 feet during the observation period. Wet Detention Basin No. 2 Soil Conditions (B-12) - The surface consisted of approximately 5 inches of slightly clayey, silty sandy topsoil. The subsurface soils generally consisted of loose to firm, moist, slightly clayey sandy silt to moist, silty fine to medium sand to the boring termination depth of 20 feet. This silty fine to medium sand is residual soil. Residual soils are soils weathered in-place from the parent rock. Groundwater Conditions - Groundwater was not encountered during the drilling operations or 4 days after the drilling operations. Based on sample coloration, soil moisture content and lack of water, the hydrostatic water table was estimated to be below the test boring depth of 20 feet. Wet Detention Basin No. 3 Soil Conditions (B-13) - The surface consisted of approximately 5 inches of slightly clayey, silty sand topsoil. The subsurface soils generally consisted of loose to firm, moist, slightly micaceous, slightly clayey, silty fine sand to a depth of about 14 feet. These soils are residual soils which are weathered in-place from the parent rock. Partially weathered rock or boulders were encountered from 14 to 17 feet. Auger refusal material was encountered at 17 feet. 2 IBLE. Report of Geotechnical Exploration and Soil Infiltration Testing November 16, 2010 Foothills Commerce Center - Phase I Wet Detention Basins BLE Project No. JI0-6667-02 Shelby, North Carolina Groundwater Conditions - Groundwater was encountered at a depth of 8 feet during the drilling operations and at a depth of 6 % feet after 4 days. Based on sample coloration, soil moisture content and observed water levels, the hydrostatic water table was estimated to be at a depth of 6 '/2 feet during the observation period. Groundater Considerations Groundwater levels may fluctuate several feet with seasonal and rainfall variations and changes in the water level in adjacent drainage features. Normally, the highest ground-water levels occur in late winter and spring and the lowest levels occur in late summer and fall. The seasonal high water table (SHWT) is estimated to exist at a depth of 5 feet in the vicinity of Wet Detention Basins No. 1 and 3 and below a depth of 20 feet in Wet Detention Basin No. 2. LABORATORY TESTING Natural Moisture Content The natural moisture content of select soil samples was determined in accordance with ASTM D2216. The moisture content of the soil is the ratio, expressed as a percentage, of the weight of water in a given mass of soil to the weight of the soil particles. The results are shown on the table below. Percent Finer than No. 200 Sieve A percent finer than a No. 200 Sieve test was performed on three soil samples to determine the fines content of these materials. After initial drying, the sample was washed over a U.S. Standard No. 200 sieve to remove the fines (particles finer than a No. 200 mesh sieve). This test was performed in a manner similar to that described by ASTM D1140. The results are shown on table 1 below. TABLE 1- LABORATORY TEST RESULTS Test Boring No. Depth (feet) Natural Moisture Content (%) Percent Finer than No. 200 Sieve (%) USCS Soil Classification B-11 13.5-15.0 12.5 24 SM B-12 13.5-15.0 26.7 37 SM B-13 8.5-10.0 38.7 24 SM INFILTRATION TEST PROCEDURE AND RESULTS A borehole was drilled and converted to a monitoring well utilizing solid 2-inch diameter PVC casing to a depth of 2 feet below the proposed pond bottom. The infiltration testing was performed in general accordance with Appendix C - Testing Requirements for Subsoils for Infiltration, which is a part of the Stormwater Best Management Practice Design Guide, Volume 2, Vegetative Biofilters dated September 2004 prepared by the U.S. Environmental Protection Agency. Upon completion of the infiltration (monitoring) well, and in accordance with the above referenced testing requirements, the well was then filled with clean water to a depth of 24 inches and allowed to pre- soak for 24 hours. Report of Geotechnical Exploration and Soil Infiltration Testing November 16, 2010 Foothills Commerce Center - Phase 1 Wet Detention Basins BLE Project No. J10-6667-02 Shelby, North Carolina Upon 24 hours later, the casing was refilled with clean water to the top of the casing and the water level was monitored (measured) from the top of the casing for 1 hour. This test procedure was repeated 3 additional times for a total of four times. The PVC pipe was left in place for additional testing if required. BLE can remove the PVC pipe and backfill the borehole with soil if no additional testing is required. The average infiltration rate for each wet detention basin is presented in the following tables. TABLE 2 - WET DETENTION BASIN NO.1 DWILTRATION TEST RESULTS Infiltration No. Average Infiltration Rate inches per hour) I-1 0.31 I-2 1.20 1-3 0.15 Average of I-1 to 1-3 0.55 TABLE 3 - WET DETENTION BASIN NO.2 INFILTRATION TEST RESULTS Infiltration No. Average Infiltration Rate (inches per hour I-4 61.73 I-5 86.56 I-6 30.34 Average of I-4 to 1-6 59.54 TABLE 4 - WET DETENTION BASIN NO.3 INFILTRATION TEST RESULTS Infiltration No. Average Infiltration Rate inches per hour 1-7 0.33 I-8 17.72 I-9 1.92 I-10 0.88 I-11 0.79 1-12 0.79 1-13 1.06 I-14 0.12 Average of I-7 to I-14 3.32 Average w/o high & low Values -8 and I-14 0.96 CONCLUSIONS AND ALTERNATE LINER RECOMAHNDATIONS The average infiltration test results of 0.55 and 0.96 inch per hour for proposed Basins No. 1 and 3, respectively are in the range of expected values for firm silty sand residual soil encountered by the test borings. The infiltration test result of nearly 60 inches per hour for Basin No. 2 is typical for loose sands. If these infiltration rates are higher than allowable for the basins, a low permeability liner would be required. Based on the sandy soils encountered by the test borings, a bentonite clay amended liner is recommended. 4 ? Report of Geotechnical Exploration and Soil Infiltration Testing November 16, 2010 Foothills Commerce Center - Phase I Wet Detention Basins BLE Project No. J10-6667-02 Shelby, North Carolina The bentonite for a low permeability liner should be free-flowing, powdered, high-swelling, sodium montmorillonite clay that is free of additives. The bentonite amendment should likely be in the range of 3 to 6 percent by dry weight. The soil used with the bentonite should be a silty sand with 100 percent passing the No. 4 sieve and a maximum of 35 percent (preferably 25 percent) passing the No. 200 sieve. The bentonite should be thoroughly mixed with the native soil using a tiller before adding sufficient water to promote compaction. All fill used for replacement of material that is undercut or liner should be uniformly compacted in 6-inch lifts to at least 95 percent of the standard Proctor maximum dry density (ASTM D 698) at 2 to 5 percent above the optimum moisture content of the bentonite soil mixture. We recommend laboratory tests be performed with samples of the bentonite/soil mixture to confirm the required bentonite to achieve the required permeability. At the start of construction, a test pad should be performed at the proposed finished grade within the basin. The test pad should be performed using the same equipment and construction methods as the actual liner. We recommend that the lift thickness be 8 to 10 inches, loose measure before compaction. Infiltration tests should be performed on the test pad to verify acceptable permeability rates. All existing topsoil, vegetation, disturbed soils, and soils containing organic matter or other deleterious materials should be stripped from within the proposed basins. After stripping and rough excavation grading, we recommend that areas to provide support for the liner be carefully inspected for soft surficial soils and proofrolled with a 25-ton, four-wheeled, rubber-tired roller or similar approved equipment. We recommend a visual inspection rather than proofrolling basin areas that are within 2 feet of the groundwater level. The proofroller should make at least four passes over each location, with the last two passes perpendicular to the first two. Any areas which wave, rut, or deflect excessively and continue to do so after several passes of the proofroller should be excavated to firmer soils. The excavated areas should be backfilled in thin lifts with suitable compacted fill materials. The proofrolling and excavating operations should be carefully monitored by an experienced engineering technician working under the direct supervision of the geotechnical engineer. We appreciate the opportunity to provide our professional services on this project. If you have any questions regarding this report, please contact us at (828)277-0100. Sincerely, BUNNELL-LAMMONS ENGINEERING, C'ARIr?l ? ??f?? c `????•• •./iii William T. Gentry III, P.E. = ' .. • 033927 Senior Engineer ? ••, /.1--16 - P"Z- NC Registration No. 33927 Gary L. Weekley, P.E. Senior Geotechnical Engineer NC Registration No. 8251 Attachments: Figure 1 - Boring Location Plan for Preliminary Geotechnical Exploration Figure 2 - Boring and Infiltration Location Plan for Phase I Wet Detention Basins Field Exploration Procedures Soil Test Boring Logs (3) Key to Soil Classifications and Consistency Descriptions 5 ? r all, s= 4 r a A m m O Y i Y m m 63 Z CV zm $ P= V) Co m .J W O J d'S ?Z m ? Z =Y I °? -? w O c 0 zZ C.D Fgz? C I ZCh ?+ G7? m? I ? Zo I 'cr N --? z I > zsW m ' ?W Zia I < ? ?y I I Q ? m I WOO W > U j Of oz cn , 9;11 Z ?I Qm° € .? reg Jill f " _ t 7 23 0 m N F 1 O is , V N O ? ? U I Z 31F W Z ? i I \ z " I?.-.1 V) °' : s? e Ei Z 3 m ?cF O o \ r" I M E I 0 0 000 '' o Field Exploration Procedures Soil Test Borings The borings were made by mechanically twisting a continuous flight steel auger into the soil. Soil sampling and penetration testing were performed in general accordance with ASTM D 1586. At assigned intervals, soil samples were obtained with a standard 1.4-inch I. D., 2-inch O. D., split tube sampler. The sampler was first seated 6 inches to penetrate any loose cuttings, and then driven an additional 12 inches with blows of a 140-pound hammer falling 30 inches. The number of hammer blows required to drive the sampler the final 12 inches was recorded and is designated the "standard penetration resistance. The penetration resistance, when properly evaluated, is an index to the strength of the soil and foundation supporting capability. Representative portions of the soil samples, thus obtained, were placed in glass jars and transported to the laboratory. In the laboratory, the samples were examined by a geotechnical engineer to verify the field classifications of the driller. Test Boring Records are attached, showing the soil descriptions and penetration resistance. ELMINC SOIL TEST BORING NO. B-11 PROJECT: Foothills Commerce Center Phase I Wet Detention Basins PROJECT NO.: J10-6667-02 CLIENT: McGill Associates DATE START: 10-22-10 END: 10-22-10 BUNNELL-LAIRMONS E NIMEERNG, INC. LOCATION: Shelby, North Carolina ELEVATION: 812.5 DRILLER: Metro Drill, Inc., R. Frye LOGGED BY: W. Gentry QE0TECHWCALA0Ew4m0NNDrIAL DRILLING METHOD: Soil Sentry Truck mount; 2-114 inch ID hollow stem auger CONSULTANTS DEPTH TO - WATER> INITIAL: -y! AFTER 4 DAYS: 1 5 CAVING> w ELEVATION/ SOIL DESCRIPTION SOIL TYPE a STANDARD PENETRATION RESULTS BLOWSIFOOT DEPTH (FT) a rn 2 5 10 20 30 40 50 70 90 5-inches of tan and gray, silty SAND -(topsoil) Loose, moist, silty, fine to medium SAND - (alluvium) 4 810 Firm, brown, tan, gray and white, wet, slightly micaceous, : : • : . 2 silty, fine to medium SAND - (alluvium) 7 "" 5 Chemical odor noted in sample 7 Firm, brown, tan and white, moist, slightly micaceous, silty, 3 6 fine to medium SAND - (residuum) 9 " 805 m to dense, black, brown and tan, moist, slightly Fir : .... 6 micaceous, silty, fine to medium SAND - (residuum) a ""' ®: 10 ........ :.._.._...._....:...:...:..:..:..:.. 800 11 , . : ;. 16 7 7 15 , . 32 :...:....:..:.._...._....:...:...: 795 Boring terminated at 18 feet due to auger refusal. No :...: ...... groundwater encountered at time of drilling, but was ........... _..._. 20 encountered at 5 feet after 4 days. 790- a 25 :...:....:..:......:....:...:......:..:.:.. 785 30 :... .....:..:..:.... .....:..:...:..:..:. _.. 780 i r 35 :...:....:.. _..:....: ....: .. ....:..:..:.:.. .... :...:.......:.._...._....:......._. 1 775 1 1 SOIL TEST BORING NO. B-11 Sheet 1 of 1 uLMINC SOIL TEST BORING NO. B-12 PROJECT: Foothills Commerce Center Phase I Wet Detention Basins PROJECT NO.: J10-6667-02 13MNELL-4. AIIIAIIIONS CLIENT: McGill Associates DATE START: 10-22-10 END: 10-22-10 ENCsNEERNG9 INC. LOCATION: Shelby, North Carolina ELEVATION: 866.0 GEOTECHWALANDEuvoommemL DRILLER: Metro Drill, Inc., R. Frye LOGGED BY: W. Gentry CONK LTAMS DRILLING METHOD: Soil Sentry Truck mount; 2-1/4 inch ID hollow stem auger DEPTH TO - WATER> INITIAL: Q dry AFTER 4 DAYS: 1 dry CAVING> M ELEVATION/ DEPTH (FT) SOIL DESCRIPTION SOIL i TYPE i f STANDARD PENETRATION RESULTS BLOWSIFOOT y 2 5 10 20 30 40 50 70 90 5-inches of reddish-brown, slightly clayey, silty SAND - ' _ : . . : 865 (topsoil) 5 .... .... .. .. Firm, reddish-brown, moist, slightly clayey, fine to medium a ............. f........... sandy SILT - (residuum) : . .. 5 7 ; .. ,.:.... 10 ...._............_..... ...... 7, _. sso reddish-brown and tan, moist, slightly clayey, Firm to loose 5 , fine to medium sandy SILT - (residuum) s - ....... ........... •: 2 : . :. 4 6 ..... ...... .............. _ :...: _ : : : : 10 . .... ... ... ....... .. • .. - 855 Loose to firm, tan and white, moist, silty, fine to medium : : SAND - (residuum) : .. ... . ................. ... _... _...._.. ,•:. ,.: 3 4 5 . 15 850 4 . :.....:... -. •. 5 ... 7 7, 7 7 20 845 Boring terminated at 20 feet. No groundwater encountered at time of drilling. 25 :.....:.. :...:....:..:.._...._ ....:.......... 840 :...:....:...:.. _.........:..........:..:.:.. ...... 30 .. .... :...:....:..... .....:.................... 835 i :..:..:.... .......... :....:..........:....:........ i 35 . . ? 830 i :.. .... . .. ..:..:........... .....:.............. SOIL TEST BORING NO. B-12 Sheet 1 of 1 ELIBINC SOIL TEST BORING NO. B-13 PROJECT: Foothills Commerce Center Phase I Wet Detention Basins PROJECT NO.: J10-6667-02 BLJNNELA?INIMONS CLIENT: McGill Associates DATE START: 10-22-10 END: 10-22-10 8WNdEERNG,11INIC. LOCATION: Shelby, North Carolina ELEVATION: 807.0 E A DRILLER: Metro Drill, Inc., R. Frye LOGGED BY: W. Gentry NvT"MB+w QE0TEC wAL ND DRILLING METHOD: Soil Sentry Truck mount; 2-1t4 inch ID hollow stem auger CONSULTANTS DEPTH TO - WATER> INITIAL: ?_Z 8 AFTER 4 DAYS- 1 6.5 CAVING> 3W w ELEVATION/ SOIL DESCRIPTION SOIL TYPE Ja STANDARD PENETRATION RESULTS BLOWSWOOT DEPTH (FT) Q y 2 5 10 20 30 40 50 70 90 5-inches of reddish-brown, slightly clayey, silty SAND - A ll. _ : _ (topsoil) 3 .... .... ...... :...:........ .. 805 Loose to firm, reddish-brown, moist, slightly clayey, silty, :.: :. .:. 3 a...;...... _.......:....._. fine to medium SAND .- .. :« Loose to firm, reddish-brown and black, moist, micaceous, 2 : : : 800 silty, fine SAND . :::. 5 ... ... . :...:* :..:.._ ....:.... 6 s 7 - 10 Trace rock fragments at 10 feet 795- - 22 50/5" PARTIALLY WEATHERED ROCK which sampled as wet rock 50/5•• 15 fragments with silty sand - :...:....:..:..........._..:...:..: 790 Boring terminated at 17 feet due to auger refusal. ...:....:..: ...... Groundwater encountered at 8 feet at time of drilling and at 6.5 feet after 4 days. . . : : _ _ : ; 20 ... .. .. .. .... .... .. 785 . ..:...:....:..:..:........:................. 25 :...:....:.._..:....:...._ ..:...:..:..:.... 780 :.._..:.. ...... :...:....................:........... 30 7' 7, .............:...:..:...... ? 775 ...... :...:....:..:.. .....:....:... .......:..:..:.. a .......... :....:......... ......:.......... ....... 35 :....:......:............:...:. 770 :........................ 7, 7, i SOIL TEST BORING NO. B-13 3 Sheet 1 of 1 IBLE.. KEY TO SOIL CLASSIFICATIONS AND CONSISTENCY DESCRIPTIONS BUNNELL-LAMMONS ENGINEERING, INC. ASHEVILLE, NORTH CAROLINA Penetration Resistance* Relative Particle Size Identification Blows per Foot Density Balder. Greater than 300 mm SANDS Cobble: 75 to 300 mm 0 to 4 Very Loose loose Gravel: Coarse -19 to 75 mm 5 to 10 11 to 20 Firm Fine - 4.75 to 19 mm 21 to 30 Very Firm Dense Sand: Coarse - 2 to 4.75 mm 31 to 50 over So Very Dense Medium - 0.425 to 2 mm Fine - 0.075 to 0.425 mm Silt & Clay: Less than 0.075 mm Penetration Resistance* Consistency Blows per Foot SILTS and CLAYS 0 to 2 Very Soft ft 12 Number of blows in first 6 inches 3 to 4 Firm 15 Number of blows in second 8-inches 5 to 8 Stiff 18 Number of blows in third 6-inches 9 to 15 16 to 30 very Stiff 31 to 50 Hard over 50 Very Hard *ASTM D 1586 ® Grab Sample Split Spoon Sample ® ® Undistrurbed Sample • Well-graded Gravel GW 0 a Q0 Poorly-graded Gravel O o GP KEY TO DRILLING SYMBOLS _RL Groundwater Table at Time of Drilling A Groundwater Table 24 Hours after Completion of Drilling KEY TO SOIL CLASSIFICATIONS Low Plasticity Clay CL Sandy Clay CLS Clayey Silt SM Sand MH Sandy Silt Topsail MLS e> TOPSOIL 5acm 15,911111111 Partially Weathered Rock Silty Clay Sand Bedrock BLDi2CBBL CL-ML SW BEDROCK High Plasticity Clay Silt CH ML Clayey Sand Concrete SC A5 M E_4rL_<