HomeMy WebLinkAbout20090955 Ver 1_More Info Received_201012022301 Rexwoods Drive 919.881.9939 Suite 200 919.881.9923 fax Dewberry Raleigh, North Carolina 276072 www.dewberry.com oq - DRSS u .96 December 1, 2010 Ms. Amy Chapman Environmental Senior Specialist NC Division of Water Quality 401 /Wetlands Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Reference: City of Raleigh Public Utilities Department Orleans Place Sanitary Sewer Improvements PCN Application Revision to 09-0955 (Wake) Dewberry Project No. 50005267 Dear Ms. Chapman: Enclosed are three sets of a Pre-Construction Notification (PCN) Application Form, supporting documentation, and permit processing fee of $240 for the modification of DWQ Permit #09-0955 (Wake), dated September 10, 2009, for the project: Orleans Place Sanitary Sewer Improvements. The project, as originally planned and permitted, was to replace approximately 900 linear feet of failing clay sanitary sewer in Zone 1 buffer. Approximately half of the pipe was to be replaced in its current location and half was to be relocated outside of the Neuse River Riparian Buffer. The presence of rock; however, has made the relocation portion of the project economically infeasible. The Orleans Place Sanitary Sewer Improvements project has been revised to replace the entire length of failing clay sanitary sewer in place with ductile iron pipe. It is our understanding through recent discussions with City of Raleigh Public Utilities Department that replacement of sanitary sewer within an existing easement in the Neuse River Riparian Buffer will not require mitigation. Measures will be taken to minimize the proposed impacts. Erosion control devices will be installed, no trees or vegetation will be cut outside of the limits of construction, tree stumps will be preserved along the top of bank, and the disturbed area will be stabilized by seeding and mulching, jute matting, or geotextile/rip rap/willow staking immediately after completion. A sanitary sewer bypass ("pump- around") will be installed using pumps, flexible hose, and generators. Conventional construction equipment (trackhoes, dump trucks, trench box) will be used for the installation. Please call with any questions regarding this permit modification. Sincerely, Dewberry & Davis, Inc. -7 13A Mary T. Brice, P.E. LEED AP Project Manager Enclosures PA50005267\Adm\Permiis\0rleans Place\PCN\Permit Modification\2010.12.01 - Cover Letter.doc l? DE 0 1CIi7 ftulM?D STOFif.;;t;j fR B(?CN Dewberry & Davis, Inc. W AA r?R oNiii? -c C) a -pass u 2, Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ? Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ? No For the record only for Corps Permit: ? Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Orleans Place Sanitary Sewer Replacement 2b. County: Wake 2c. Nearest municipality / town: Raleigh 2d. Subdivision name: Quail Hollow 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: + 3b. Deed Book and Page No. Ity 3 c. Responsible Party (for LLC if applicable): City of Raleigh (Public Utilities Department) PEA* ? 201,7 3d. Street address: 222 West Hargett Street BTp?,? tiU1y 3e. City, state, zip: Raleigh, NC 27602 3f. Telephone no.: 919-890-3400 3g. Fax no.: 919-890-3600 3h. Email address: Page I of 11 PCN Form - Version 1.3 December 10, 2008 Version I 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Mary T. Brice, P. E. 5b. Business name (if applicable): Dewberry & Davis, Inc. (Dewberry) 5c. Street address: 2301 Rexwoods Drive, Suite 200 5d. City, state, zip: Raleigh, NC 27607 5e. Telephone no.: 919-881-9939 5f. Fax no.: 919-881-9923 5g. Email address: mbrice@dewberry.com Page 2 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): within a sanitary sewer easement located on property owned by Quail Hollow Swim Club (PIN 1716133506) Latitude: 35.847428 Longitude: - 1 b. Site coordinates (in decimal degrees): 78.624581 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 5.53 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Big Branch proposed project: 2b. Water Quality Classification of nearest receiving water: C;NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Project site is in existing and new sanitary sewer easement located on Quail Hollow Swim Club property at 800 Orleans Place, Raleigh. Land use in the vicinity of the project is residential. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d. Explain the purpose of the proposed project: replacement of existing 15" clay sanitary sewer and relocation of a portion of the sanitary sewer out of the Neuse River Buffer 3e. Describe the overall project in detail, including the type of equipment to be used: An investigation behind the Quail Hollow Swim Club revealed that a portion of the existing clay sanitary sewer (installed prior to 1972 and largely located within Zone 1) is in poor condition. The proposed project replaces approximately 893 LF of 16" sanitary sewer mostly in Zone 1 using the existing easement, alignment and general depth and 199 LF of 8" sanitary sewer in a combination of new and existing easement. No trees or vegetation shall be cut or damaged outside of the City of Raleigh Easement and/or limits of construction. Tree stumps shall be preserved along the top of bank. Contractor shall not remove tree stumps on the stream side of the sanitary sewer alignment unless otherwise directed by the Owner. A sanitary sewer bypass ("pump-around") will be installed using pumps, flexible hose, and generators. Conventional construction equipment (trackhoes, dump trucks, trench box) will be used for the installation. Sediment control devices will be installed. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / F-1 Yes No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ? No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. On September 10`h, 2009 we received approval from your office for DWQ project number 09-0955 (Wake). A copy of the approved permit is attached. The approval included 12,210 square feet of Zone 1 disturbance and 1,470 square feet of Zone 2 disturbance. These numbers have been revised due a to a realignment of the sanitary sewer line as shown on the attached plans. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W 1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - Permanent (P) or (PER) or intermittent (Corps - 404, 10 DWQ - non-404 stream width length (linear Temporary (T) (INT)? , other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Tem orar T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then com lete the chart below. 5a. Pond ID 5b. Proposed use or purpose of 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) impact Stream name mitigation (square feet) (square feet) or Temporary required? T replacement ? Yes 131 ®P ? T of SS in ex. Big Branch ® No 23,353 3,352 easement replacement of sanitary ? Yes B2 ®P ? T sewer in Big Branch ® No 362 new easement replacement B3 ? P ®T of sanitary Big Branch s ? 2,626 sewer in ex. No easement 6h. Total buffer impacts 23,353 6,340 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. This is a replacement of existing sanitary sewer line that is in poor condition within City of Raleigh Easement. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Erosion control devices will be installed prior to construction. No trees or vegetation shall be cut or damaged outside of the City of Raleigh Easement and/or limits of construction. Tree stumps shall be preserved along the top of bank. Contractor shall not remove tree stumps on the stream side of the sanitary sewer alignment unless otherwise directed by the Owner. All construction will take place within existing easement except for a small area consisting of 362 SF of Zone 2 disturbance. The disturbed area will be stabilized by seeding and mulching, jute matting or geotexti le/rip-rap/wil low staking immediately after completion. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ? No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this project? ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ®No Comments: project does not necessitate stormwater collection 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: project will disturb 0.75 acres 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Raleigh ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ® Other: not required 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Project is the replacement of sanitary sewer which conveys wastewater to the City of Raleigh's Neuse River Waterwater Treatment Plant. The project will generate no wastewater. Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ? No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ? No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? 7 E Yes ? No 8b. If yes, explain how project meets FEMA requirements: portions of the installation in the floodplain will be installed 2' above 100 year flood plain. 8c. What source(s) did you use to make the floodplain determination? FIRM map # 3720171600J Effective date May 2, 2006 J. Russell Allen, City Manager City of Raleigh Post Office Box 590 0 Le /Z-// //a Raleigh, North Carolina 27602 , Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version r 1. ., d ,two how ?? ? ,?, "• ,. ?,, } 0 / ` Y ? ?f? bUx SITE af, ;? a 4 f ?; i • ,,? _`_ t F is ?;.• I f. sl $ j. / I - l -C /•h ivf e" ertr.' r :i - ? 1 .a;? - Cl?• 1 n ?, ? \ Y < ?d l p' y -Anu i? r? `? 7 3 1• r r SCALE 1:24000 i{ ?? _, \ \ ?. 0 1 MILES 'rr `` ?Z ,` •? ? y? 4 ?\ " 0 1000 YARDS • '? ?/ r 0 1 KILOMETER 9* W =7D Name: RALEIGH EAST Location: 035° 50'50,74" N 078° 37'28.49" W Date: 8/18/2009 Caption: Orleans Place Sanitary Sewer Replacement Scale: 1 inch equals 2000 feet Copyright (C) 1998. Maptech. Inc. Soil Map-Wake County, North Carolina M I? r M M r 35° 51'4" 35° 50' 36" V% t llik? Map Scale. 1.4,130 if punted on A size (8.5" x 11 ") sheet. 'r N Meters 0 35 70 140 210 Feet 0 150 300 600 900 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 35° 51'4' 35° 50'35" 8/19/2009 Page 1 of 3