Loading...
HomeMy WebLinkAbout20061151 Ver 3_Triage Comments_20101201DWQ# Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 Use this form instead of writing inside the folder Triage omment Sheet l r 3 - -C? Date: itAWro, Date: 10 to Date: ? Issue Project (Reviewer 1) ? Iss e w'th conditi ns (Re wer 1) ?? vlill Issue Project (Reviewer 2) VI' W Iro U 4 Issue with conditions (Reviewer 2) ? ? ? More Information (Reviewer 1) Return Application (Reviewer 1) Send to Regions (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 2) SATriage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY 06-1151v6 Salem Village Subdivision (Apex Peakway) AML Comments December 1, 2010 Please address the following issues with regard to the conceptual stormwater management plan: a. BMP 1 is proposed to treat portions of Phases 2A and 3. Please provide evidence that the BMP is adequately sized to handle the flow from both of these two phases. Also, include a note on the plans that states that if the two phases are not constructed simultaneously, then there will be adequate Sediment and Erosion Control Devices to treat runoff from the later phase prior to stormwater being discharged to BMP 1. b. It appears that a portion of the drainage area to BMP 1 is at a lower elevation than the BMP itself. c. The delineation of the drainage areas does not appear to follow contour lines. d. Significant portions of Phases 3 or 4 are not included in the drainage areas of any of the conceptual BMPs. Please either rework the drainage areas to include these unaccounted for areas or provide an explanation as to why those areas were omitted.