Loading...
HomeMy WebLinkAbout20201780 Ver 1_More Info Requested_20201231Strickland, Bev From: Goss, Stephanie Sent: Thursday, December 31, 2020 11:18 AM To: Love, Chris Subject: Martin Grade Stabilization, Project # 20-1780 Attachments: Example of Riparian Buffer Impact map.pdf Chris, I am currently review the above referenced project and the following is required in order to complete the review: 1. The application is missing an impact map. 2. The stream needs to be shown on the impact map. 3. Show the two zones of the riparian buffer on the impact map as measured from the top of the streambank. Zone 1 is measured 30 feet from the top of the stream bank, and Zone 2 is measured from 30 feet to 50 feet. These riparian buffers parallel the stream pattern. 4. Impact map must depict the footprint of the proposed permanent impacts within Zone 2. 5. Please include an example of the catch basin and HDPE pipe. Concentrated flow is not allowed in the riparian buffer. Water must be dispersed in a sheet flow manner. Is this plan effectively piping/channelizing the water and then dispersing it into the stream? I have attached an example of an impact map. If you have any questions, do not hesitate to contact me. Stephanie Z. Goss Environmental Program Consultant Division of Water Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 276og 919-791-4256 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Example of Riparian Buffer Impact Map House Proposed Existing Deck Include square footage r i ' of new impact in Zone D e 2 on rrrap Zone 2 N euse Buffer 0' Zone I Neese Buffer Stream Top of Bank