HomeMy WebLinkAbout20061804 Ver 36_Stormwater Rev Set_20201231NORTHFORTSECTION7PB69PG243NORTHFORTSECTION9PB66PG49NORTHFORTSECTION8PB64PG79CE-01BUFFALOROADTYPICALLOTSECTIONSTREET''A''STREET''F''STREET''E''STREET''G''STREET''C''STREET'
'B'
'STREET''B''S
T
R
E
E
T
''
B
''STREET''D''LI
NE"A"
BUFFALOROADSTREET''A''STREET''F''STREET''E''STREET''G''STREET''C''STREET'
'B'
'STREET''B''S
T
R
E
E
T
''
B
''STREET''D''NORTHFORTSECTION7PB69PG243NORTHFORTSECTION9PB66PG49NORTHFORTSECTION8PB64PG79CE-08
STREET''A''STREET''F''STREET''E''STREET''G''STREET''C''STREET'
'B'
'STREET''B''S
T
R
E
E
T
''
B
''STREET''D''NORTHFORTSECTION7PB69PG243NORTHFORTSECTION9PB66PG49NORTHFORTSECTION8PB64PG79CE-14
VEGETATED SHELF LANDSCAPE PLAN
VEGETATED SHELF = 31405 SF
ALL PLANTS SHALL BE 3" CONTAINER PLANTS,
THERE SHALL BE A MINIMUM OF 3 PLANT
SPECIES, AND A MINIMUM OF 50 PLANTS PER
200 SF OF VEGETATED SHELF. SUBSTITUTION
OF THE LISTED PLANTS ARE ALLOWED BUT
MUST BE APPROVED BY THE ENGINEER.
BELOW PERMANENT POOL
Botanical Name Common Name QTY.
Iris virginica Blue Flag Iris 284
Ludwiga spp. Primrose Willow 284
Pontederia cordata Picklerweed 284
POND SIDE SLOPES
Vegetate w/Centipede Seed @ a rate of
60 lbs./Ac.
� SCM
WET P
20' WIDE CONCF�_E
SPILLWAY WITH
CLASS B RIP RA
SLOPE /
/
/
/
a.
ao 0 .
STAGE/STORAGE TABLE
CONTOUR
INCREMENTAL
TOTAL
STAGE
ELEVATION
AREA (SF)
STORAGE (CF)
STORAGE (CF)
0
262.00
18,460
0
0
1.00
263.00
20,623
19,542
19,542
2.00
264.00
22,843
21,733
41,275
3.00
265.00
25,119
23,981
65,256
4.00
266.00
27,451
26,285
91,541
4.50
266.50
29,839
14,323
105,863
NOTE:
CONTRACTOR TO COMPACT BOTTOM OF POND TO
ENSURE INFILTRATION IS LESS THAN 0.01 IN./HR.
NOTE:
A PORTABLE PUMP SHALL BE USED FOR PUMP
DOWN AND MAINTENANCE.
�
3
1
6:1
VEGETATED
SHELF
1.48 FT. FREEBOARD - 1 YEAR STORM 265.02
1
2
�1
BOTTOM
FOREBAY 257.00
2
/5
1F
PERMANENT
POOL 262.00
BOTTOM
POND 256.00
WET DETENTION POND PROFILE
NOT TO SCALE
� RIP RAP OUTLET
PROTECTION
LENGTH = 21'
START WIDTH = 11'
END WIDTH = 25'/
I DEPTH = 18"
\ \ i FES INV \
24" RCP 257.0 f>>
1.0� W 6'
FE�5 _- - r / • � 6, \
6
TE
� ANTI -SEEP COLLAR
4'X6'\�BOW W/
TRASI RACK
TOP: 26 00
INV. IN (3. "). 262.00
INV. OUT (24" . 57.55
6' WIDE (6:1)
SUBMERGED
VEGETATED SHELF
3,405 SF
�� _�, -,, Z � �,� 1
C
1Z
1�A-
U
SCALE: 1 " = 20'
0 20 40 50 60
AND THE ANGEL SAID TO THEM, "FEAR NOT: FOR BEHOLD, I BRING YOU GOOD TIDINGS OF GREAT JOY, WHICH SHALL BE TO ALL PEOPLE.
FOR UNTO YOU IS BORN THIS DAY IN THE CITY OF DAVID A SAVIOR, WHO IS CHRIST THE LORD. LUKE 2: 10-11
TOP OF
DAM 266.50
3
1�
6:1
2 VEGETATED
1 SHELF
;•1
oil 4:1 1111111100,14101100
NOT TO SCALE
A'\,W DROP INLET
TRASH RACK
264.00
3.5" PVC ORIFICE
@ 262.00
W/ TEE (SEE
DETAIL)
BEFORE YOU DIG,
CALL
0
0
NORTH CAROLINA
&NE CALL CENTER
www.ncocc.org
3.5" PVC CAP WITH
SCREW TYPE PLUG
TOP ELEV. 264.75
NORMAL POOL =
INV. ELEV. 262.00
BOTTOM ELEV. 261.50
3.5 )1 PVC
Conversion Procedure
Sediment Basin to Wet Detention Pond
1. After the site is completely stabilized, contact Stocks Engineering @
252-459-8196 for verification of completion and stabilization.
2. Contact Johnston County for approval to remove
all temporary erosion control measures.
3. Upon approval from Johnston County, begin the conversion of the wet
pond from a temporary sediment trap to a permanent BMP as follows.
4. If standing water is in the basin, contractor shall pump the water out
discharging through a silt bag.
5. Remove the skimmer which is connected to the riser and convert to
the permenent orifice as shown below in detail.
6. Bring the side slopes surrounding the pond and vegetated shelf to the
proposed grade.
7. Contractor shall verify pond depth and muck out sediment to the
design depth of the pond.
8. Excavated material must be disposed of in an approved off -site location.
9. Care must be taken to prevent any sedimentation/re-sedimentation
during this process, as sediment deposits in the bottom of the pond
may affect the depth. If any sedimentation occurs during this process,
Contractor shall remove sediment immediately.
10. Contact Stocks Engineering @ 252-459-8196 to inspect excavated pond
before continuing construction.
11. Upon approval of Stocks Engineering, continue constructing pond per details.
Establish appropriate permanent vegetation around pond as soon as possible.
12. Upon completion of pond construction, remove sediment from silt fence
and dispose of at an approved off -site location. Plant vegetated shelf
and seed and mulch side slopes.
13. Contact Stocks Engineering @ 252-459-8196 to inspect completed pond
before placing pond in service.
orn
r00
x1
0
mL0
o^
N
L0
N
w
Z
0
0
U
0
z
Of
Ld
Z
0
Z
w
Z
Cn
�
U
O
WF
w
w
LUch
F-
Z00
oLQ
•
�
Z N
MC�
Z
ZF-
w
J
W
0
¢
w'
=
oa
00 Z
BLN=C-1874
C ARI �o"",,,.
Q�•o•Ess. i '�
SEAL
19843
'PIAEL 5�
It
Xu"Z�
/ „/„ /2020
SCM #1 DETAIL
REVISIONS
11/20/20 QAQC
12/31/20 STORMWATER REV.
FILE NO. 2020-013
HORZ. SCALE:
1"=50'
VERT. SCALE:
NONE
�Af
O
•
`ram �FENV �221. fY
SO
I I I I 41X6' BOX
' TRASH RACK
TOP: 241.00
IINV. IN (4"): 238.00 �
I I I I I INV. OUT (24"):235.10
6' WIDE SUBMERGED
/VEGETATED�SHELF (6:1)
2,235 SF
ilj'lie
.00
6:1
VEGETATED
SHELF
2.45 FT. FREEBOARD
1
2
�1
BOTTOM
FOREBAY 234.00
2
1�
/5
1F_
1 YEAR STORM 241.05 13
�
PERMANENT
� POOL 238.00
6:1
2 VEGETATED
1 SHELF
WET DETENTION POND PROFILE
NOT TO SCALE
STAGE/STORAGE TABLE
BOTTOM
POND 229.00
CONTOUR INCREMENTAL
TOTAL
STAGE
ELEVATION
AREA (SFI�5TORAGE
(CF)
STORAGE (CF)
0
238.00
19,782
0
0
1.00
239.00
21,688
20,735
20,735
2.00
240.00
24,135
22,912
43,647
3.00
241.00
26,921
25,528
69,175
4.00
242.00
30,595
28,758
97,933
5.00
243.00
35,244
32,920
130,852
5.50
243.50
38,734
18,495
149,347
OUTLET STRUCTURE
NOT TO SCALE
4'YF)' DROP INLET
TRASH RACK
241.00
TOP OF
DAM 243.50
BEFORE YOU DIG,
CALL
a0
0
1
NORTH CAROLINA
ONE CALL CENTER
www.ncocc.org
NOTE:
CONTRACTOR TO COMPACT BOTTOM OF POND TO
ENSURE INFILTRATION IS LESS THAN 0.01 IN./HR.
NOTE:
A PORTABLE PUMP SHALL BE USED FOR PUMP
DOWN AND MAINTENANCE.
VEGETATED SHELF = 21235 SF
ALL PLANTS SHALL BE 3" CONTAINER PLANTS,
THERE SHALL BE A MINIMUM OF 3 PLANT
SPECIES, AND A MINIMUM OF 50 PLANTS PER
200 SF OF VEGETATED SHELF. SUBSTITUTION
OF THE LISTED PLANTS ARE ALLOWED BUT
MUST BE APPROVED BY THE ENGINEER.
BELOW PERMANENT POOL
Botanical Name Common Name QTY.
Iris virginica Blue Flag Iris 187
Ludwiga spp. Primrose Willow 186
Pontederia cordata Picklerweed 186
POND SIDE SLOPES
Vegetate w/Centipede Seed @ a rate of
60 lbs./Ac.
Conversion Procedure
Sediment Basin to Wet Detention Pond
4" PVC ORIFICE
@ 238.00 1.
After the site is completely stabilized, contact Stocks Engineering @
W/ TEE (SEE
252-459-8196 for verification of completion and stabilization.
DETAIL) 2,
Contact Johnston County for approval to remove
all temporary erosion control measures.
3.
Upon approval from Johnston County, begin the conversion of the wet
pond from a temporary sediment trap to a permanent BMP as follows.
4.
If standing water is in the basin, contractor shall pump the water out
discharging through a silt bag.
5.
Remove the skimmer which is connected to the riser and convert to
the permenent orifice as shown below in detail.
6.
Bring the side slopes surrounding the pond and vegetated shelf to the
4" PVC CAP WITH
proposed grade.
SCREW TYPE PLUG 7.
Contractor shall verify pond depth and muck out sediment to the
TOP ELEV. 240.75
design depth of the pond.
8.
Excavated material must be disposed of in an approved off -site location.
9.
Care must be taken to prevent any sedimentation/re-sedimentation
during this process, as sediment deposits in the bottom of the pond
NORMAL POOL =
may affect the depth. If any sedimentation occurs during this process,
INV. ELEV. 238.00
Contractor shall remove sediment immediately.
10.
Contact Stocks Engineering @ 252-459-8196 to inspect excavated pond
before continuing construction.
BOTTOM ELEV. 11.
Upon approval of Stocks Engineering, continue constructing pond per details.
277.50, 4" PVC
Establish appropriate permanent vegetation around pond as soon as possible.
12.
Upon completion of pond construction, remove sediment from silt fence
and dispose of at an approved off -site location. Plant vegetated shelf
and seed and mulch side slopes.
13.
Contact Stocks Engineering @ 252-459-8196 to inspect completed pond
before placing pond in service.
o�
r00
XI
0 L0
m
o^
N
N
w
Z
0
0
U
0
Z
Of
w
Z
0
Z
w
Z
Cn
U
W��
w�
w
WU)
Z
Z00
oLQ
Z N
M
= U
Z
Z�w
W>
0J
w
Z
00
BLN=C-1874
Q�•o•EssR.
= Q� SEAL � =
19843
4,
'PHAEL 5��
/ „/„ /2020
SCM #2 DETAIL
REVISIONS
11/20/20 QAQC
12/31/20 STORMWATER REV.
FILE NO. 2020-013
HORZ. SCALE:
1"=50'
VERT. SCALE:
NONE
r AND THE ANGEL SAID TO THEM, "FEAR NOT: FOR BEHOLD, I BRING YOU GOOD TIDINGS OF GREAT JOY, WHICH SHALL BE TO ALL PEOPLE.
l FOR UNTO YOU IS BORN THIS DAY IN THE CITY OF DAVID A SAVIOR, WHO IS CHRIST THE LORD. LUKE 2: 10-11